1901Year Built
2Stories
B1Building Class
R6Zoning
3,000 sfGross Floor Area
2Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: 407 PENN LLC · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof42p · 1 filing · 20 docs
Floor 240p · 1 filing · 20 docs
Floor 142p · 1 filing · 20 docs
Basement42p · 1 filing · 20 docs
Site & exterior3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT1007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/25/2024$815K—Private party → 407 PENN LLC$272/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT205/21/2025
JRS CONSULTING402/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT INTERIOR INCGeneral Contractor307/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616605/21/2025
Building Lifecycle
All (112)Filed (6)Permit Issued (5)Signed Off (3)Violation (9)Inspection (11)Objection (48)Special Inspection (30)
06/11/2026
Violation issued (HPD, open)
B
05/05/2026
Violation issued (HPD, open)
A
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
A
09/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/04/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/04/2025
Special inspection requirement — Metering
FAHAD FATEH
08/04/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/04/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/04/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/04/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/04/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/16/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/10/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Structural
06/02/2025
Objection raised — Admin
06/02/2025
Objection raised — Energy
06/02/2025
Objection raised — Fire_Protection
05/21/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT EXISTING TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDING.
B01022639-P4
05/20/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/20/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/20/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/20/2025
Special inspection requirement — Metering
FAHAD FATEH
05/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/20/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/20/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/20/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/20/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/13/2025
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT EXISTING TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDING.
B01022639-S3
05/12/2025
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT EXISTING TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDING.
B01022639-S2
05/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2025
Permit issued — Sprinklers
B01022639-S3-EW-SP
04/01/2025
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT EXISTING TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDING.
B01022639-S1
03/26/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/25/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/20/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT EXISTING TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDING.
B01022639-P3
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/18/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBLETSAS P&H CORP04/24/2025
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP01/08/2025
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT INTERIOR INC12/09/2024
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC12/06/2024
DOB NOWMechanical SystemsSigned-offEXCELLENT INTERIOR INC12/04/2024
1 project · most recent 05/21/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/21/2025Signed-offDOUBLE SOLUTIONS INCStorm, Water/Sanitary
1 project · most recent 05/12/2025
General Wiring
FiledStatusContractorScope
05/12/2025CompleteD & W ELECTRICAL CONT CORGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/04/2025Interior lighting powerFAHAD FATEHenergy_progress
08/04/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/04/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/04/2025MeteringFAHAD FATEHenergy_progress
08/04/2025Permanent certificateFAHAD FATEHenergy_progress
08/04/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/04/2025Maintenance informationFAHAD FATEHenergy_progress
08/04/2025Fenestration areasFAHAD FATEHenergy_progress
08/04/2025Fenestration air leakageFAHAD FATEHenergy_progress
08/04/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/04/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/20/2025Maintenance informationFAHAD FATEHenergy_progress
05/20/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/20/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/20/2025Interior lighting powerFAHAD FATEHenergy_progress
05/20/2025Permanent certificateFAHAD FATEHenergy_progress
05/20/2025MeteringFAHAD FATEHenergy_progress
05/20/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/20/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/20/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/20/2025Fenestration areasFAHAD FATEHenergy_progress
05/20/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/18/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 34.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01022639-S2Request digital key ↗
08/25/2026B01022639-S3Request digital key ↗
08/25/2026B01022639-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026B01022639-P4Open ↗
08/25/2026B01022639-P4Open ↗
08/24/2026B01022639-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01022639-S2Open ↗
08/25/2026B01022639-S1Open ↗
08/25/2026B01022639-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01022639-S3Open ↗
08/25/2026B01022639-P4Open ↗
08/24/2026B01022639-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01022639-I1Open ↗
08/13/2026B01022639-P4Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B01022639-S3Open ↗
08/25/2026B01022639-S2Open ↗
08/25/2026B01022639-S1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/25/2026B01022639-I1Open ↗
08/25/2026B01022639-P4Open ↗