Self-storage warehouse
406 EAST 62 STREET
💬 Discuss this project
1963Year Built
6Stories
E7Building Class
C8-4Zoning
177,920 sfGross Floor Area
3Units
LL97 Covered2 Open Violations ▸FISP: SAFE
Self-storage warehouse · Owner of record: SM I MMS, L.L.C. · 25,575 sf lot · 6.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Roof14p · 3 filings · 20 docs
Floor 812p · 1 filing · 20 docs
Floor 712p · 1 filing · 20 docs
Floor 612p · 1 filing · 20 docs
Floor 515p · 6 filings · 20 docs
Floor 414p · 6 filings · 20 docs
Floor 314p · 6 filings · 20 docs
Floor 214p · 6 filings · 20 docs
Floor 19p · 6 filings · 20 docs
Site & exterior19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SM MMS MANAGEMENT2307/08/2026
SM I MMS LLC603/22/2026
400 EAST 62ND PROPERTIES, LLC403/21/2026
EDISON CONSTRUCTION MANAGEMENT403/21/2026
EAST 62ND MINI STORAGE PROP403/21/2026
EAST 62ND MINI STORAGE PROPERTIE403/21/2026
EAST 62ND MINISTORAGE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2021$326.9M—EAST 62ND MINISTORAGE PROPERTIES, LLC → SM I MMS, L.L.C.$1,837/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG404/16/2025
PAUL PERDEK, PROF. ENG. PLLC205/16/2024
S.M. BERGER ARCHITECTURE PC112/06/2023
ADG ENGINEERING112/06/2023
FISKAA ENGINEERING311/02/2021
BAILEYS ENGINEERING PC110/10/2018
NORMAN C. LOK, PE503/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
JAM CONSULTANTS, INC.803/21/2026
LMS-ACE SERVICES203/21/2026
LOUIS STRIAR1003/21/2026
C6103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor1307/08/2026
INTERBORO SIGN ELECL MAIScaffold507/08/2026
RINNOVO CONSTRUCTION, LLCGeneral Contractor407/08/2026
DEMARI SERVICES INCGeneral Contractor307/08/2026
ROBERT S. COVELLOElectrical103/22/2026
J.A. LEE ELEC SVCS LLCElectrical103/22/2026
TRV MECHANICAL CONTRACTORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578404/16/2025
METRIC CONSULTING AND INS1803112/06/2023
CROSSCHECK INSPECTION SER544311/02/2021
Building Lifecycle
All (158)Filed (18)Permit Issued (17)Signed Off (9)Facade (FISP) (24)Violation (60)Special Inspection (30)
08/27/2025
Cycle 10 facade report signed — SAFE
08/21/2025
Cycle 10 facade report submitted
07/30/2025
Cycle 10 facade inspection completed
07/24/2025
Signed off — Alteration
M00768456-I1
07/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01048788-I1
07/09/2025
Signed off — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879514-I1
04/28/2025
Special inspection requirement — Masonry
Anthony Stasio
04/28/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
04/28/2025
Special inspection requirement — Final
Anthony Stasio
04/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
04/16/2025
Filed — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879514-P3
03/26/2025
Permit issued — Suspended Scaffold
M01028272-I1-SC
02/24/2025
Cycle 9 facade report submitted
02/24/2025
Cycle 9 facade report signed — SAFE
02/18/2025
Cycle 9 facade inspection completed
01/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2024
Cycle 9 facade report submitted
12/17/2024
Cycle 9 facade report signed — UNSAFE
12/12/2024
Cycle 9 facade inspection completed
10/01/2024
Violation issued (ECB, open)
Construction
08/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2024
Permit issued — Sidewalk Shed
M00768456-I1-SH
05/18/2024
Violation issued (ECB, closed)
Construction
05/18/2024
Violation issued (ECB, closed)
Construction
05/17/2024
Permit issued — Supported Scaffold
M01048788-I1-SF
05/16/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01048788-I1
05/16/2024
Permit issued — General Construction
M00879514-I1-GC
04/12/2024
Permit issued — Suspended Scaffold
M01028272-I1-SC
04/11/2024
Filed — Alteration
Renewal of SR23/1971
M01028272-I1
01/11/2024
Permit issued — Structural
M00875085-S1-ST
12/12/2023
Permit issued — General Construction
M00875085-I1-GC
12/06/2023
Filed — Alteration
LOBBY RENOVATION/OFFICE BUILDOUT INCLUDING REMOVAL AND INSTALLATION OF ARCHITECTURAL PARTITIONS, INSTALL NEW STORAGE UNITS AND NEW EGRESS DOOR.. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00875085-I1
12/06/2023
Filed — Alteration
LOBBY RENOVATION/OFFICE BUILDOUT INCLUDING REMOVAL AND INSTALLATION OF ARCHITECTURAL PARTITIONS, INSTALL NEW STORAGE UNITS AND NEW EGRESS DOOR.. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00875085-S1
12/05/2023
Filed — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879514-P2
11/29/2023
Filed — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879514-P1
11/29/2023
Special inspection requirement — Masonry
Anthony Stasio
11/29/2023
Special inspection requirement — Post-installed Anchors
Anthony Stasio
11/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
11/29/2023
Special inspection requirement — Final
Anthony Stasio
11/21/2023
Cycle 9 facade report submitted
11/20/2023
Cycle 9 facade report signed — UNSAFE
11/17/2023
Cycle 9 facade inspection completed
09/05/2023
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
09/05/2023
Special inspection requirement — Final
ERIC BERLENT
09/05/2023
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
09/05/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/05/2023
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
07/31/2023
Permit issued — Sidewalk Shed
M00768456-I1-SH
07/12/2023
Permit issued — General Construction
M00879514-I1-GC
06/14/2023
Filed — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879514-I1
10/13/2022
Signed off — Alteration
Filing for mechanical renovations as per plans filed. No change in use, egress or occupancy.
M00279279-I1
08/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Permit issued — Sidewalk Shed
M00768456-I1-SH
07/21/2022
Filed — Alteration
M00768456-I1
07/20/2022
Cycle 9 facade inspection completed
05/26/2022
Cycle 9 facade report signed — UNSAFE
11/03/2021
Special inspection requirement — HVAC and service water heating system controls
EUGENE BIFULCO
11/03/2021
Special inspection requirement — HVAC insulation and sealing
EUGENE BIFULCO
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC03/26/2025
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I07/09/2024
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I05/17/2024
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC05/16/2024
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC04/12/2024
DOB NOWStructuralPermit IssuedRINNOVO CONSTRUCTION, LLC01/11/2024
DOB NOWGeneral ConstructionPermit IssuedRINNOVO CONSTRUCTION, LLC12/12/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I07/31/2023
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC07/12/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I08/02/2022
DOB NOWMechanical SystemsSigned-offTRV MECHANICAL CONTRACTOR10/26/2021
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I10/25/2018
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/28/2018
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/27/2018
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/23/2018
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/23/2018
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/23/2018
BIS—ISSUEDSM MMS MANAGEMENT CO, LLC10/09/2024
BISSDISSUEDDNA PLUMBING CONTR. INC10/25/2023
BIS—ISSUEDSM MMS MANAGEMENT CO, LLC03/29/2023
BISSDISSUEDNEW YORK STANDARD MECH CO03/17/2023
BISOTISSUEDDEMARI SERVICES INC02/27/2020
BISOTISSUEDDEMARI SERVICES INC04/12/2019
BISOTISSUEDDEMARI SERVICES INC10/26/2018
BISOTISSUEDDEMARI INSTALLATIONS CORP06/06/2016
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM05/26/2016
BISOTISSUEDFARMS COMMUNICATIONS SVCE07/16/2013
BISOTISSUEDRB HEATING CONSULTING GRP01/06/2012
BISOTISSUEDARETE DEVELOPMENT INC07/06/2011
BISOTISSUEDALCATEL-LUCENT USA INC04/13/2010
BISOTISSUEDTOWER BLDG SERVICES,INC08/21/2009
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM08/13/2009
BISOTISSUEDSBA COMMUNICATION GROUP01/22/2008
BISFSISSUEDA.L. EASTMOND & SONS INC09/18/2007
BISOTISSUEDALL CLIMIATE MECHANICAL CORP06/07/2007
BISOTISSUEDEDISON PROPERTIES LLC GUARDIAN12/19/2006
BISEQISSUEDEDISON PROPERTIES LLC GUARDIAN12/19/2006
BISMHISSUEDEDISON PROPERITIES, LLC.05/08/2006
BISSPISSUEDV BARILE INC05/21/2003
BISPLISSUEDPARAMOUNT PLBG SER & ALT CO INC04/29/2003
+ 16 more permits on file
9 projects · most recent 11/25/2022
General Wiring
FiledStatusContractorScope
11/25/2022CompleteJ.A. LEE ELEC SVCS LLC—
10/13/2022CompleteJ.A. LEE ELEC SVCS LLCGeneral Wiring
10/12/2022CompleteJ.A. LEE ELEC SVCS LLCGeneral Wiring
10/03/2022CompleteJ.A. LEE ELEC SVCS LLC—
07/14/2022CompleteMEGA ELEC'L CONTR'G, INC—
08/21/2020CompleteALL-RITE ELECT CORP OF NYGeneral Wiring
10/03/2018CompleteMEGA ELEC'L CONTR'G, INC—
07/26/2018CompleteROBERT S. COVELLO—
07/26/2018CompleteROBERT S. COVELLO—
1 project · most recent 10/10/2018
Sidewalk Shed
FiledStatusContractorScope
10/10/2018Permit IssuedEMPIRE NY INSTALLATIONS ISidewalk Shed
1 project · most recent 04/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/11/2024Permit IssuedDEMARI SERVICES INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/28/2025MasonryAnthony Stasiospecial
04/28/2025Post-installed AnchorsAnthony Stasiospecial
04/28/2025FinalAnthony Stasioprogress
04/28/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
11/29/2023MasonryAnthony Stasiospecial
11/29/2023Post-installed AnchorsAnthony Stasiospecial
11/29/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
11/29/2023FinalAnthony Stasioprogress
09/05/2023Structural Cold-Formed SteelSAMI HAJJAR P.Especial
09/05/2023FinalERIC BERLENTprogress
09/05/2023Structural Steel - WeldingSAMI HAJJAR P.Especial
09/05/2023Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
09/05/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/05/2023Structural Steel - DetailsSAMI HAJJAR P.Especial
11/03/2021HVAC and service water heating system controls EUGENE BIFULCOenergy_progress
11/03/2021HVAC insulation and sealing EUGENE BIFULCOenergy_progress
11/03/2021Mechanical SystemsEUGENE BIFULCOspecial
11/03/2021FinalEUGENE BIFULCOprogress
11/03/2021Maintenance informationEUGENE BIFULCOenergy_progress
11/03/2021Shutoff dampersEUGENE BIFULCOenergy_progress
11/03/2021HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
11/01/2021Mechanical SystemsEUGENE BIFULCOspecial
11/01/2021HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
11/01/2021HVAC insulation and sealing EUGENE BIFULCOenergy_progress
11/01/2021Shutoff dampersEUGENE BIFULCOenergy_progress
Latest 25 of 37.
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch15
09/06/2026M00015241-I1Request digital key ↗
09/06/2026M00015259-I1Request digital key ↗
09/06/2026M00015252-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00279279-I1Request digital key ↗
08/15/2026M00279279-P2Request digital key ↗
08/15/2026M00279279-P1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION34
06/07/2023101435500Open ↗
06/06/2023101435500Open ↗
05/31/2023101435500Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION18
10/09/2024101435500Open ↗
09/12/2024101435500Open ↗
10/25/2023101435500Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/21/2023101435500Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/27/2019123552182Open ↗
03/27/2019123552182Open ↗
03/27/2019123552182Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/28/2026M00015259-I1Open ↗
09/02/2026M00875085-S1Open ↗
08/30/2026M00879514-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/06/2026M00015241-I1Open ↗
09/06/2026M00015252-I1Open ↗
09/06/2026M00015245-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M00875085-S1Open ↗
09/02/2026M00875085-S1Open ↗
09/02/2026M00875085-S1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/10/2012120938851Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/10/2012120938851Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2016140499191Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/24/2016140499191Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/24/2016140499191Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING4
02/14/2023101435500Open ↗
02/09/2023101435500Open ↗
02/08/2023101435500Open ↗
Showing 3 of 4 on file for this type
▸BIS* SPRINKLER TEST(HYDROSTATIC) 27-9672
10/26/2023101435500Open ↗
10/26/2023101435500Open ↗
▸BIS* STANDPIPE TEST 27-9512
10/26/2023101435500Open ↗
10/26/2023101435500Open ↗
▸BISEQUIPMENT USE PERMITS1
10/24/2022104418667Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
10/01/2018123552182Open ↗
06/13/2018123552182Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/06/2026M00015241-I1Open ↗
09/06/2026M00015252-I1Open ↗
09/06/2026M00015245-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
06/23/2011120729934Open ↗
08/27/2010120450831Open ↗
08/27/2010120450831Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/20/2018123552182Open ↗
06/07/2016122737306Open ↗
05/12/2016122737306Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00879514-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/13/2018123552182Open ↗
01/18/2018122737306Open ↗
05/12/2016122737306Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/19/2021123552182Open ↗
10/18/2021123552182Open ↗
01/18/2018122737306Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
04/03/2012120938851Open ↗
01/10/2012120938851Open ↗
01/10/2012120938851Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/24/2016140499191Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/11/2023101435500Open ↗
08/26/2022101426477Open ↗
08/26/2022104605884Open ↗
Showing 3 of 5 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19753
10/24/2022104418667Open ↗
08/30/2022101426477Open ↗
08/26/2022104605884Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
08/29/2022101631076Open ↗
08/29/2022101377421Open ↗
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
11/18/2022104418667Open ↗
08/31/2022101426477Open ↗
08/29/2022101631076Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
01/10/2012120938851Open ↗
06/23/2011120729934Open ↗
08/27/2010120450831Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/09/2024101435500Open ↗
05/24/2016140499191Open ↗
04/03/2012120938851Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
10/25/2023101435500Open ↗
03/29/2023101435500Open ↗
03/17/2023101435500Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/30/2023101435500Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
10/24/2022104418667Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00879514-I1Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT20
08/26/2022101377421Open ↗
08/26/2022101426477Open ↗
10/19/2021123552182Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/24/2022104418667Open ↗
08/26/2022104605884Open ↗
▸BISOK TO ISSUE TWO PENDING RESOLUTION OFFACADE VIOLATION - AFFIDAVIT ATTACHED1
12/05/2023101435500Open ↗
▸Filing & Intake Forms32
▸BISBOROUGH INTAKE FORM19
10/09/2024101435500Open ↗
10/04/2024101435500Open ↗
10/04/2024101435500Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET6
06/13/2018123552182Open ↗
05/12/2016122737306Open ↗
06/25/2013121689823Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
01/03/2020123552182Open ↗
03/27/2019123552182Open ↗
10/01/2018123552182Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/24/2016140499191Open ↗
▸Other Documents9
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7793
10/24/2022104418667Open ↗
08/30/2022101426477Open ↗
08/26/2022104605884Open ↗
▸BIS* VENT. SYS.-FIRE DAMPERS 27-343(D),7791
10/24/2022104418667Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/29/2018123552182Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
09/11/2023101435500Open ↗
▸BIS* FIRE STOPS 27-3451
09/11/2023101435500Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01028272-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01028272-I1Open ↗