| Owner | Filings | Most Recent |
|---|---|---|
| LE CAPITAL NYC | 5 | 09/01/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GEORGE CAMBOURAKIS | 2 | 08/25/2026 |
| FLORINELA MURESAN | 3 | 08/11/2026 |
| NIKOLA MARTINOVIC | 1 | 04/22/2026 |
| STUDIOSC ARCHITECTURE PLLC | 1 | 02/06/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| BMB BUILDING CONSULTING | 2 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Captiveaire CAS-HVAC1-E.402-15-7.5T-ERV 71,600 BTU · Erv ×1 Ventilation Greenheck BSD-160 3,250 CFM · Exhaust Fan ×1 BSQ-160 3,550 CFM · Exhaust Fan ×1 G-095-VG 300 CFM · Exhaust Fan ×1 SQ-98-VG 250 CFM · Exhaust Fan ×1 USF-12-B7 950 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Storm, Water/Sanitary |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/24/2026 | Subgrade Inspections | — | special |
| 08/24/2026 | Footing and Foundation | — | progress |
| 08/24/2026 | Concrete - Cast-In-Place | — | special |
| 08/24/2026 | Concrete - Cast-In-Place | — | special |
| 08/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/24/2026 | Final | — | progress |
| 08/24/2026 | Final | — | progress |
| 08/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/24/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 06/10/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/09/2026 | Interior lighting power | — | energy_progress |
| 06/09/2026 | Post-installed Anchors | — | special |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/09/2026 | Post-installed Anchors | — | special |
| 06/09/2026 | Energy Code Compliance Inspections | — | progress |
| 06/09/2026 | Shutoff dampers | — | energy_progress |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/09/2026 | Post-installed Anchors | — | special |
| 06/09/2026 | Maintenance information | — | energy_progress |
| 06/09/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/09/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/09/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/09/2026 | Lighting controls | — | energy_progress |
| 06/09/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/09/2026 | Electrical motors and elevators | — | energy_progress |