DOB03/04/2025FAILURE TO COMPLY W/COMMISSIONER'S ORDER. AT TIME OF INSPECTION OBSERV ED PROPERTY OWNER HAS FAILED TO COMPLY W/PREVIOUSLY ISSUED DOB COMMISS IONER'S ORDER & THE UNSTABLE ROCK OUTCROPPING POSES SIGNIFICANT RISK T O PUBLIC. IMMEDIATELY COMMENCE THE ROCK STABILIZATION AS PER THE MRCE CONSULTING ENGINEER DRAWINGS UNDER FULLTIME SUPERVISION BY 3/17/25
DOB08/23/2024EMERGENCY WORK/STABILIZATION.NOTED AT THE TIME OF INSPECTION,WE NTOED UNSTABLE PORTIONS OF ROCK OUTCROPPING AND WALL ADJOINING THE SIDEWALK THE UNSTABLE PORTIONS OF THE ROCK OUTCROPPING COULD COLLAPSE AT ANY TI ME AND REQUIRE REMOVAL OR STABILIZATION.REMEDY:RETAIN A LIC GEOTECHNIC AL ENGINEER TO DEMOLISH/STABILIZE THE OUTCROPPING.PROVIDE REPORT
DOB07/12/2024REQUEST ADDITIONAL INFORMATION NOTED RESPONDENT IS REQUESTED TO PROVIDE A SIGNED & SEALED LETTER, ALONG WITH DETAILED CALCULATIONS DRAWINGS, CONSTRUCTION DETAILS, SOIL TYPES ETC. IDENTIFYING THE FACTUAL BASIS. REMEDY, METHODOLOGY AND SUPPORTING DATA PROVIDE THE REQUESTED INFORMATION NO LATER THAN AUGUST 12, 2024
DOB05/08/2023OBSERVED THIRTY FEET HIGH NATURAL OUTCROP FORMATION WITH FOUR FEET HIGH DRY-STACKED STONE RETAINING WALL AT AT THE BOTTOM AT EXPOSURES#1 AND 2 WITH LOOSE BOULDERS AND STONE PIECES ON THE SIDEWALK. THE WALL IS BULGING AT SEVERAL LOCATIONS WITH MISSING PIECES AT EXPOSURE#2. LOOSE ROCKS AND BOULDERS HAVE THE POTENTIAL FOR FURTHER DISPLACEMENT.
Two stories - detached, small or mid-size · 7,545 sf lot · 0.34 FAR built · Flood zone X