← Back
BuildNYC
Two stories - detached, small or mid-size
406 WOODS OF ARDEN ROAD
STATEN ISLAND · BIN 5174679
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R1-2Zoning
3,056 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,657 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 6 docs
Floor 24p · 2 filings · 6 docs
Floor 115p · 2 filings · 6 docs
Basement1p · 1 filing · 6 docs
Sub-Basement1p · 2 filings · 6 docs
Site & exterior1p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riviera Plaza607/08/2026
Belair Ridge Development607/08/2026
SLCR Associates303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group309/15/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Design Plumbing & Heating ServicePlumbing207/08/2026
Duo Plumbing & HeatingPlumbing207/08/2026
Beyer ConstructionGeneral Contractor107/08/2026
Building Lifecycle
09/21/2022
Signed off — Alteration
18' TOTAL CURB CUT
S00422696-I1
09/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2022
Filed — Alteration
18' TOTAL CURB CUT
S00422696-P1
09/14/2022
Signed off — Alteration
18' TOTAL CURB CUT
S00422696-S1
09/13/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBeyer Construction08/15/2022
DOB NOWPlumbingSigned-offDuo Plumbing & Heating06/08/2022
DOB NOWPlumbingSigned-offDesign Plumbing & Heating Service08/19/2021
DOB NOWPlumbingSigned-offDesign Plumbing & Heating Service07/15/2021
DOB NOWPlumbingSigned-offDuo Plumbing & Heating07/07/2021
BIS—ISSUEDBeyer Construction05/25/2022
BIS—ISSUEDBeyer Construction04/27/2021
BIS—ISSUEDBeyer Construction11/04/2020
2 projects · most recent 09/28/2022
General Wiring
FiledStatusContractorScope
09/28/2022CompleteLaser Lite Elect'lGeneral Wiring
06/25/2021CompleteLaser Lite Elect'l—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2021Pass-Final PL - UndergroundPassView ↗
07/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account