← Back
Elevator cooperative
407 3 AVENUE
MANHATTAN · BIN 1019888
💬 Discuss this project
1964Year Built
20Stories
D4Building Class
C2-8Zoning
253,489 sfGross Floor Area
264Units
LL97 CoveredRent Stabilized33 Open Violations 32 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: CHESAPEAKE OWNERS CORP · 23,576 sf lot · 10.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof9p · 2 filings · 15 docs
Floor 203p · 1 filing · 8 docs
Floor 191p · 1 filing · 7 docs
Floor 18
Floor 17
Floor 16
Floor 151p · 1 filing · 3 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 92p · 1 filing · 5 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 42p · 2 filings · 7 docs
Floor 3
Floor 2
Floor 1
CellarUnder Construction1 filing
1 job · most recent 04/21/2021
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2021Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
25 jobs · most recent 07/10/2026
General Wiring Lighting
FiledStatusContractorScope
07/10/2026CompleteRJ ELECTRICAL CONTRACTORS—
06/09/2026Permit IssuedALTEC E & M, INC. ELEC'L—
05/27/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
11/26/2025CompleteSMART ELECTRIC SERVICES—
06/05/2025CompleteRAINBOW ELECTRIC CO., INC—
10/31/2024CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
05/23/2024CompleteULTIMATE SIGNS & ELEC COR—
02/06/2024CompleteEMPIRE LIC ELECL CONTRS—
08/08/2023CompleteT. DIRUSSO ELEC'L CONT IN—
03/01/2023Permit IssuedCITY GRID ELECTRIC CORPGeneral Wiring
01/03/2023Permit IssuedEMPIRE STATE ELECTL CORP—
08/31/2022CompleteALL CITY ELECTRICAL INCGeneral Wiring
Building Lifecycle
All (264)Filed (39)Permit Issued (39)Signed Off (27)Facade (FISP) (12)Violation (60)Inspection (17)Objection (40)Special Inspection (30)
04/27/2026
Signed off — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-S1
04/27/2026
Signed off — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-I1
04/22/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/20/2026
Violation issued (HPD, open)
C
04/16/2026
Permit issued — General Construction
M01350851-I1-GC
04/07/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-P2
04/07/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-P1
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
04/07/2026
Special inspection requirement — Interior lighting power
Kun Wu
04/07/2026
Special inspection requirement — Lighting controls
Kun Wu
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
04/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kun Wu
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kun Wu
04/07/2026
Special inspection requirement — Final
Kun Wu
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
04/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
04/07/2026
Special inspection requirement — Mechanical Systems
Kun Wu
03/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2026
Permit issued — Sign
M01354559-I1-SG
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/25/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED SIGNAGES FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01354559-I1
02/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2026
Filed — Alteration
M01350851-I1
02/02/2026
Special inspection requirement — Final
YUNHO LEE
01/23/2026
Permit issued — Plumbing
M01340733-S1-PL
01/20/2026
Permit issued — Mechanical Systems
M01340733-I1-MS
01/20/2026
Permit issued — Mechanical Systems
M01340733-I1-GC
12/31/2025
Filed — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-S1
12/31/2025
Filed — Alteration
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
M01340733-I1
11/19/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (T MOBILE)
M01196988-I1
06/25/2025
Permit issued — Sign
M01196988-I1-SG
06/18/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (T MOBILE)
M01196988-I1
04/25/2025
Violation issued (HPD, open)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, open)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, open)
C
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, open)
C
04/17/2025
Violation issued (HPD, closed)
C
Latest 60 of 264 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDBORO MANAGEMENT2407/08/2026
RUDD MANAGEMENT307/08/2026
FIRST SERVICE RESIDENTIAL1307/08/2026
HAMPTON MANAGEMENT1504/12/2026
8203 3RD AVE PROPERTY404/09/2026
FIRSTSERVICE RESIDENTIAL804/09/2026
PLATINUM SERVICES NY903/22/2026
CHESPEAKE OWNERS CORP10103/22/2026
HAP CONSTRUCTION103/22/2026
POFI CONSTRUTION CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2403/21/2026
THERESA VOLTAGGIO103/21/2026
PLATINUM SERVICES NY403/21/2026
KAZAM CONSULTANTS203/21/2026
C6103/21/2026
JENNY FLORES EXPEDITING103/21/2026
EAST COAST ENGINEERING P C403/21/2026
SCARANO ARCHITECT603/21/2026
JAM CONSULTANTS, INC.103/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECKO CONCEPT NY CORPGeneral Contractor1007/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing707/08/2026
PLATINUM GENERAL SERVICESGeneral Contractor603/21/2026
KIMBA INDUSTRIES INCGeneral Contractor603/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
A & I GENERAL CONTRACTORSGeneral Contractor303/21/2026
UPDATE SYSTEMS ELECTRICALElectrical203/22/2026
GREEN CITY BOX TRANS INCGeneral Contractor204/12/2026
FREEDOM GS INCGeneral Contractor203/21/2026
CRYSTAL COMFORT INCGeneral Contractor207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
RICHARD WEHNERElectrical203/21/2026
PREMIER SANITATION LLCGeneral Contractor107/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
PAUL SIGNSScaffold107/08/2026
ULTIMATE SIGNS DESIGNSScaffold107/08/2026
DORKIN, MARTINElectrical103/21/2026
UNIVERSAL SIGNS SVCScaffold107/08/2026
FIT FABRICATIONElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
WAYDE GILSTONElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QWA STUDIO9293404/07/2026
COWLEY ENGINEERING186102/13/2026
AG ENGINEERING PLLC8899102/13/2026
RAYMOND HO ARCHITECT, PLL1654111/25/2024
GLICKMAN SCHLESINGER ARCH6768105/06/2024
JOSEPH MARTINES PE, PLLC1428106/27/2023
CROSSCHECK INSPECTION SER544103/06/2023
GLOBAL ARCH DESIGN & BUIL3397112/09/2022
NEW AGE ENGINEERING PLLC7746107/25/2022
INTERNATIONAL GEOTEHCNICA1795202/18/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPNA CONTRACTING CORP04/16/2026
DOB NOWSignPermit IssuedMAD SIGNS INC03/02/2026
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC01/23/2026
DOB NOWMechanical SystemsSigned-offGREEN CITY BOX TRANS INC01/20/2026
DOB NOWMechanical SystemsSigned-offGREEN CITY BOX TRANS INC01/20/2026
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC06/25/2025
DOB NOWGeneral ConstructionPermit IssuedAPEX BUILDING SOLUTIONS01/17/2025
DOB NOWPlumbingPermit IssuedANTHONY DISABATO07/30/2024
DOB NOWGeneral ConstructionSigned-offJCK CONTRACTING CORP05/17/2024
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/28/2023
DOB NOWGeneral ConstructionSigned-offPLATINUM GENERAL SERVICES09/19/2023
DOB NOWGeneral ConstructionSigned-offPLATINUM GENERAL SERVICES06/29/2023
DOB NOWGeneral ConstructionSigned-offFREEDOM GS03/09/2023
DOB NOWGeneral ConstructionSigned-offPARADISE CONSTRUCTION GRO03/02/2023
DOB NOWGeneral ConstructionSigned-offA & I GENERAL CONTRACTORS11/17/2022
DOB NOWSignSigned-offPAUL SIGNS, INC09/20/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/22/2022
DOB NOWPlumbingPermit IssuedANTHONY DISABATO04/26/2022
DOB NOWPlumbingSigned-offJOE PARZIALE PLUMBING CO03/14/2022
DOB NOWGeneral ConstructionSigned-offKIMBA INDUSTRIES INC02/28/2022
DOB NOWMechanical SystemsSigned-offKIMBA INDUSTRIES INC02/28/2022
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY02/01/2022
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY02/01/2022
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN01/13/2022
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY01/13/2022
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC01/07/2022
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN11/12/2021
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY11/09/2021
DOB NOWGeneral ConstructionSigned-offPOFI CONSTRUCTION CORP11/03/2021
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN08/09/2021
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY08/05/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/22/2021
DOB NOWGeneral ConstructionSigned-offECKO CONCEPT NY05/07/2021
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN05/05/2021
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN08/06/2020
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN08/06/2020
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN08/06/2020
DOB NOWMechanical SystemsPermit IssuedCRYSTAL COMFORT02/06/2020
DOB NOWMechanical SystemsPermit IssuedCRYSTAL COMFORT10/29/2019
BISOTISSUEDTHOMAS MAINTENANCE INC05/14/2024
+ 49 more permits on file
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/22/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
04/07/2026Fire-Resistant Penetrations and JointsKun Wuspecial
04/07/2026Interior lighting powerKun Wuenergy_progress
04/07/2026Lighting controlsKun Wuenergy_progress
04/07/2026HVAC-R and service water piping design and insulationKun Wuenergy_progress
04/07/2026HVAC-R and service water heating equipmentKun Wuenergy_progress
04/07/2026HVAC-R and service water heating system controlsKun Wuenergy_progress
04/07/2026FinalKun Wuprogress
04/07/2026Energy Code Compliance InspectionsKun Wuprogress
04/07/2026Tenant Protection Plan ComplianceKun Wuspecial
04/07/2026Mechanical SystemsKun Wuspecial
02/02/2026FinalYUNHO LEEprogress
10/24/2024FinalPING MAN HOprogress
10/24/2024Fire-Resistant Penetrations and JointsPING MAN HOspecial
09/21/2023FinalJERE MURDOCHprogress
06/26/2023Tenant Protection Plan ComplianceJOSEPH MARTINESspecial
05/22/2023Interior lighting powerJOSEPH MARTINESenergy_progress
05/22/2023Lighting controlsJOSEPH MARTINESenergy_progress
05/22/2023Exterior lighting powerJOSEPH MARTINESenergy_progress
05/19/2023FinalJOSEPH MARTINESprogress
02/24/2023FinalLauren Schlesingerprogress
02/24/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/30/2022FinalNITHIN JOHNprogress
11/29/2022Tenant Protection Plan ComplianceNITHIN JOHNspecial
11/17/2022FinalAMR HAFEZprogress
11/15/2022Energy Code Compliance InspectionsNITHIN JOHNprogress
Latest 25 of 46.
▾Documents — 938 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch29
09/03/2026M00526805-I1Contact architect ↗
09/03/2026M00526824-I1Contact architect ↗
09/03/2026M00560186-I1Contact architect ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00332640-P3Contact architect ↗
09/03/2026M00418065-P1Contact architect ↗
09/03/2026M00473507-I1Contact architect ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00471406-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00228884-I1Contact architect ↗
▸Applications & Permits172
▸BISPLAN / WORK APPROVAL APPLICATION86
07/23/2024140972945Open ↗
05/14/2024123662152Open ↗
02/18/2022140972945Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION84
05/14/2024123662152Open ↗
02/04/2021140972945Open ↗
03/13/2020123837697Open ↗
Showing 3 of 84 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications252
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
02/28/2020123837704Open ↗
02/28/2020123837731Open ↗
02/28/2020123837697Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/05/2026M00332617-I1Open ↗
09/05/2026M00332640-I1Open ↗
09/05/2026M00332942-I1Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST34
05/09/2019123900519Open ↗
04/11/2019123731630Open ↗
03/22/2019123731630Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/28/2026M00798247-I1Open ↗
09/05/2026M00560186-I1Open ↗
09/02/2026M00643155-I1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
05/09/2019123900519Open ↗
03/22/2019123731630Open ↗
02/15/2019123681097Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00763749-I1Open ↗
09/01/2026M08040697-I1Open ↗
08/31/2026M01340733-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/02/2020140972945Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/02/2020140972945Open ↗
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/28/2019123778732Open ↗
05/09/2019123900519Open ↗
06/28/2018123328835Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPLUMBING (PL) SIGNOFF3
06/11/2021123837697Open ↗
02/01/2021123837704Open ↗
01/20/2021123837731Open ↗
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes15
02/28/2020123837731Open ↗
02/26/2020123837704Open ↗
02/26/2020123837697Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan7
08/15/2026M00332942-I1Open ↗
08/14/2026M00332617-I1Open ↗
08/14/2026M00332640-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
01/24/2019123662152Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/03/2026M00526824-I1Open ↗
09/03/2026M00560186-I1Open ↗
09/03/2026M00560186-P1Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
03/13/2020123837697Open ↗
03/13/2020123837731Open ↗
02/28/2020123837704Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00473507-I1Open ↗
09/03/2026M00593711-I1Open ↗
08/14/2026M00332617-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
02/28/2020123837731Open ↗
02/28/2020123837697Open ↗
05/03/2018123600834Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/03/2019123731630Open ↗
▸Energy Compliance67
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
02/28/2020123837704Open ↗
02/28/2020123837731Open ↗
02/28/2020123837697Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
02/01/2021123837704Open ↗
01/20/2021123837731Open ↗
10/07/2019123778732Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
09/03/2026M00593711-I1Open ↗
08/14/2026M00616608-I1Open ↗
08/13/2026M00616653-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/11/2021123837697Open ↗
02/01/2021123837704Open ↗
01/29/2021140972945Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/02/2020140972945Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY COST BUDGET WORKSHEET1
06/11/2021123837697Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/19/2022140972945Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/19/2022140972945Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/11/2021123837697Open ↗
02/01/2021123837704Open ↗
01/20/2021123837731Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/19/2022140972945Open ↗
▸BISHYDRO FLOW TEST LETTER1
06/29/2018123197600Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
07/18/2024140972945Open ↗
06/11/2021123837697Open ↗
02/01/2021123837704Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/25/2019123681097Open ↗
06/29/2018123197600Open ↗
Showing 2 of 10 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
07/19/2022140972945Open ↗
▸Cost, Insurance & Ownership82
▸BISCOST AFFIDAVIT79
06/11/2021123837697Open ↗
02/01/2021123837704Open ↗
01/20/2021123837731Open ↗
Showing 3 of 79 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
02/04/2021140972945Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/18/2024140972945Open ↗
▸Filing & Intake Forms87
▸BISEFILING COVER SHEET40
02/28/2020123837704Open ↗
02/28/2020123837731Open ↗
02/28/2020123837697Open ↗
Showing 3 of 40 on file for this type
▸BISBOROUGH INTAKE FORM22
10/07/2019123778732Open ↗
09/23/2019123662152Open ↗
09/04/2019123900519Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION18
03/21/2022140972945Open ↗
04/20/2021140972945Open ↗
01/07/2021140972945Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/02/2020140972945Open ↗
Showing 1 of 7 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document2
08/13/2026M00933008-I1Open ↗
08/13/2026M08040697-I1Open ↗