← Back
Office only, 2-6 stories
East New York SNAP Center/ MICSA
406 PINE STREET · BIN 3094690
💬 Discuss this project
1969Year Built
4Stories
O2Building Class
R7AZoning
60,180 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: 404 PINE REALTY LLC · 20,000 sf lot · 3.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof7p · 1 filing · 12 docs
Floor 436p · 3 filings · 20 docs
Floor 336p · 3 filings · 20 docs
Floor 237p · 3 filings · 20 docs
Floor 137p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
404 PINE STREET REALTY3209/13/2026
GREEN CAPITAL MANAGEMENT LLC903/22/2026
KAJ NY CONSTRUCTION INC503/22/2026
404 PINE REALTY LLC303/22/2026
ISIS PROPERTIES703/22/2026
EUCLID LTD PARTNERS LLC203/22/2026
BROOKLYN103/22/2026
MP 404 LLC903/21/2026
S R NAGER MANAGEMENT603/21/2026
404 PINE STREET LLC ATTN LINEAGE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
MUNICIPAL BUILDING CONSULTANTS1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.H 1 CONSTRUCTION CORPGeneral Contractor607/08/2026
TAB RESTORATIONS INCGeneral Contractor603/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing207/08/2026
DEPENDABLE MECHANICAL CORFire Protection207/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
BONOLO, ANGELOElectrical103/21/2026
ANGELO BONOLOElectrical103/21/2026
ABSALOM, NORRISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746707/31/2026
METHOD DESIGN ARCHITECTUR5713308/19/2025
STRUCTURAL ENGINEERING BU5883205/03/2022
Building Lifecycle
All (101)Filed (15)Permit Issued (11)Signed Off (3)Violation (60)Inspection (12)
08/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
B01211437-P2
06/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2026
Permit issued — Sprinklers
B01211437-I1-EW-SP
02/06/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
B01211437-P1
12/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Standpipe
B01328044-I1-EW-SD
12/04/2025
Filed — Alteration
INSTALL NEW HVAC VRF SYSTEM AND MODIFY EXISTING HVAC SYSTEM. INSTALL ASSOCIATED DUCTS & PIPING AS PER PLANS. INSTALLATION OF NEW COMMERCIAL TYPE I KITCHEN HOOD AND KITCHEN EXHAUST.
B01211459-P1
12/04/2025
Filed — Alteration
Standpipe application file to remove the Fire Hose Racks and install Fire Hose Cabinets on the 1st floor.
B01328044-I1
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/17/2025
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2025
Signed off — Alteration
INTERIOR DEMOLITION OF EXISTING CONSTRUCTIONS ON FLOORS 1-4 OF 404 PINE STREET, BROOKLYN, NY 11208
B01181730-I1
10/06/2025
Permit issued — Construction Fence
B01289815-I1-FN
09/27/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01289815-I1
09/27/2025
Filed — No Work
B01284110-I1
09/19/2025
Permit issued — Plumbing
B01211451-I1-PL
09/17/2025
Permit issued — Mechanical Systems
B01211459-I1-MS
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/19/2025
Filed — Alteration CO
ALT -CO APPLICATION FILED FOR CHANGE IN USE AND OCCUPANCY FOR FLOORS 1-4 FROM OFFICE (UG4) TO EDUCATION (UG IIIB).
B01181722-P1
08/15/2025
Permit issued — General Construction
B01181722-I1-GC
05/13/2025
Permit issued — Sprinklers
B01211437-I1-EW-SP
04/30/2025
Filed — Alteration
PLUMBING WORK AT 404 PINE STREET, SCOPE INCLUDE INSTALLATION OF NEW FIXTURES AND MODIFICATION
B01211451-I1
04/30/2025
Filed — Alteration
INSTALL NEW HVAC VRF SYSTEM AND MODIFY EXISTING HVAC SYSTEM. INSTALL ASSOCIATED DUCTS & PIPING AS PER PLANS. INSTALLATION OF NEW COMMERCIAL TYPE I KITCHEN HOOD AND KITCHEN EXHAUST.
B01211459-I1
04/30/2025
Permit issued — General Construction
B01181730-I1-GC
04/23/2025
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
B01211437-I1
04/14/2025
Filed — Alteration
INTERIOR DEMOLITION OF EXISTING CONSTRUCTIONS ON FLOORS 1-4 OF 404 PINE STREET, BROOKLYN, NY 11208
B01181730-I1
03/11/2025
Filed — Alteration CO
ALT -CO APPLICATION FILED FOR CHANGE IN USE AND OCCUPANCY FOR FLOORS 1-4 FROM OFFICE (UG4) TO EDUCATION (UG IIIB).
B01181722-I1
03/21/2024
Violation issued (FDNY_ORDER, closed)
02/05/2024
Violation issued (FDNY_ORDER, closed)
02/05/2024
Violation issued (FDNY_ORDER, closed)
02/05/2024
Violation issued (FDNY_ORDER, closed)
08/29/2023
Violation issued (ECB, closed)
Elevators
01/17/2023
Violation issued (ECB, closed)
Elevators
05/05/2022
Signed off — Alteration
LIMITED FACADE REPAIRS INCLUDING MASONRY REPOINTING, BRICK REPLACEMENT, SHELF ANGLE / LINTEL REPLACEMENT, CONCRETE PATCHING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00467925-I1
05/03/2022
Filed — Alteration
LIMITED FACADE REPAIRS INCLUDING MASONRY REPOINTING, BRICK REPLACEMENT, SHELF ANGLE / LINTEL REPLACEMENT, CONCRETE PATCHING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00467925-P1
11/08/2021
Signed off — Alteration
B00509044-I1
07/28/2021
Permit issued — General Construction
B00467925-I1-GC
05/02/2021
Permit issued — General Construction
B00467925-I1-GC
04/27/2021
Permit issued — Sidewalk Shed
B00509044-I1-SH
04/26/2021
Filed — Alteration
B00509044-I1
03/10/2021
Filed — Alteration
LIMITED FACADE REPAIRS INCLUDING MASONRY REPOINTING, BRICK REPLACEMENT, SHELF ANGLE / LINTEL REPLACEMENT, CONCRETE PATCHING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00467925-I1
10/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/26/2018
Violation issued (FDNY_ORDER, closed)
01/12/2018
Violation issued (FDNY_ORDER, closed)
10/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2017
Violation issued (FDNY_NOV, closed)
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2016
Violation issued (ECB, closed)
Construction
03/22/2016
Violation issued (ECB, closed)
Elevators
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR02/06/2026
DOB NOWStandpipeSigned-offA&H EXPRESS PLBG&HTG CORP12/12/2025
DOB NOWConstruction FencePermit IssuedI.H 1 CONSTRUCTION CORP10/06/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP09/19/2025
DOB NOWMechanical SystemsPermit IssuedI.H 1 CONSTRUCTION CORP09/17/2025
DOB NOWGeneral ConstructionPermit IssuedI.H 1 CONSTRUCTION CORP08/15/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR05/13/2025
DOB NOWGeneral ConstructionSigned-offI.H 1 CONSTRUCTION CORP04/30/2025
DOB NOWGeneral ConstructionSigned-offTAB RESTORATIONS INC07/28/2021
DOB NOWGeneral ConstructionSigned-offTAB RESTORATIONS INC05/02/2021
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/27/2021
BISOTISSUEDNYC HUMAN RESOURCES ADMIN09/27/2018
BISPLISSUEDBELL FUEL OIL, LLC11/10/2017
BISBLISSUEDBELL FUEL OIL, LLC11/10/2017
BISPLISSUEDPAULKA PLUMBING & HTG COR06/21/2017
BISOTISSUEDNYC HUMAN RESOURCES ADMIN10/31/2016
BISMHISSUEDMASTER MECHANICAL CORP10/28/2015
BISMHISSUEDMASTER MECHANICAL CORP10/21/2015
BISOTISSUEDNYC HUMAN RESOURCES ADMIN11/30/2009
BISMHISSUEDNYC HUMAN RESOURCES ADMIN11/30/2009
BISMHISSUEDBENI CONSTRUCTION02/20/2008
BISOTISSUEDNEW YORK CITY/HUMAN RESOUR ADMIN07/05/2000
BISPLISSUEDMETRO INCORPORATED04/28/2000
BISOTISSUEDULTIMATE CONST03/27/2000
1 job · most recent 12/04/2025
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Permit IssuedI.H 1 CONSTRUCTION CORPHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PLFY-EP06NEMU1 6,700 BTU · Vrf Indoor ×90
PLFY-EP15NEMU1 17,000 BTU · Vrf Indoor ×60
PLFY-EP12NEMU1 13,500 BTU · Vrf Indoor ×46
PLFY-EP18NEMU1 20,000 BTU · Vrf Indoor ×24
PURY-EP192TNU-A1 16 tons · Vrf Outdoor ×12
PLFY-EP08NEMU1 9,000 BTU · Vrf Indoor ×6
PUY-A12NKA7 1 tons · Condensing Unit ×4
Ventilation
Panasonic F-0510VS1 100 CFM · Exhaust Fan ×44
FV-0511VQ1 111 CFM · Exhaust Fan ×8
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×42
Captiveaire 6024 ND-2-PSP-F 1,800 CFM · Kitchen Exhaust ×4
USBI120DD-RM 3,600 CFM · Kitchen Exhaust ×2
Accurex XMSX-P112-H12-MF 3,100 CFM · Makeup Air ×2
Carnes BE24B 2,500 CFM · Exhaust Fan ×2
Refrigeration
Americooler BEL0060AS6AMAB0200 7,800 BTU · Refrigeration Unit ×2
BEL0100BSE6EEAB0200 9,900 BTU · Refrigeration Unit ×2
Bohn BCH0035LBACZA0000 11,185 BTU · Refrigeration Unit ×2
2 jobs · most recent 07/31/2026
FiledStatusContractorScope
07/31/2026Signed-offA&H EXPRESS PLBG&HTG CORP1,509 heads
12/04/2025——10 outlets
3 jobs · most recent 07/31/2026
Water/Sanitary
FiledStatusContractorScope
07/31/2026———
12/04/2025Signed-offDEPENDABLE MECH CORP—
04/30/2025Signed-offDEPENDABLE MECH CORPWater/Sanitary
2 jobs · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
04/22/2021Permit IssuedRICHARD NEU—
1 job · most recent 09/27/2025
Fence
FiledStatusContractorScope
09/27/2025Permit IssuedI.H 1 CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/06/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/21/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/31/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/31/2026Sprinkler SystemsStephen Shishkospecial
07/29/2026Sprinkler SystemsStephen Shishkospecial
07/29/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/05/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/05/2026Sprinkler SystemsStephen Shishkospecial
12/03/2025Standpipe SystemsStephen Shishkospecial
10/08/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/08/2025Shutoff dampersStephen Shishkoenergy_progress
10/08/2025Maintenance informationStephen Shishkoenergy_progress
10/08/2025Ventilation and air distribution systemStephen Shishkoenergy_progress
10/08/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
10/08/2025Mechanical SystemsStephen Shishkospecial
10/08/2025FinalStephen Shishkoprogress
10/08/2025Duct leakage testing, insulation and designStephen Shishkoenergy_progress
09/17/2025Fenestration and door U-factor and product ratingsStephen Shishkoenergy_progress
09/17/2025Fenestration areasStephen Shishkoenergy_progress
09/17/2025Lighting controlsStephen Shishkoenergy_progress
09/17/2025Fire-Resistant Penetrations and JointsDemetrios Comodromosspecial
09/17/2025Fire-Resistance Rated ConstructionDemetrios Comodromosprogress
09/17/2025Energy Code Compliance InspectionsDemetrios Comodromosprogress
09/17/2025MeteringStephen Shishkoenergy_progress
09/17/2025Fenestration air leakageStephen Shishkoenergy_progress
Latest 25 of 48.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
09/01/2026B00509044-I1Request digital key ↗
08/21/2026B01181730-I1Request digital key ↗
08/21/2026B01211437-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00467925-P1Request digital key ↗
09/01/2026B00467925-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026B01284110-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION12
06/11/2018340514759Open ↗
06/05/2018340514759Open ↗
11/29/2017321258580Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
09/27/2018340514759Open ↗
11/08/2017340560789Open ↗
11/08/2017340560789Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/17/2017340505518Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00467925-I1Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature19
09/12/2026B01181722-P1Open ↗
09/12/2026B01181722-P1Open ↗
09/12/2026B01181722-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00467925-I1Open ↗
09/01/2026B00467925-P1Open ↗
09/01/2026B00509044-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/01/2016321258580Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/28/2026B01211437-I1Open ↗
09/23/2026B01328044-I1Open ↗
09/12/2026B01181722-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
10/26/2015321259650Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/17/2016321259650Open ↗
10/26/2015321259650Open ↗
01/23/2008310071061Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/20/2017340514759Open ↗
▸BISPC FULL REPORT1
01/23/2008310071061Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/23/2008310071061Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING3
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
08/18/2009320056577Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/07/2016321259650Open ↗
03/07/2016321259650Open ↗
03/14/2008310071061Open ↗
▸BISEQUIPMENT USE PERMITS2
03/07/2016321259650Open ↗
03/14/2008310071061Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/08/2017340560789Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/07/2018321571483Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00467925-P1Open ↗
09/01/2026B00467925-I1Open ↗
08/21/2026B01211437-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026B01181730-I1Open ↗
08/13/2026B01181722-I1Open ↗
08/13/2026B01211451-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/09/2018340514759Open ↗
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/22/2026B01181722-I1Open ↗
08/21/2026B01211459-I1Open ↗
08/13/2026B01181730-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
06/07/2018340514759Open ↗
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/05/2021340514759Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/23/2008310071061Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/18/2009320056577Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/01/2016321258580Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/05/2021340514759Open ↗
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/05/2021340514759Open ↗
09/24/2018340514759Open ↗
11/08/2017340560789Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/08/2017340560789Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026B01211459-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00467925-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/05/2021340514759Open ↗
09/24/2018340514759Open ↗
04/09/2018340514759Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
03/07/2016321259650Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/05/2021340514759Open ↗
06/08/2018340560789Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/18/2009320056577Open ↗
01/23/2008310071061Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/08/2017340560789Open ↗
Showing 3 of 11 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
11/01/2016321258580Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/05/2021340514759Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET5
05/10/2017321571483Open ↗
10/06/2016321258580Open ↗
10/26/2015321259650Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
06/07/2018340514759Open ↗
04/09/2018340514759Open ↗
11/29/2017321258580Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/08/2017340560789Open ↗
07/20/2017340514759Open ↗
06/02/2017340505518Open ↗
▸BISBOROUGH INTAKE FORM3
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/29/2017321258580Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/13/2026B01181722-P1Open ↗
08/13/2026B01181722-I1Open ↗
▸DOB NOWAlternate Plan 11
08/20/2026B01284110-I1Open ↗
▸DOB NOWAlternate Plan 21
08/20/2026B01284110-I1Open ↗