← Back
Elevator apt, semi-fireproof with stores
Melrose Supportive Housing
407 EAST 158 STREET · Melrose · BIN 2001464
💬 Discuss this project
2024Year Built
10Stories
D7Building Class
R8Zoning
35,160 sfGross Floor Area
46Units
0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: JERICHO 158TH STREET HOUSING DEVELOPMENT FUND CORP · 5,092 sf lot · 6.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings
Floor 11 filing
Site & exteriorUnder Construction4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AZIMUTH DEVELOPMENT GROUP LLC11709/22/2026
KAJ NY CONSTRUCTION607/08/2026
PROCIDA CONSTRUCTION407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3603/21/2026
A1 EXPEDITING SERVICE603/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
UNITED SAFETY CONSULTANTS603/21/2026
TSC103/21/2026
S R SOLAR DESIGN203/21/2026
HS DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROCIDA CONSTRUCTION CORP.General Contractor2907/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor1507/08/2026
MILLER PLUMBING & HTG INCFire Protection907/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor407/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing207/08/2026
TOTAL ELECTRIC SOLUTIONSElectrical103/22/2026
SEA BRIGHT SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68642109/01/2026
NKM ENGINEERING PLLC6244208/04/2026
GEORGE J. XERAKIAS, PE1658107/07/2025
Building Lifecycle
All (229)Filed (36)Permit Issued (47)Signed Off (16)Violation (6)Inspection (15)Objection (79)Special Inspection (30)
09/18/2026
Objection raised — Other
09/01/2026
Filed — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-A7
08/12/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S3
08/11/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S1
08/11/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S2
08/04/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01364514-P1
08/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/04/2026
Special inspection requirement — Final
NARESH MAHANGU
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
JUAN GOMEZ
08/03/2026
Special inspection requirement — Final
JUAN GOMEZ
08/03/2026
Special inspection requirement — Lighting controls
JUAN GOMEZ
08/03/2026
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
08/03/2026
Special inspection requirement — Metering
JUAN GOMEZ
08/03/2026
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
08/03/2026
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
08/03/2026
Special inspection requirement — Interior lighting power
JUAN GOMEZ
08/03/2026
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/03/2026
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
08/03/2026
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
07/31/2026
Objection resolved — Addressed
07/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
07/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
07/07/2026
Special inspection requirement — Fenestration areas
JUAN GOMEZ
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
07/07/2026
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
07/07/2026
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
07/07/2026
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
07/07/2026
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
06/29/2026
Signed off — Alteration
X00876013-I1
06/24/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S5
06/24/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S8
06/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/22/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S4
06/18/2026
Signed off — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-S9
06/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2026
Signed off — Alteration
Installation of 8'H plywood fence
X00893711-I1
06/09/2026
Permit issued — Solar
X01364514-I1-SL
06/04/2026
Objection raised — Other
06/01/2026
Filed — New Building
Propose Mechanical Scope of Work filed in conjunction with NB # X08055450-I1.
X08055450-A1
05/12/2026
Permit issued — General Construction
X08055450-I1-GC
05/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE ATTACHED TO THE OUTER SIDEWALK SHED BRIDGE WILL BE SOLID PLYWOOD AND WIRE MESH.
X01143831-S2
05/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE ATTACHED TO THE OUTER SIDEWALK SHED BRIDGE WILL BE SOLID PLYWOOD AND WIRE MESH.
X01143831-I1
05/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE ATTACHED TO THE OUTER SIDEWALK SHED BRIDGE WILL BE SOLID PLYWOOD AND WIRE MESH.
X01143831-S3
05/04/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
05/04/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
05/04/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/01/2026
Signed off — Alteration
X01245934-I1
04/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE ATTACHED TO THE OUTER SIDEWALK SHED BRIDGE WILL BE SOLID PLYWOOD AND WIRE MESH.
X01143831-S1
04/10/2026
Objection resolved — Resolved
Latest 60 of 229 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSEA BRIGHT SOLAR LLC06/09/2026
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.05/12/2026
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC04/08/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.02/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/10/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/10/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP10/07/2025
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.09/05/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC09/02/2025
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC09/02/2025
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC09/02/2025
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC08/28/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC08/28/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC08/28/2025
DOB NOWSuspended ScaffoldSigned-offELM SUSPENSION SYSTEMS07/11/2025
DOB NOWStructuralSigned-offPROCIDA CONSTRUCTION CORP.06/09/2025
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.04/29/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC04/08/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC03/21/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC03/21/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC03/21/2025
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.02/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC02/07/2025
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.01/10/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/19/2024
DOB NOWFoundationSigned-offPROCIDA CONSTRUCTION CORP.10/24/2024
DOB NOWSupport of ExcavationSigned-offPROCIDA CONSTRUCTION CORP.10/23/2024
DOB NOWFoundationSigned-offPROCIDA CONSTRUCTION CORP.10/23/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP10/18/2024
DOB NOWMechanical SystemsSigned-offPROCIDA CONSTRUCTION CORP.09/20/2024
DOB NOWStructuralSigned-offPROCIDA CONSTRUCTION CORP.06/18/2024
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.05/30/2024
DOB NOWStructuralSigned-offPROCIDA CONSTRUCTION CORP.03/19/2024
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.03/01/2024
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.12/11/2023
+ 8 more permits on file
1 project · most recent 09/01/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/01/2026Permit IssuedPROCIDA CONSTRUCTION CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg LAU150HYV3 24,000 BTU · Vrf Outdoor ×37
ARUN024GSS4 24,000 BTU · Vrf Outdoor ×9
ARUMO723BTE5 72,000 BTU · Vrf Outdoor ×1
LUU240HHV 24,000 BTU · Condensing Unit ×1
Daikin RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×92
REYQ72XATJA 72,000 BTU · Vrf Outdoor ×2
RZQ24TAVJU 24,000 BTU · Condensing Unit ×2
Heating
Lg LAU150HYV3 27,000 BTU · Vrf Outdoor ×37
ARUN024GSS4 27,000 BTU · Vrf Outdoor ×8
ARUMO723BTE5 81,000 BTU · Vrf Outdoor ×1
LUU240HHV 27,000 BTU · Condensing Unit ×1
__Junk__ ARUN024GSS4 27,000 BTU · Vrf Outdoor ×1
Daikin RXSQ24TAVJU 27,000 BTU · Vrf Outdoor ×92
REYQ144TTJU 162,000 BTU · Vrf Outdoor ×2
Ventilation
Loren Cook 41AI-2004-25 3,000 CFM · Exhaust Fan ×4
135C17DOR92VF 900 CFM · Exhaust Fan ×2
Daikin DPS016A 6,000 CFM · Erv ×2
1 project · most recent 09/01/2026
Sprinkler System
FiledStatusContractorScope
09/01/2026Signed-offMILLER PLUMBING & HTG INCSprinkler System
1 project · most recent 09/01/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/01/2026Signed-offD.D.S. MECH PBG&HTG CORPStorm, Water/Sanitary
7 projects · most recent 03/09/2026
General Wiring
FiledStatusContractorScope
03/09/2026Permit IssuedAMBER ELECTL CONTNG INC—
08/26/2025CompleteTOTAL ELECTRIC SOLUTIONSGeneral Wiring
03/20/2025CompleteAMR ELEC'L CONTRG CORP1 meters, 1 new_meters
02/05/2025CompleteAMR ELEC'L CONTRG CORP—
11/21/2024CompleteTOP SHELF ELECTRIC CORP—
10/21/2024Permit IssuedAMR ELEC'L CONTRG CORPGeneral Wiring
11/08/2018CompleteRICHARD NEU—
2 projects · most recent 09/01/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/01/2026Permit IssuedPROCIDA CONSTRUCTION CORPSteel, Concrete, Masonry
08/04/2026Permit IssuedSEA BRIGHT SOLAR LLC1 scope_items
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedSEA BRIGHT SOLAR LLC24 panels, 15.36 kw, 2,613.95 roof_area_sqft
2 projects · most recent 04/08/2025
Fence
FiledStatusContractorScope
04/08/2025Signed-offSPRING SCAFFOLDING LLCFence
06/22/2023Signed-offPROCIDA CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/04/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/04/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/03/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/01/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/03/2025Pass-Final House ConnectionPassView ↗
01/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 128
DateRequirementInspectorRole
08/04/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/04/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/04/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/04/2026FinalNARESH MAHANGUprogress
08/04/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/03/2026HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
08/03/2026Lighting controlsJUAN GOMEZenergy_progress
08/03/2026Shutoff dampersJUAN GOMEZenergy_progress
08/03/2026Energy Code Compliance InspectionsJUAN GOMEZprogress
08/03/2026FinalJUAN GOMEZprogress
08/03/2026Electrical motors and elevatorsJUAN GOMEZenergy_progress
08/03/2026HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/03/2026Mechanical SystemsJUAN GOMEZspecial
08/03/2026Duct leakage testing, insulation and designJUAN GOMEZenergy_progress
08/03/2026Maintenance informationJUAN GOMEZenergy_progress
08/03/2026HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
08/03/2026Exterior lighting powerJUAN GOMEZenergy_progress
08/03/2026Interior lighting powerJUAN GOMEZenergy_progress
08/03/2026MeteringJUAN GOMEZenergy_progress
08/03/2026Lighting in dwelling unitsJUAN GOMEZenergy_progress
07/07/2026Sprayed fire-resistant materialsJUAN GOMEZspecial
07/07/2026Air barrier continuity plan testingJUAN GOMEZenergy_progress
07/07/2026Insulation placement and R valuesJUAN GOMEZenergy_progress
07/07/2026VestibulesJUAN GOMEZenergy_progress
07/07/2026Fenestration air leakageJUAN GOMEZenergy_progress
Latest 25 of 128.
▾Documents — 271 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
08/26/2026X00097919-I1Request digital key ↗
08/23/2026X08055450-A6Request digital key ↗
08/23/2026X08055450-A5Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
03/28/2024240344962Open ↗
03/24/2023240344962Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
06/01/2023240344962Open ↗
03/24/2023240344962Open ↗
▸BISWORK PERMIT APPLICATION1
10/21/2020220729665Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram7
08/23/2026X08055450-A7Open ↗
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/23/2026X08055450-A7Open ↗
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/24/2023240344962Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/24/2023240344962Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026X08055450-I1Open ↗
▸Seals & Professional Certifications99
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/23/2026X08055450-A5Open ↗
08/23/2026X08055450-A1Open ↗
08/23/2026X08055450-P9Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/29/2026X08055450-A4Open ↗
09/29/2026X08055450-A4Open ↗
09/23/2026X08055450-A7Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/29/2026X08055450-A4Open ↗
09/29/2026X08055450-A4Open ↗
09/23/2026X08055450-A7Open ↗
Showing 3 of 28 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/24/2023240344962Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/24/2023240344962Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/15/2026X08055450-P2Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026X08055450-I1—
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist5
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
08/14/2026X08055450-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
04/30/2024240344962Open ↗
03/24/2023240344962Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/21/2020220729665Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/14/2023240344962Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/30/2024240344962Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/21/2020220729665Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/21/2020220729665Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026X08055450-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026X08055450-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWOER: Notice to Proceed14
08/23/2026X08055450-A5Open ↗
08/23/2026X08055450-P4Open ↗
08/23/2026X08055450-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/23/2026X08055450-S2Open ↗
08/15/2026X08055450-S9Open ↗
08/15/2026X08055450-S8Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/24/2023240344962Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/21/2020220729665Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/23/2026X08055450-S2Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/23/2026X08055450-A5Open ↗
08/23/2026X08055450-P4Open ↗
08/15/2026X08055450-S5Open ↗
▸DOB NOWTR5 Test Report1
08/15/2026X08055450-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026X08055450-S5Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/23/2026X08055450-A5Open ↗
08/23/2026X08055450-P7Open ↗
08/23/2026X08055450-P6Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/24/2023240344962Open ↗
10/21/2020220729665Open ↗
10/21/2020220729665Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
10/21/2020220729665Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/21/2020220729665Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
04/30/2024240344962Open ↗
06/01/2023240344962Open ↗
10/21/2020220729665Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/21/2020220729665Open ↗
10/14/2020220729665Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/24/2023240344962Open ↗
▸BISEFILING COVER SHEET1
03/27/2020220729665Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2023240344962Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification5
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
08/14/2026X08055450-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
08/14/2026X08055450-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/23/2026X08055450-A7Open ↗
08/15/2026X08055450-P2Open ↗
08/14/2026X08055450-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
03/24/2023240344962Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/14/2026X08055450-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026X08055450-S8Open ↗