← Back
BuildNYC
STATEN ISLAND
40P CLEVELAND PLACE
STATEN ISLAND · BIN 5176889
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedSt. John Villa53p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat230211/25/2024
Building Lifecycle
All (36)Filed (9)Objection (7)Special Inspection (20)
04/07/2026
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-P1
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
06/20/2025
Objection resolved — Addressed
04/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/03/2025
Objection raised — Other
04/03/2025
Objection raised — Other
03/27/2025
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S9
03/27/2025
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S8
03/27/2025
Special inspection requirement — Masonry
03/27/2025
Special inspection requirement — Post-installed Anchors
03/06/2025
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S6
03/05/2025
Special inspection requirement — Subgrade Inspections
03/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/05/2025
Special inspection requirement — Final
03/05/2025
Special inspection requirement — Concrete - Precast
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/31/2025
Special inspection requirement — Structural Steel - High Strength Bolting
01/31/2025
Special inspection requirement — Structural Steel - Details
01/31/2025
Special inspection requirement — Structural Steel - Welding
12/05/2024
Objection raised — Other
12/05/2024
Objection raised — Other
11/25/2024
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S1
11/25/2024
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S5
11/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
11/25/2024
Special inspection requirement — Deep Foundation Elements
STEPHEN LATUS
11/25/2024
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
11/22/2024
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S4
11/22/2024
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-S3
11/22/2024
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
11/22/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
STEPHEN LATUS
11/22/2024
Special inspection requirement — Subgrade Inspections
STEPHEN LATUS
11/21/2024
Filed — Alteration CO
ST JOHN VILLA: FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR A NEW PARKING LOT TO SERVE A NEW SCHOOL COMPLEX. FOUNDATION FOR SOLAR CANOPY AND RETAINING WALLS.
S01130686-I1
11/20/2024
Special inspection requirement — Final
STEPHEN LATUS
11/20/2024
Special inspection requirement — Footing and Foundation
11/20/2024
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 04/07/2026
Steel Concrete
FiledStatusContractorScope
04/07/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/27/2025Masonry—special
03/27/2025Post-installed Anchors—special
03/05/2025Subgrade Inspections—special
03/05/2025Subsurface Investigations (Borings/Test Pits)—special
03/05/2025Final—progress
03/05/2025Concrete - Precast—special
01/31/2025Structural Stability – Alterations of existing buildings—special
01/31/2025Structural Steel - High Strength Bolting—special
01/31/2025Structural Steel - Details—special
01/31/2025Structural Steel - Welding—special
11/25/2024Subsurface Investigations (Borings/Test Pits)—special
11/25/2024Deep Foundation ElementsSTEPHEN LATUSspecial
11/25/2024Post-installed AnchorsSTEPHEN LATUSspecial
11/22/2024Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
11/22/2024Subsurface Conditions – Fill Placement & In-Place DensitySTEPHEN LATUSspecial
11/22/2024Subgrade InspectionsSTEPHEN LATUSspecial
11/20/2024FinalSTEPHEN LATUSprogress
11/20/2024Footing and Foundation—progress
11/20/2024Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. John VillaEducation—
Project S01130686 Alteration CO · Filing Withdrawn · 11/21/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026S01130686-P1Request digital key ↗
08/20/2026S01130686-S6Request digital key ↗
08/20/2026S01130686-S5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
08/20/2026S01130686-P1Open ↗
08/13/2026S01130686-I1Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/20/2026S01130686-P1Open ↗
08/13/2026S01130686-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026S01130686-P1Open ↗
08/15/2026S01130686-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026S01130686-P1Open ↗
08/20/2026S01130686-S9Open ↗
08/20/2026S01130686-S8Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/20/2026S01130686-P1Open ↗
08/20/2026S01130686-S6Open ↗
08/15/2026S01130686-S8Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S01130686-S1Open ↗
08/13/2026S01130686-S6Open ↗
08/13/2026S01130686-S9Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01130686-S9Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/20/2026S01130686-P1Open ↗
08/20/2026S01130686-S6Open ↗
08/20/2026S01130686-S5Open ↗
Showing 3 of 10 on file for this type
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
08/20/2026S01130686-P1Open ↗
08/13/2026S01130686-I1Open ↗
08/13/2026S01130686-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification2
08/20/2026S01130686-P1Open ↗
08/15/2026S01130686-I1Open ↗