← Back
Elevator apt, semi-fireproof with stores
407 REMSEN AVENUE
BROOKLYN · BIN 3430362
💬 Discuss this project
2021Year Built
7Stories
D7Building Class
R6Zoning
47,286 sfGross Floor Area
56Units
LL97 Covered17 Open Violations 12 unresolved · 5 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: HKS REMSON AVE LLC · 10,040 sf lot · 4.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 3 filings · 20 docs
Floor 7Under Construction24p · 4 filings · 20 docs
Floor 6Under Construction24p · 4 filings · 20 docs
Floor 5Under Construction23p · 4 filings · 20 docs
Floor 4Under Construction24p · 5 filings · 20 docs
Floor 3Under Construction24p · 5 filings · 20 docs
Floor 2Under Construction24p · 5 filings · 20 docs
Floor 1Under Construction23p · 4 filings · 20 docs
CellarUnder Construction23p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLACK STEEL DEVELOPERS209/01/2026
HSK MANAGMENT INC907/08/2026
HIGHLINE DEVELOPERS NY404/09/2026
NEW AMERICAN CONSTRUCTION INC1004/09/2026
USA LLC ACE MAINTENANCE303/22/2026
375 ROCKAWAY REALTY CORP1403/22/2026
HOLLYWOOD CONS GROUP503/22/2026
HKS REMSON AVE LLC103/22/2026
PRECISION OWNERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2020$3.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BGM ENGNEERING308/14/2026
MJE PROFESSIONAL SERVICES212/12/2025
MCHENERY TESTING LAB112/05/2025
BGM ENGINEERING407/15/2022
JRS CONSULTING307/12/2021
STROH ENGINEERING SERVICES, P.C.107/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMERICAN CONSTRUCTION INCGeneral Contractor304/09/2026
PRECISION BUILD USA INCGeneral Contractor207/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
HSK MANAGEMENT INCGeneral Contractor204/09/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
ACE MAINTENANCE USA LLCGeneral Contractor104/09/2026
SUPERB CONSTRUCTION MGTGeneral Contractor104/09/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC15141008/14/2026
HRF SERVICES CORP5616105/11/2021
Building Lifecycle
All (138)Filed (14)Permit Issued (22)Signed Off (1)Violation (60)Inspection (11)Special Inspection (30)
08/17/2026
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
08/17/2026
Special inspection requirement — Footing and Foundation
JOSEPH BADINTER
08/17/2026
Special inspection requirement — Final
JOSEPH BADINTER
08/17/2026
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
08/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
08/17/2026
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
08/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RAUL VELASQUEZ MARTINEZ
08/17/2026
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
08/17/2026
Special inspection requirement — Underpinning
RAUL VELASQUEZ MARTINEZ
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
08/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
08/17/2026
Special inspection requirement — Masonry
FAHAD FATEH
08/14/2026
Filed — Alteration
APPLICATION FILED FOR STRUCTURAL AND FOUNDATION AS PER PLAN
B00516397-P4
08/12/2026
Special inspection requirement — Underpinning
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Masonry
08/12/2026
Special inspection requirement — Concrete - Cast-In-Place
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Structural Cold-Formed Steel
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Structural Steel - Details
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RAUL VELASQUEZ MARTINEZ
08/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/12/2026
Special inspection requirement — Structural Steel - Welding
08/12/2026
Special inspection requirement — Final
JOSEPH BADINTER
08/12/2026
Special inspection requirement — Footing and Foundation
JOSEPH BADINTER
08/04/2026
Filed — Alteration
APPLICATION FILED FOR STRUCTURAL AND FOUNDATION AS PER PLAN
B00516397-P3
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2026
Permit issued — General Construction
B00516397-I1-GC-CX
04/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Violation issued (ECB, closed)
Construction
04/13/2026
Violation issued (ECB, open)
Construction
04/13/2026
Violation issued (ECB, closed)
Unknown
02/25/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
12/31/2025
Inspection — No Access-Final PL - Underground
No Access
View inspection ↗
12/29/2025
Permit issued — Sprinklers
B00516471-I1-EW-SD
12/26/2025
Permit issued — Standpipe
B00516471-I1-EW-SP
12/26/2025
Permit issued — Plumbing
B00553506-I1-PL
12/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01327893-I1
12/12/2025
Permit issued — Protection and Mechanical Methods
B01327893-I1-PMM
12/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01327891-I1
12/05/2025
Filed — Alteration
B01327885-I1
12/05/2025
Permit issued — Supported Scaffold
B01327891-I1-SF
12/05/2025
Permit issued — Sidewalk Shed
B01327885-I1-SH
12/01/2025
Permit issued — Construction Fence
B00344879-I1-FN
11/28/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2025
Violation issued (ECB, open)
Construction
04/23/2025
Violation issued (ECB, closed)
Unknown
04/23/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Violation issued (ECB, closed)
Site Safety
04/23/2025
Violation issued (ECB, closed)
Site Safety
04/23/2025
Violation issued (ECB, closed)
Unknown
04/23/2025
Violation issued (ECB, closed)
Site Safety
03/19/2025
Violation issued (ECB, closed)
Construction
02/27/2025
Permit issued — Construction Fence
B00344879-I1-FN
01/07/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILD USA INC04/24/2026
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC12/29/2025
DOB NOWStandpipePermit IssuedTARGET PIPING NY LLC12/26/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC12/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedNEW AMERICAN CONSTRUCTION12/12/2025
DOB NOWSupported ScaffoldPermit IssuedNEW AMERICAN CONSTRUCTION12/05/2025
DOB NOWSidewalk ShedPermit IssuedNEW AMERICAN CONSTRUCTION12/05/2025
DOB NOWConstruction FencePermit IssuedPRECISION BUILD USA INC12/01/2025
DOB NOWConstruction FencePermit IssuedACE MAINTENANCE USA LLC02/27/2025
DOB NOWFoundationPermit IssuedACE MAINTENANCE USA LLC11/04/2024
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC10/11/2023
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC10/10/2023
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY09/15/2023
DOB NOWConstruction FencePermit IssuedHSK MANAGEMENT INC05/11/2023
DOB NOWStructuralPermit IssuedHSK MANAGEMENT INC04/10/2023
DOB NOWStructuralPermit IssuedHSK MANAGEMENT INC04/10/2023
DOB NOWMechanical SystemsPermit IssuedHSK MANAGEMENT INC07/01/2022
DOB NOWConstruction FencePermit IssuedHSK MANAGEMENT INC05/19/2022
DOB NOWConstruction FencePermit IssuedHSK MANAGEMENT INC06/30/2021
DOB NOWSupport of ExcavationSigned-offHSK MANAGEMENT INC06/02/2021
DOB NOWConstruction FencePermit IssuedSUPERB CONSTRUCTION MGT02/23/2021
DOB NOWConstruction FencePermit IssuedHIGHLINE DEVELOPERS NY IN07/29/2020
BIS—ISSUEDPRECISION BUILD USA INC03/18/2026
BIS—ISSUEDPRECISION BUILD USA INC11/20/2025
BIS—ISSUEDACE MAINTENANCE USA LLC08/26/2024
BIS—ISSUEDACE MAINTENANCE USA LLC08/08/2024
BIS—ISSUEDACE MAINTENANCE USA LLC07/29/2024
BIS—ISSUEDHOLLYWOOD CONS. GROUP INC11/06/2023
BIS—ISSUEDHSK MANAGEMENT INC08/26/2022
BIS—ISSUEDHSK MANAGEMENT INC11/04/2021
BIS—ISSUEDHSK MANAGEMENT INC10/15/2021
BIS—ISSUEDSUPERB CONSTRUCTION MGT02/05/2021
BISOTISSUEDSJ EMPIRE CORP12/06/2018
BISPLISSUEDPRECISION PLBG SVCS., INC08/16/2013
BISOTISSUEDBOUBACAR SOW08/09/2013
BISFPISSUEDIDEAL FIRE CONTROL03/07/1995
BISPLISSUEDMAINLAND PLUMBING AND HEATING10/24/1994
BIS—ISSUEDLOUISMA ENTERPRISE08/29/1994
3 projects · most recent 01/30/2026
General Wiring
FiledStatusContractorScope
01/30/2026Permit IssuedABZ ELECTRIC INC—
12/08/2025Permit IssuedRICHARD NEU—
12/01/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
2 projects · most recent 08/14/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/14/2026Permit IssuedPRECISION BUILD USA INCSteel, Concrete, Masonry
12/05/2025Permit IssuedNEW AMERICAN CONSTRUCTION1 scope_items
1 project · most recent 12/05/2025
Scaffold
FiledStatusContractorScope
12/05/2025Permit IssuedNEW AMERICAN CONSTRUCTIONScaffold
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2026Fail-Final Construction Permit WithdrawalFailView ↗
12/31/2025No Access-Final PL - UndergroundNo AccessView ↗
10/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final PL - UndergroundPassView ↗
12/15/2023Fail-Final PL - UndergroundFailView ↗
12/12/2023Fail-Final PL - UndergroundFailView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/17/2026Structural Cold-Formed SteelFAHAD FATEHspecial
08/17/2026Footing and FoundationJOSEPH BADINTERprogress
08/17/2026FinalJOSEPH BADINTERprogress
08/17/2026Structural Steel - WeldingFAHAD FATEHspecial
08/17/2026Structural Steel - High Strength BoltingFAHAD FATEHspecial
08/17/2026Structural Steel - DetailsFAHAD FATEHspecial
08/17/2026Subsurface Conditions – Fill Placement & In-Place DensityRAUL VELASQUEZ MARTINEZspecial
08/17/2026Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
08/17/2026UnderpinningRAUL VELASQUEZ MARTINEZspecial
08/17/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
08/17/2026Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
08/17/2026MasonryFAHAD FATEHspecial
08/12/2026UnderpinningRAUL VELASQUEZ MARTINEZspecial
08/12/2026Masonry—special
08/12/2026Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
08/12/2026Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
08/12/2026Structural Cold-Formed SteelRAUL VELASQUEZ MARTINEZspecial
08/12/2026Structural Steel - DetailsRAUL VELASQUEZ MARTINEZspecial
08/12/2026Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
08/12/2026Subsurface Conditions – Fill Placement & In-Place DensityRAUL VELASQUEZ MARTINEZspecial
08/12/2026Structural Steel - High Strength Bolting—special
08/12/2026Structural Steel - Welding—special
08/12/2026FinalJOSEPH BADINTERprogress
08/12/2026Footing and FoundationJOSEPH BADINTERprogress
07/15/2022Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
Latest 25 of 43.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/01/2026B00507972-I1Request digital key ↗
09/01/2026B00516471-I1Request digital key ↗
09/01/2026B00553506-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00344879-I1Request digital key ↗
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION20
11/20/2025322047352Open ↗
07/09/2025322047352Open ↗
08/27/2024322047352Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
02/27/2026322047352Open ↗
01/22/2024322047352Open ↗
07/19/2022340859903Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
10/05/2021322047352Open ↗
10/04/2021322047352Open ↗
05/04/2020322047352Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/19/2022340859903Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
01/23/2024322047352Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/28/2020322047352Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
09/02/2020322047352Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/28/2020322047352Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00507972-I1Open ↗
09/01/2026B00518988-P1Open ↗
09/01/2026B00518988-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00516397-I1Open ↗
09/02/2026B00516397-I1Open ↗
09/02/2026B00516397-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B00516397-I1Open ↗
08/28/2026B00553506-I1Open ↗
08/28/2026B00553506-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/27/2020322047352Open ↗
12/03/2018322026712Open ↗
07/15/2013320783274Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/03/2018322026712Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/19/2022340859903Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/03/2018322026712Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/19/2022340859903Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING1
07/15/2013320783274Open ↗
▸BISGAS CUT-OFF1
03/03/2021322083017Open ↗
▸BISELECTRIC CUT-OFF1
03/03/2021322083017Open ↗
▸BISSEWER CUT-OFF1
03/03/2021322083017Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
07/19/2022340859903Open ↗
08/26/2020322047352Open ↗
07/29/2020322047352Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
07/19/2022340859903Open ↗
▸BISTenant Protection Plan and Notes1
12/03/2018322026712Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/15/2013320783274Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/13/2021322047352Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/03/2021322083017Open ↗
12/03/2018322026712Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/19/2013320783274Open ↗
▸BISRODENT CONTROL1
03/03/2021322083017Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/15/2021322047352Open ↗
09/14/2021322047352Open ↗
09/13/2021322047352Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/27/2020322047352Open ↗
12/03/2018322026712Open ↗
07/15/2013320783274Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/19/2022340859903Open ↗
09/15/2021322047352Open ↗
09/14/2021322047352Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
12/22/2023322047352Open ↗
09/13/2021322047352Open ↗
▸BISSOIL REPORT1
08/26/2020322047352Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/26/2020322047352Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION13
07/09/2025322047352Open ↗
07/30/2024322047352Open ↗
03/26/2024322047352Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
01/22/2024322047352Open ↗
06/03/2021322047352Open ↗
08/31/2020322047352Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
11/01/2023322047352Open ↗
08/30/2022322047352Open ↗
▸BISLANDMARKS APPROVAL1
03/03/2021322083017Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/15/2013320783274Open ↗
▸Cost, Insurance & Ownership19
▸BISPROJECT-SPECIFIC GL INSURANCE8
11/20/2025322047352Open ↗
08/27/2024322047352Open ↗
07/30/2024322047352Open ↗
Showing 3 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)7
11/20/2025322047352Open ↗
07/09/2025322047352Open ↗
08/27/2024322047352Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT2
12/03/2018322026712Open ↗
07/15/2013320783274Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
07/09/2025322047352Open ↗
03/26/2024322047352Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET4
04/09/2020322083017Open ↗
03/27/2020322047352Open ↗
12/03/2018322026712Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
08/27/2024322047352Open ↗
07/30/2024322047352Open ↗
11/06/2023322047352Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
09/13/2021322047352Open ↗
07/22/2020322047352Open ↗
06/30/2020322047352Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/19/2022340859903Open ↗
▸BISSRO INTAKE FORM(SRO1)1
03/03/2021322083017Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/19/2022340859903Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
07/09/2025322047352Open ↗
08/27/2024322047352Open ↗
07/30/2024322047352Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM1
03/27/2020322047352Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/19/2022340859903Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/30/2020322047352Open ↗
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00518988-I1Open ↗