← Back
BROOKLYN
The 409 Knickerbocker Condominium
409 KNICKERBOCKER AVENUE · BIN 3074801
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof2p · 2 filings · 20 docs
Bulkhead7p · 3 filings · 20 docs
Floor 46p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 11p · 1 filing · 9 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UGB CONSTRUCTION1607/08/2026
PARSONS CONSTRUCTION807/08/2026
BUSHWICK BAY INC.903/22/2026
CRICKET303/22/2026
BSD 4091903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2019$2.1M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR103/21/2026
JAM CONSULTANTS, INC.703/21/2026
L&C ASSOCIATES703/21/2026
KORMAN DESIGN & BUILD403/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGB CONSTRUCTION INCGeneral Contractor1007/08/2026
H & K RENOVATION INCGeneral Contractor603/21/2026
KJK ELECTRIC INC 003451General Contractor603/22/2026
PARSONS CONSTRUCTION INCGeneral Contractor507/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
N&K PLMBNG AND HTNG CORPPlumbing207/08/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
BDS ELECTRIC CORP.Electrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
CHI WAI CHUNGElectrical103/21/2026
KJK ELECTRIC INCElectrical103/22/2026
PHILTON CONTRACTING, LLCFire Protection107/08/2026
GABRIEL MIHALCEAGeneral Contractor107/08/2026
UNDERCONSTRUCTION AKS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083504/05/2024
KORMAN DESIGN & BUILD8792210/11/2023
LAM AND CO CONSULTING LLC8864110/09/2023
IP CONCRETE TESTING AND I62521105/31/2023
Building Lifecycle
All (123)Filed (21)Permit Issued (21)Signed Off (13)Violation (19)Inspection (15)Objection (4)Special Inspection (30)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
06/10/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
04/19/2024
Signed off — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-S4
04/19/2024
Signed off — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-I1
04/15/2024
Signed off — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-S3
04/12/2024
Permit issued — Mechanical Systems
B00952169-S4-MS
04/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
04/09/2024
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
04/09/2024
Special inspection requirement — Final
CALVIN TRAN
04/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
JAN PEREZ
04/09/2024
Special inspection requirement — Interior lighting power
THOMAS TUNG
04/09/2024
Special inspection requirement — Lighting controls
THOMAS TUNG
04/09/2024
Special inspection requirement — Exterior lighting power
THOMAS TUNG
04/05/2024
Filed — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-S4
04/05/2024
Filed — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-P1
04/05/2024
Filed — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-P2
04/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
JAN PEREZ
04/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/04/2024
Special inspection requirement — Exterior lighting power
THOMAS TUNG
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
04/04/2024
Special inspection requirement — Final
CALVIN TRAN
04/04/2024
Special inspection requirement — Lighting controls
THOMAS TUNG
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
04/04/2024
Special inspection requirement — Interior lighting power
THOMAS TUNG
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
01/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
THOMAS TUNG
01/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
THOMAS TUNG
01/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
THOMAS TUNG
01/29/2024
Special inspection requirement — Mechanical Systems
JAN PEREZ
01/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
CALVIN TRAN
01/29/2024
Special inspection requirement — Final
CALVIN TRAN
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
01/29/2024
Special inspection requirement — Maintenance information
CALVIN TRAN
01/26/2024
Signed off — Alteration
B00519532-I1
01/24/2024
Signed off — Alteration
INTERIOR RENOVATION OF STORE INCLUDING INSTALLATION OF PARTITION WALL AND COMMERCIAL KITCHEN HOOD FOR CONNECTING TO EXISTING EXHAUST DUCT
B00945343-I1
01/24/2024
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00936061-I1
01/22/2024
Signed off — Alteration
INTERIOR RENOVATION OF STORE INCLUDING INSTALLATION OF PARTITION WALL AND COMMERCIAL KITCHEN HOOD FOR CONNECTING TO EXISTING EXHAUST DUCT
B00945343-S1
01/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2023
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 8-FAMILY BUILDING IN 2ND FLOOR. AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00939908-I1
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2023
Permit issued — Plumbing
B00952169-S3-PL
12/04/2023
Filed — Alteration
KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR SYSTEM, NEW SPLIT AC SYSTEM AS PER PLAN, THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00952169-S3
12/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/30/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
11/13/2023
Permit issued — Sign
B00936061-I1-SG
11/08/2023
Permit issued — Plumbing
B00945343-S1-PL
11/01/2023
Permit issued — General Construction
B00939908-I1-GC
11/01/2023
Permit issued — General Construction
B00952169-I1-GC
10/31/2023
Permit issued — General Construction
B00945343-I1-GC
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offH & K RENOVATION INC04/12/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/12/2023
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC11/13/2023
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC11/08/2023
DOB NOWGeneral ConstructionSigned-offUNDERCONSTRUCTION AKS INC11/01/2023
DOB NOWGeneral ConstructionSigned-offH & K RENOVATION INC11/01/2023
DOB NOWGeneral ConstructionSigned-offGABRIEL MIHALCEA10/31/2023
DOB NOWMechanical SystemsSigned-offUGB CONSTRUCTION INC03/20/2023
DOB NOWPlumbingSigned-offPHILTON CONTRACTING, LLC08/01/2022
DOB NOWPlumbingSigned-offN&K PLMBNG AND HTNG CORP07/19/2022
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC07/18/2022
DOB NOWSprinklersSigned-offN&K PLMBNG AND HTNG CORP03/09/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/28/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/19/2022
DOB NOWSupported ScaffoldSigned-offUGB CONSTRUCTION INC06/11/2021
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC06/08/2021
DOB NOWStructuralSigned-offUGB CONSTRUCTION INC04/22/2021
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC04/01/2021
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC02/08/2021
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC01/27/2021
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/15/2021
BIS—ISSUEDADAM B. CONTTRACTING INC11/01/2022
BIS—ISSUEDADAM B. CONTTRACTING INC10/21/2022
BIS—ISSUEDUGB CONSTRUCTION INC03/18/2022
BIS—ISSUEDUGB CONSTRUCTION INC01/31/2022
BIS—ISSUEDUGB CONSTRUCTION INC08/27/2021
BIS—ISSUEDUGB CONSTRUCTION INC07/09/2021
BIS—ISSUEDUGB CONSTRUCTION INC02/23/2021
BISPLISSUEDNEW YORK STANDARD MECH CORP05/01/2018
BISOTISSUEDWHISK REMODELING CORP05/01/2018
BISMHISSUEDON-CALL MECHANICAL CORP05/08/2017
BISPLISSUEDRICHMOND P & H CO., INC08/25/2016
BISPLISSUEDS & J INDUSTRIAL CORP04/25/2016
BISMHISSUEDBOYNTON DESIGN & CONSTRUC01/14/2016
BISFPISSUEDUNIQUE FIRE SYSTEMS INC09/02/2015
BISPLISSUEDS & J INDUSTRIAL CORP06/05/2015
BISOTISSUEDPETER REDMOND05/11/2015
BISOTISSUEDTRIPLE 8 CONSTRUCTION INC10/16/2009
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD05/24/2006
BISOTISSUEDCOMPLETE CONTRACTOR & ABATEMENT08/11/2004
+ 2 more permits on file
8 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteMARTINEZ ELECTRICAL CONT—
04/03/2024CompleteKJK ELECTRIC INCGeneral Wiring
11/15/2023CompleteR.J. ELEC AND MAINTENANCEGeneral Wiring
09/23/2023CompleteJONG HYUN KIM—
09/06/2023CompleteT.M.T ELECTRIC INCGeneral Wiring
09/13/2022CompleteAMERICAN POWER ELECT CONSGeneral Wiring
11/10/2021CompleteTUXEDO ELEC'L CONTR'G INC—
12/23/2020CompleteBDS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2023Pass-Final Sign Permit InspectionPassView ↗
03/01/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/07/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
04/09/2024Interior lighting powerTHOMAS TUNGenergy_progress
04/09/2024FinalCALVIN TRANprogress
04/09/2024Exterior lighting powerTHOMAS TUNGenergy_progress
04/09/2024Lighting controlsTHOMAS TUNGenergy_progress
04/09/2024Tenant Protection Plan ComplianceJAN PEREZspecial
04/09/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
04/09/2024Energy Code Compliance InspectionsTHOMAS TUNGprogress
04/05/2024Tenant Protection Plan Compliance—special
04/05/2024Tenant Protection Plan Compliance—special
04/05/2024Tenant Protection Plan ComplianceJAN PEREZspecial
04/04/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
04/04/2024Exterior lighting powerTHOMAS TUNGenergy_progress
04/04/2024Lighting controlsTHOMAS TUNGenergy_progress
04/04/2024Interior lighting powerTHOMAS TUNGenergy_progress
04/04/2024FinalCALVIN TRANprogress
04/04/2024Energy Code Compliance InspectionsTHOMAS TUNGprogress
01/30/2024HVAC-R and service water piping design and insulationTHOMAS TUNGenergy_progress
01/30/2024HVAC-R and service water heating equipmentTHOMAS TUNGenergy_progress
01/30/2024Energy Code Compliance InspectionsTHOMAS TUNGprogress
01/30/2024HVAC-R and service water heating system controlsTHOMAS TUNGenergy_progress
01/29/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
01/29/2024Mechanical SystemsJAN PEREZspecial
01/29/2024Duct leakage testing, insulation and designCALVIN TRANenergy_progress
01/29/2024Maintenance informationCALVIN TRANenergy_progress
01/29/2024FinalCALVIN TRANprogress
Latest 25 of 82.
▾Documents — 391 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch10
09/01/2026B00519532-I1Request digital key ↗
08/26/2026B00936061-I1Request digital key ↗
08/26/2026B00939908-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00368856-I1Request digital key ↗
08/15/2026B00368856-P1Request digital key ↗
08/14/2026B00368856-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/27/2026B00368828-I1Request digital key ↗
08/27/2026B00368828-P1Request digital key ↗
08/27/2026B00368828-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026B00368598-P1Request digital key ↗
08/28/2026B00368598-I1Request digital key ↗
08/28/2026B00368598-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026B00368598-I1Request digital key ↗
08/28/2026B00368598-P2Request digital key ↗
08/15/2026B00368598-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/01/2026B00444207-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00445172-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION38
01/08/2025322119809Open ↗
03/29/2024301790186Open ↗
01/09/2024321743583Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION16
10/25/2022321589009Open ↗
08/30/2021321589009Open ↗
07/14/2021321589009Open ↗
Showing 3 of 16 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/26/2021340747561Open ↗
09/14/2020340747561Open ↗
▸BISDOT Permit - House Connection1
05/04/2023340747561Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
02/05/2021321589009Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM2
04/15/2022321589009Open ↗
10/19/2020321589009Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/01/2020321589009Open ↗
▸Seals & Professional Certifications109
▸DOB NOWProgress Inspector Seal & Signature40
09/30/2026B00952169-P1Open ↗
09/30/2026B00952169-P1Open ↗
09/30/2026B00952169-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/02/2026B00945343-I1Open ↗
09/01/2026B00952169-P2Open ↗
09/01/2026B00368598-P2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026B00444207-I1Open ↗
09/01/2026B00445172-I1Open ↗
09/01/2026B00519532-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
04/17/2018321743583Open ↗
06/15/2017321561911Open ↗
05/02/2017321561911Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/17/2018321743583Open ↗
05/02/2017321561911Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/17/2018321743583Open ↗
05/02/2017321561911Open ↗
Showing 2 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/22/2020340747561Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/17/2018321743583Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/15/2017321561911Open ↗
06/15/2017321561911Open ↗
10/31/2016321247156Open ↗
▸BISEQUIPMENT USE PERMITS2
06/16/2017321561911Open ↗
10/31/2016321247156Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
10/01/2020321589009Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/11/2022321589009Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/08/2023321589009Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
04/15/2022321589009Open ↗
01/26/2021340747561Open ↗
10/19/2020321589009Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
01/26/2021340747561Open ↗
07/22/2020340747561Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/01/2021321589009Open ↗
▸BISTenant Protection Plan and Notes1
04/17/2018321743583Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/26/2026B00945343-I1Open ↗
08/26/2026B00945343-S1Open ↗
08/26/2026B00952169-S3Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/01/2020321589009Open ↗
04/17/2018321743583Open ↗
Showing 2 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/17/2018321743583Open ↗
06/15/2017321561911Open ↗
05/02/2017321561911Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/10/2022321589009Open ↗
02/11/2022321589009Open ↗
02/01/2021321589009Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/15/2017321561911Open ↗
10/31/2016321247156Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00368828-I1Open ↗
08/13/2026B00368598-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/11/2022321589009Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/11/2022321589009Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/11/2022321589009Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/11/2022321589009Open ↗
▸BISFENESTRATION AREAS1
10/11/2022321589009Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/11/2022321589009Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
10/11/2022321589009Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/10/2022321589009Open ↗
02/11/2022321589009Open ↗
02/01/2021321589009Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/19/2021321589009Open ↗
02/19/2021321589009Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/09/2023321589009Open ↗
02/19/2021321589009Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/01/2021321589009Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/11/2022321589009Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/11/2022321589009Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/11/2022321589009Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
10/11/2022321589009Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/03/2025322119809Open ↗
01/03/2025322119809Open ↗
01/03/2025322119809Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
07/24/2023321589009Open ↗
07/13/2023321589009Open ↗
07/12/2023321589009Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/15/2017321561911Open ↗
10/31/2016321247156Open ↗
Showing 2 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
08/30/2021321589009Open ↗
07/14/2021321589009Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/04/2023340747561Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT11
10/19/2020321589009Open ↗
04/17/2018321743583Open ↗
06/15/2017321561911Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
10/25/2022321589009Open ↗
02/08/2021321589009Open ↗
02/05/2021321589009Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
05/04/2023340747561Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/05/2023321589009Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
04/26/2024321589009Open ↗
06/12/2023321589009Open ↗
12/23/2022321589009Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET8
01/08/2025322119809Open ↗
10/01/2020321589009Open ↗
07/15/2020321589009Open ↗
Showing 3 of 8 on file for this type
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION9
05/04/2023340747561Open ↗
05/04/2023340747561Open ↗
05/04/2023340747561Open ↗
Showing 3 of 9 on file for this type
▸BISPLOT DIAGRAM3
01/03/2025322119809Open ↗
03/08/2022321589009Open ↗
10/01/2020321589009Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/15/2022321589009Open ↗
09/09/2020321589009Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/01/2020321589009Open ↗
▸BISLOWEST FLOOR ELEVATION1
10/11/2022321589009Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/31/2016321247156Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/26/2021340747561Open ↗