Condo, residential unit in 2-10 unit building
The 408 Third Street Condominium
408 3 STREET · BIN 3021080
💬 Discuss this project
1920Year Built
4Stories
R1Building Class
R6BZoning
6,530 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 408 THIRD ST., LLC · 2,258 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 11p · 4 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ECKSTROM NYC LLC1503/22/2026
SAFELINE GROUP INC.503/22/2026
BUILDERS CONSTRUCTION NYC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC110/04/2022
HPL ENGINEERING P.C.909/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS CONSTRUCTION NYCGeneral Contractor903/21/2026
H&Z BUILDING CONSULTING IGeneral Contractor407/08/2026
SAFELINE GROUP INCGeneral Contractor303/21/2026
FULL CIRCLE PLUMBING CORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613909/06/2022
Building Lifecycle
All (94)Filed (10)Permit Issued (9)Signed Off (5)Violation (13)Inspection (5)Objection (26)Special Inspection (26)
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/19/2022
Signed off — Alteration
B08015356-I1
11/09/2022
Violation issued (HPD, closed)
I
10/05/2022
Permit issued — Supported Scaffold
B08015356-I1-SF
10/04/2022
Filed — Alteration
B08015356-I1
09/21/2022
Signed off — Alteration
PROPOSED RENOVATION WORK ON OSP, CEL, 1st TO 4th FLOOR , ROOF & STAIR BULKHEAD, REPAIR FLOORING, CEILING AND PARTITION WORK, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00592918-I1
09/20/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/09/2022
Signed off — Alteration
PROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, 1st FLOOR TO 4th FLOOR, ROOF AND STAIR BULKHEAD. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00649401-I1
09/08/2022
Objection resolved — Addressed
09/07/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/07/2022
Objection raised — Scope
09/06/2022
Filed — Alteration
PROPOSED RENOVATION WORK ON OSP, CEL, 1st TO 4th FLOOR , ROOF & STAIR BULKHEAD, REPAIR FLOORING, CEILING AND PARTITION WORK, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00592918-P3
09/06/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
09/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
09/06/2022
Special inspection requirement — Fenestration areas
Fran Huang
09/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
09/06/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
09/06/2022
Special inspection requirement — Lighting controls
Fran Huang
09/06/2022
Special inspection requirement — Exterior lighting power
Fran Huang
09/06/2022
Special inspection requirement — Lighting in dwelling units
Fran Huang
08/25/2022
Permit issued — Plumbing
B00649401-I1-PL
08/25/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/23/2022
Objection resolved — Addressed
08/16/2022
Objection raised — Zoning
08/16/2022
Objection resolved — Addressed
08/15/2022
Signed off — Alteration
PROPOSED MECHANICAL WORK ON CEL, 1st TO 4th FLOOR, ROOF & STAIR BULKHEAD. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B00649327-I1
08/14/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON CEL, 1st TO 4th FLOOR, ROOF & STAIR BULKHEAD. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B00649327-P1
08/14/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, 1st FLOOR TO 4th FLOOR, ROOF AND STAIR BULKHEAD. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00649401-P1
08/09/2022
Signed off — Alteration
B00656356-I1
08/08/2022
Objection raised — Scope
08/04/2022
Filed — Alteration
PROPOSED RENOVATION WORK ON OSP, CEL, 1st TO 4th FLOOR , ROOF & STAIR BULKHEAD, REPAIR FLOORING, CEILING AND PARTITION WORK, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00592918-P2
08/04/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
08/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
08/04/2022
Special inspection requirement — Fenestration areas
Fran Huang
08/04/2022
Special inspection requirement — Exterior lighting power
Fran Huang
07/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/27/2022
Special inspection requirement — Lighting in dwelling units
Fran Huang
07/27/2022
Special inspection requirement — Lighting controls
Fran Huang
07/13/2022
Violation issued (ECB, closed)
Construction
04/25/2022
Permit issued — Mechanical Systems
B00649327-I1-MS
04/22/2022
Permit issued — Structural
B00656356-I1-ST
04/22/2022
Permit issued — General Construction
B00592918-I1-GC
03/23/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/18/2022
Violation issued (HPD, closed)
A
02/03/2022
Permit issued — Structural
B00656356-I1-ST
01/21/2022
Filed — Alteration
B00656356-I1
01/19/2022
Permit issued — Mechanical Systems
B00649327-I1-MS
01/06/2022
Permit issued — Plumbing
B00649401-I1-PL
12/30/2021
Filed — Alteration
PROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, 1st FLOOR TO 4th FLOOR, ROOF AND STAIR BULKHEAD. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00649401-I1
12/30/2021
Filed — Alteration
PROPOSED MECHANICAL WORK ON CEL, 1st TO 4th FLOOR, ROOF & STAIR BULKHEAD. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B00649327-I1
12/27/2021
Filed — Alteration
PROPOSED RENOVATION WORK ON OSP, CEL, 1st TO 4th FLOOR , ROOF & STAIR BULKHEAD, REPAIR FLOORING, CEILING AND PARTITION WORK, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00592918-P1
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSAFELINE GROUP INC10/05/2022
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP08/25/2022
DOB NOWMechanical SystemsSigned-offBUILDERS CONSTRUCTION NYC04/25/2022
DOB NOWStructuralSigned-offBUILDERS CONSTRUCTION NYC04/22/2022
DOB NOWGeneral ConstructionSigned-offBUILDERS CONSTRUCTION NYC04/22/2022
DOB NOWStructuralSigned-offH&Z BUILDING CONSULTING I02/03/2022
DOB NOWMechanical SystemsSigned-offH&Z BUILDING CONSULTING I01/19/2022
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP01/06/2022
DOB NOWGeneral ConstructionSigned-offH&Z BUILDING CONSULTING I12/10/2021
1 project · most recent 09/06/2022
General Wiring
FiledStatusContractorScope
09/06/2022CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/20/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/07/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/25/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/23/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/06/2022Fire-Resistant Penetrations and JointsFran Huangspecial
09/06/2022Structural Stability – Alterations of existing buildingsFran Huangspecial
09/06/2022Energy Code Compliance InspectionsFran Huangprogress
09/06/2022Fire-Resistance Rated ConstructionFran Huangprogress
09/06/2022Fenestration areasFran Huangenergy_progress
09/06/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
09/06/2022Fenestration air leakageFran Huangenergy_progress
09/06/2022Lighting controlsFran Huangenergy_progress
09/06/2022Exterior lighting powerFran Huangenergy_progress
09/06/2022Lighting in dwelling unitsFran Huangenergy_progress
08/04/2022Fenestration air leakageFran Huangenergy_progress
08/04/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
08/04/2022Fenestration areasFran Huangenergy_progress
08/04/2022Exterior lighting powerFran Huangenergy_progress
07/27/2022Fire-Resistance Rated ConstructionFran Huangprogress
07/27/2022Fire-Resistant Penetrations and JointsFran Huangspecial
07/27/2022Structural Stability – Alterations of existing buildingsFran Huangspecial
07/27/2022Energy Code Compliance InspectionsFran Huangprogress
07/27/2022Lighting in dwelling unitsFran Huangenergy_progress
07/27/2022Lighting controlsFran Huangenergy_progress
12/15/2021Fire-Resistant Penetrations and JointsFran Huangspecial
12/15/2021Structural Stability – Alterations of existing buildingsFran Huangspecial
12/15/2021Energy Code Compliance InspectionsFran Huangprogress
12/15/2021Fire-Resistance Rated ConstructionFran Huangprogress
12/15/2021Lighting in dwelling unitsFran Huangenergy_progress
Latest 25 of 26.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00592918-P1Request digital key ↗
08/31/2026B00649401-I1Request digital key ↗
08/31/2026B00649401-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/13/2022322110899Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/14/2022322110899Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B00592918-P2Open ↗
09/01/2026B00592918-P2Open ↗
09/01/2026B00592918-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00649401-I1Open ↗
08/31/2026B00649401-P1Open ↗
08/31/2026B00649327-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00592918-P2Open ↗
09/01/2026B00592918-P2Open ↗
08/31/2026B00592918-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026B00649401-I1Open ↗
08/31/2026B00649401-P1Open ↗
08/31/2026B00649327-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00649401-I1Open ↗
08/13/2026B00649327-I1Open ↗
08/13/2026B00592918-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/13/2022322110899Open ↗
▸Other Documents1
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/14/2022322110899Open ↗