← Back
Walk-up cooperative
406 WEST 46 STREET
MANHATTAN · Hell's Kitchen · BIN 1026459
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8Zoning
10,945 sfGross Floor Area
15Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · Owner of record: 406 WEST 46TH STREET CORP · 2,810 sf lot · 3.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralOther
Roof8p · 2 filings · 11 docs
Floor 54p · 1 filing · 8 docs
Floor 44p · 1 filing · 8 docs
Floor 34p · 1 filing · 8 docs
Floor 24p · 1 filing · 8 docs
Floor 14p · 1 filing · 8 docs
Cellar4p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK CONSTRUCTIONDBA SRT CONSTRUCTION807/08/2026
A & A RESTORATION INC.503/22/2026
406 WEST 46TH ST CORP403/22/2026
BK CONSTRUCTION SVCS103/22/2026
OWNER OF 406 WEST 46 S103/22/2026
A MICHAEL TYLER REALTY303/21/2026
KINSEY703/21/2026
C O A MICHAEL TYLER REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ST DESIGN & CONSULTING INC.101/23/2025
ASHRAF CORP301/02/2024
RAND ENGINEERING & ARCHITECTURE DPC108/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RENNON CONSTRUCTION103/21/2026
ABC PERMIT EXPEDITING203/21/2026
AK CONSULTING SERVICES203/21/2026
RAND ENGINEERING ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK CONSTRUCTION SVCS INCGeneral Contractor807/08/2026
LINEAL CONSTRUCTION & RESGeneral Contractor107/08/2026
SUPER STAR CONSTRUCTION IGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404101/23/2025
NEW YORK ENGINEERING ASSO851108/29/2023
RAND ENGINEERING & ARCHIT266108/29/2023
Building Lifecycle
All (67)Filed (6)Permit Issued (7)Signed Off (3)Violation (32)Inspection (1)Special Inspection (18)
08/06/2026
Signed off — Alteration
RENOVATION WORK ON EXIST 5TH FLOOR APT # 5B AS PER PLAN-WORK INCLUDES BUT NOT LIMITED TO REPLACE DOORS, DROP CEILING, FLOOR FINISH, PARTITION/EXTERIOR WALLS FINISH, PLUMBING/ELECTRICAL FIXTURES. APPLY COSMETIC PAINT AS REQUIRED. NO CHANGE IN USE, EGRESS.
M01159939-I1
03/26/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/14/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00946460-I1
02/21/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00946460-S1
02/18/2025
Permit issued — General Construction
M01159939-I1-GC
01/23/2025
Filed — Alteration
RENOVATION WORK ON EXIST 5TH FLOOR APT # 5B AS PER PLAN-WORK INCLUDES BUT NOT LIMITED TO REPLACE DOORS, DROP CEILING, FLOOR FINISH, PARTITION/EXTERIOR WALLS FINISH, PLUMBING/ELECTRICAL FIXTURES. APPLY COSMETIC PAINT AS REQUIRED. NO CHANGE IN USE, EGRESS.
M01159939-I1
01/22/2025
Permit issued — Supported Scaffold
M00946460-S1-SF
01/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
01/05/2025
Special inspection requirement — Insulation placement and R values
MD SHAMIM AKOND
01/05/2025
Special inspection requirement — Interior lighting power
MD SHAMIM AKOND
01/05/2025
Special inspection requirement — Maintenance information
MD SHAMIM AKOND
01/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
01/05/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
10/25/2024
Permit issued — Sidewalk Shed
M00946460-I1-SH
04/18/2024
Permit issued — General Construction
M00912615-I1-GC
04/09/2024
Permit issued — Suspended Scaffold
M01024875-I1-SC
03/24/2024
Filed — Alteration
M01024875-I1
01/08/2024
Violation issued (ECB, closed)
Construction
01/02/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00946460-P1
10/27/2023
Permit issued — Supported Scaffold
M00946460-S1-SF
10/26/2023
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00946460-S1
10/13/2023
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00946460-I1
10/13/2023
Permit issued — Sidewalk Shed
M00946460-I1-SH
10/10/2023
Violation issued (HPD, closed)
C
08/29/2023
Filed — Alteration
Facade repairs and Roof Replacement. Proposed roof related work does not include replacement of the entire existing roof deck or roof assembly. No change to use, egress, or occupancy.
M00912615-I1
08/23/2023
Special inspection requirement — Fenestration air leakage
Michael Larkin
08/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Larkin
08/23/2023
Special inspection requirement — Air barrier - visual inspection
Michael Larkin
08/23/2023
Special inspection requirement — Insulation placement and R values
Michael Larkin
08/23/2023
Special inspection requirement — Fenestration areas
Michael Larkin
08/01/2023
Special inspection requirement — Post-installed Anchors
John Monroe
08/01/2023
Special inspection requirement — Final
Michael Larkin
08/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Larkin
08/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/01/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
John Monroe
08/01/2023
Special inspection requirement — Masonry
John Monroe
08/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
01/25/2023
Violation issued (HPD, closed)
B
01/25/2023
Violation issued (HPD, closed)
B
01/18/2023
Violation issued (HPD, closed)
C
01/18/2023
Violation issued (HPD, closed)
C
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
03/21/2021
Violation issued (HPD, open)
C
03/21/2021
Violation issued (HPD, closed)
B
03/21/2021
Violation issued (HPD, closed)
A
03/21/2021
Violation issued (HPD, closed)
A
03/21/2021
Violation issued (HPD, closed)
C
03/21/2021
Violation issued (HPD, open)
C
10/02/2015
Violation issued (HPD, closed)
I
02/06/2015
Violation issued (ECB, closed)
Construction
02/06/2015
Violation issued (ECB, closed)
Unknown
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2009
Violation issued (HPD, closed)
A
06/17/2009
Violation issued (HPD, closed)
A
06/17/2009
Violation issued (HPD, closed)
A
01/04/2006
Violation issued (ECB, closed)
Construction
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2000
Violation issued (HPD, closed)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSUPER STAR CONSTRUCTION I02/18/2025
DOB NOWSupported ScaffoldSigned-offBK CONSTRUCTION SVCS INC01/22/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC10/25/2024
DOB NOWGeneral ConstructionPermit IssuedLINEAL CONSTRUCTION & RES04/18/2024
DOB NOWSuspended ScaffoldPermit IssuedLINEAL CONST & REST CORP04/09/2024
DOB NOWSupported ScaffoldSigned-offBK CONSTRUCTION SVCS INC10/27/2023
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC10/13/2023
BISOTISSUEDBLACK SQUARE BUILDERS CORP09/12/2016
BISOTISSUEDWOLF RESTORATION, INC.11/28/2005
BISEQISSUEDWOLF INSTALL11/03/2005
BISOTISSUEDATHERAS CONSTRUCTION CORP04/06/2001
BISOTISSUEDATHERAS CONST. CORP09/10/1999
BISOTISSUEDATHERAS CONST CORP03/08/1999
BISPLRE-ISSUEDELVERA SERVICES INC03/08/1999
BISBLISSUEDBAYSIDE FUEL OIL CORP12/14/1998
BISPLISSUEDTILOS PLMB 7 HTNG CORP11/20/1998
BISPLISSUEDTILOS PLMB 7 HTNG CORP06/04/1998
BISMHISSUEDG.PASTIS CONTRCTNG. CO04/29/1998
2 projects · most recent 03/07/2025
General Wiring
FiledStatusContractorScope
03/07/2025Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
10/16/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/26/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/05/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
01/05/2025Insulation placement and R valuesMD SHAMIM AKONDenergy_progress
01/05/2025Interior lighting powerMD SHAMIM AKONDenergy_progress
01/05/2025Maintenance informationMD SHAMIM AKONDenergy_progress
01/05/2025Fire-Resistance Rated ConstructionAKM RAHMANprogress
01/05/2025Energy Code Compliance InspectionsAKM RAHMANprogress
08/23/2023Fenestration air leakageMichael Larkinenergy_progress
08/23/2023Fenestration and door U-factor and product ratingsMichael Larkinenergy_progress
08/23/2023Air barrier - visual inspectionMichael Larkinenergy_progress
08/23/2023Insulation placement and R valuesMichael Larkinenergy_progress
08/23/2023Fenestration areasMichael Larkinenergy_progress
08/01/2023Post-installed AnchorsJohn Monroespecial
08/01/2023FinalMichael Larkinprogress
08/01/2023Energy Code Compliance InspectionsMichael Larkinprogress
08/01/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/01/2023Wall Panels, Curtain Walls, and VeneersJohn Monroespecial
08/01/2023MasonryJohn Monroespecial
08/01/2023Structural Stability – Alterations of existing buildingsJohn Monroespecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026M00912615-I1Request digital key ↗
08/29/2026M00946460-P1Request digital key ↗
08/29/2026M00946460-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/23/2025102563502Open ↗
08/19/2015122498984Open ↗
02/06/2008110087110Open ↗
▸BISWORK PERMIT APPLICATION1
09/20/2016122498984Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M01159939-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026M01159939-I1Open ↗
08/27/2026M01159939-I1Open ↗
08/27/2026M01159939-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026M00946460-S1Open ↗
08/29/2026M00946460-P1Open ↗
08/29/2026M00946460-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026M01159939-I1Open ↗
08/24/2026M00912615-I1Open ↗
08/24/2026M00912615-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/28/2016122498984Open ↗
08/19/2015122498984Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/06/2008110087110Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/06/2008110087110Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/06/2008110087110Open ↗
▸Safety & Tenant Protection7
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/13/2026M00912615-I1Open ↗
08/13/2026M00946460-S1Open ↗
08/13/2026M00946460-I1Open ↗
Showing 3 of 5 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
01/27/2016122498984Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M01159939-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/09/2016122498984Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/06/2008110087110Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M01159939-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2016122498984Open ↗
08/19/2015122498984Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/28/2016122498984Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
02/06/2008110087110Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
02/06/2008110087110Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/28/2016122498984Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00912615-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/28/2016122498984Open ↗
03/11/2016122498984Open ↗
08/19/2015122498984Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/19/2015122498984Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01024875-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01024875-I1Open ↗