← Back
Miscellaneous two family
408 CLERMONT AVENUE
BROOKLYN · BIN 3055888
💬 Discuss this project
1855Year Built
3Stories
B9Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous two family · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
Floor 33p · 1 filing · 12 docs
Floor 2
Floor 1
Basement3p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOLT ARCHITECTURE101/29/2025
Building Lifecycle
All (67)Filed (1)Violation (4)Objection (42)Special Inspection (20)
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Resolved
11/12/2025
Special inspection requirement — Concrete - Cast-In-Place
11/12/2025
Special inspection requirement — Metering
Ibrahim Greenidge
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Objection resolved — Resolved
10/22/2025
Special inspection requirement — Preliminary
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Zoning
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Zoning
10/15/2025
Objection raised — Zoning
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Zoning
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Energy
10/15/2025
Objection raised — Fire_Protection
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Structural
10/15/2025
Objection raised — Inspections
10/15/2025
Objection raised — Scope
09/18/2025
Objection resolved — Resolved
08/20/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Scope
07/07/2025
Objection raised — Admin
07/07/2025
Objection raised — Cost
07/07/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Scope
02/05/2025
Objection raised — Scope
01/29/2025
Filed — Alteration CO
Interior renovation and conversion from (2) family dwelling to (1) family dwelling, proposed two-story rear yard addition.
B00883075-I1
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/31/2023
Special inspection requirement — Final
05/31/2023
Special inspection requirement — Footing and Foundation
05/31/2023
Special inspection requirement — Interior lighting power
05/31/2023
Special inspection requirement — Air barrier — testing
05/31/2023
Special inspection requirement — Fenestration areas
05/31/2023
Special inspection requirement — Fenestration air leakage
05/31/2023
Special inspection requirement — Air barrier - visual inspection
05/31/2023
Special inspection requirement — Insulation placement and R values
05/31/2023
Special inspection requirement — Maintenance information
05/31/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
05/31/2023
Special inspection requirement — Permanent certificate
05/31/2023
Special inspection requirement — Masonry
Latest 60 of 67 events.
Nothing on file for this building.
1 project · most recent 01/29/2025
Steel Concrete Masonry
FiledStatusContractorScope
01/29/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
11/12/2025Concrete - Cast-In-Place—special
11/12/2025MeteringIbrahim Greenidgeenergy_progress
10/22/2025Preliminary—progress
05/31/2023Fire-Resistant Penetrations and Joints—special
05/31/2023Structural Stability – Alterations of existing buildings—special
05/31/2023Final—progress
05/31/2023Footing and Foundation—progress
05/31/2023Interior lighting power—energy_progress
05/31/2023Air barrier — testing —energy_progress
05/31/2023Fenestration areas—energy_progress
05/31/2023Fenestration air leakage—energy_progress
05/31/2023Air barrier - visual inspection—energy_progress
05/31/2023Insulation placement and R values—energy_progress
05/31/2023Maintenance information—energy_progress
05/31/2023Fenestration and door U-factor and product ratings—energy_progress
05/31/2023Permanent certificate—energy_progress
05/31/2023Masonry—special
05/31/2023Protection of exposed foundation insulation—energy_progress
05/31/2023Structural Cold-Formed Steel—special
05/31/2023Structural Steel - Details—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B00883075-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026B00883075-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00883075-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/13/2026B00883075-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026B00883075-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00883075-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026B00883075-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00883075-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00883075-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00883075-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00883075-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00883075-I1Open ↗