← Back
Primarily 3 family with 1 store or office
407 NOSTRAND AVENUE
BROOKLYN · BIN 3051899
💬 Discuss this project
1931Year Built
4Stories
S3Building Class
R6AZoning
4,800 sfGross Floor Area
4Units
Rent Stabilized27 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · 2,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 6 docs
Floor 14p · 2 filings · 20 docs
Cellar14p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRICAR REALTY607/08/2026
PAPA REALTY NY CORP503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP108/28/2022
EJZ ENGINEERING305/14/2022
BOLT ARCHITECTURE, PLLC211/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING403/21/2026
SUPERIOR FIRE CONTROL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DONE RIGHT KITCHEN EXHAUSGeneral Contractor303/21/2026
ENDRULAT, EDMUNDElectrical103/21/2026
RONALD STEWARTElectrical103/21/2026
STEWART RONALDElectrical103/21/2026
ROLAND COWARDGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
BUA, JAMESElectrical103/21/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975108/28/2022
EJZ ENGINEERING PLLC7852205/14/2022
BOLTARCHITECTURE,PLLC6712211/01/2021
Building Lifecycle
All (71)Filed (6)Permit Issued (4)Signed Off (1)Violation (30)Inspection (6)Special Inspection (24)
10/31/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edgar Zephyrine
07/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Edgar Zephyrine
07/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Edgar Zephyrine
07/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Edgar Zephyrine
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2023
Permit issued — Plumbing
B00491702-I1-PL
09/23/2022
Permit issued — Mechanical Systems
B00792712-I1-MS
08/28/2022
Filed — Alteration
B00792712-I1
08/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
08/23/2022
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
08/12/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
08/12/2022
Special inspection requirement — Mechanical Systems
Albert Munoz
05/14/2022
Filed — Alteration
B00491702-P2
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
01/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/11/2021
Signed off — Alteration
INTERIOR RENOVATIONS TO EXISTING STORE TO INSTALL NON-LOAD BEARING PARTITIONS; NEW FINISHES AND NEW PLUMBING FIXTURES FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR BULK AREA BEING PROPOSED BY THIS APPLICATION.
B00515022-I1
11/09/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/03/2021
Special inspection requirement — Final
Ibrahim Greenidge
11/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ibrahim Greenidge
11/03/2021
Special inspection requirement — Energy Code Compliance Inspections
Ibrahim Greenidge
11/03/2021
Special inspection requirement — Fire-Resistance Rated Construction
Ibrahim Greenidge
11/03/2021
Special inspection requirement — Interior lighting power
Ibrahim Greenidge
11/03/2021
Special inspection requirement — Lighting controls
Ibrahim Greenidge
11/01/2021
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING STORE TO INSTALL NON-LOAD BEARING PARTITIONS; NEW FINISHES AND NEW PLUMBING FIXTURES FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR BULK AREA BEING PROPOSED BY THIS APPLICATION.
B00515022-P1
10/27/2021
Special inspection requirement — Final
Ibrahim Greenidge
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Ibrahim Greenidge
10/27/2021
Special inspection requirement — Lighting controls
Ibrahim Greenidge
10/27/2021
Special inspection requirement — Interior lighting power
Ibrahim Greenidge
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ibrahim Greenidge
10/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
Ibrahim Greenidge
09/28/2021
Permit issued — Plumbing
B00491702-I1-PL
09/03/2021
Permit issued — General Construction
B00515022-I1-GC
08/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Edgar Zephyrine
08/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
Edgar Zephyrine
08/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
Edgar Zephyrine
06/09/2021
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING STORE TO INSTALL NON-LOAD BEARING PARTITIONS; NEW FINISHES AND NEW PLUMBING FIXTURES FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR BULK AREA BEING PROPOSED BY THIS APPLICATION.
B00515022-I1
04/12/2021
Violation issued (HPD, closed)
A
04/01/2021
Filed — Alteration
B00491702-P1
04/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2021
Filed — Alteration
B00491702-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
05/12/2010
Violation issued (HPD, open)
B
02/10/2010
Violation issued (HPD, open)
C
02/10/2010
Violation issued (HPD, open)
C
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC05/10/2023
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT KITCHEN EXHAUS09/23/2022
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING09/28/2021
DOB NOWGeneral ConstructionSigned-offROLAND COWARD09/03/2021
BIS—ISSUEDOWNER01/02/2009
BIS—ISSUEDRESIDENTIAL02/22/2007
1 project · most recent 02/02/2021
FiledStatusContractorScope
02/02/2021Permit IssuedRM ELECTRIC CO., INC.9 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/31/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/09/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/20/2023Fire-Resistant Penetrations and JointsEdgar Zephyrinespecial
07/20/2023HVAC-R and service water heating system controlsEdgar Zephyrineenergy_progress
07/20/2023HVAC-R and service water heating equipmentEdgar Zephyrineenergy_progress
07/20/2023HVAC-R and service water piping design and insulationEdgar Zephyrineenergy_progress
08/23/2022Fire-Resistant Penetrations and JointsAlbert Munozspecial
08/23/2022Duct leakage testing, insulation and designAKM HOQUEenergy_progress
08/12/2022FinalBRIAN MCCAFFREYprogress
08/12/2022Mechanical SystemsAlbert Munozspecial
11/03/2021FinalIbrahim Greenidgeprogress
11/03/2021Fire-Resistant Penetrations and JointsIbrahim Greenidgespecial
11/03/2021Energy Code Compliance InspectionsIbrahim Greenidgeprogress
11/03/2021Fire-Resistance Rated ConstructionIbrahim Greenidgeprogress
11/03/2021Interior lighting powerIbrahim Greenidgeenergy_progress
11/03/2021Lighting controlsIbrahim Greenidgeenergy_progress
10/27/2021FinalIbrahim Greenidgeprogress
10/27/2021Energy Code Compliance InspectionsIbrahim Greenidgeprogress
10/27/2021Lighting controlsIbrahim Greenidgeenergy_progress
10/27/2021Interior lighting powerIbrahim Greenidgeenergy_progress
10/27/2021Fire-Resistant Penetrations and JointsIbrahim Greenidgespecial
10/27/2021Fire-Resistance Rated ConstructionIbrahim Greenidgeprogress
08/06/2021HVAC-R and service water piping design and insulationEdgar Zephyrineenergy_progress
08/06/2021HVAC-R and service water heating system controlsEdgar Zephyrineenergy_progress
08/06/2021HVAC-R and service water heating equipmentEdgar Zephyrineenergy_progress
04/01/2021Fire-Resistant Penetrations and Joints—special
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00515022-I1Request digital key ↗
09/01/2026B00515022-P1Request digital key ↗
08/29/2026B00491702-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00515022-I1Open ↗
09/02/2026B00515022-I1Open ↗
09/02/2026B00515022-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00515022-I1Open ↗
09/01/2026B00515022-P1Open ↗
08/29/2026B00491702-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00515022-I1Open ↗
09/01/2026B00491702-I1Open ↗
08/26/2026B00792712-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00515022-P1Open ↗
09/01/2026B00515022-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00515022-I1Open ↗