← Back
Three families
406 STANHOPE STREET
BROOKLYN · Bushwick (West) · BIN 3074616
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
3,528 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · Owner of record: WAGAB 4 LLC · 2,067 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 2 filings · 18 docs
Floor 2Under Construction2p · 2 filings · 18 docs
Floor 1Under Construction6p · 1 filing · 13 docs
CellarUnder Construction6p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFE-SHIELD ENTERPRISES407/08/2026
WAGAB 4 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2022$995K—— → —$282/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC506/04/2026
ASHRAF CORP105/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HALF SQUARE803/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SBR CONTRACTING NY CORPGeneral Contractor707/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842406/04/2026
Building Lifecycle
All (32)Filed (6)Permit Issued (5)Signed Off (1)Violation (13)Special Inspection (7)
06/04/2026
Filed — Alteration
REPLACING PLUMBING FIXTURES WITH NEW FIXTURES AS PER PLAN
B08009747-P1
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
08/11/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00868149-I1
05/04/2023
Permit issued — General Construction
B00866689-I1-GC
05/02/2023
Permit issued — Sidewalk Shed
B00868149-I1-SH
05/01/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00868149-I1
04/30/2023
Filed — Alteration
BRICK PAINTING TO MATCH EXISTING AND WASH AT FRONT ELEVATION.NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00866689-I1
04/27/2023
Special inspection requirement — Final
KARTIK CHANDA
03/27/2023
Violation issued (HPD, closed)
A
12/27/2022
Permit issued — Plumbing
B08009747-S1-PL
12/21/2022
Filed — Alteration
REPLACING PLUMBING FIXTURES WITH NEW FIXTURES AS PER PLAN
B08009747-S1
12/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
12/09/2022
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
12/02/2022
Permit issued — General Construction
B08030587-I1-GC
11/01/2022
Permit issued — General Construction
B08009747-I1-GC
10/30/2022
Filed — Alteration
GENERAL CONSTRUCTION AT 2ND AND 3RD FLR. WORK WILL INCLUDE MINOR DEMOLITION NEW PARTITIONS AND FINISHES AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY
B08030587-I1
10/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
10/30/2022
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
09/25/2022
Filed — Alteration
REPLACING PLUMBING FIXTURES WITH NEW FIXTURES AS PER PLAN
B08009747-I1
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
09/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSBR CONTRACTING NY CORP05/04/2023
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN05/02/2023
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS12/27/2022
DOB NOWGeneral ConstructionPermit IssuedSBR CONTRACTING NY CORP12/02/2022
DOB NOWGeneral ConstructionPermit IssuedSBR CONTRACTING NY CORP11/01/2022
1 project · most recent 06/04/2026
Water/Sanitary
FiledStatusContractorScope
06/04/2026Permit IssuedDYNAMIC PLBG & SPRKLR CORWater/Sanitary
1 project · most recent 11/14/2022
General Wiring
FiledStatusContractorScope
11/14/2022Permit IssuedFOSTER ELEC'L SVC., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/27/2023FinalKARTIK CHANDAprogress
12/09/2022Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
12/09/2022Energy Code Compliance InspectionsKARTIK CHANDAprogress
10/30/2022Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
10/30/2022Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
09/25/2022Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
09/25/2022Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08030587-I1Request digital key ↗
08/27/2026B00866689-I1Request digital key ↗
08/27/2026B00868149-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00866689-I1Open ↗
08/16/2026B08009747-P1Open ↗
08/16/2026B08009747-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00866689-I1Open ↗
09/01/2026B08009747-I1Open ↗
08/28/2026B08009747-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B08009747-I1Open ↗
08/28/2026B08009747-S1Open ↗
08/24/2026B08030587-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026B08009747-I1Open ↗
08/16/2026B08009747-P1Open ↗
08/16/2026B08009747-S1Open ↗
Showing 3 of 4 on file for this type