Elevator apt, semi-fireproof without stores
Queensbridge South (NYCHA)
41-01 VERNON BOULEVARD · BIN 4433406
💬 Discuss this project
1939Year Built
6Stories
D1Building Class
R6Zoning
774,036 sfGross Floor Area
1,115Units
LL97 Covered65 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 671,000 sf lot · 1.15 FAR built · Flood zone X500
Locations of Work
Structural
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA708/29/2026
NEW YORK CITY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUPERSTRUCTURES ENG. + ARCH.404/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JEMCO ELECTRICAL CONT INCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106404/21/2026
Building Lifecycle
All (37)Filed (4)Permit Issued (2)Signed Off (1)Violation (1)Inspection (1)Special Inspection (28)
05/08/2026
Signed off — Alteration
Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.
Q01254932-I1
04/23/2026
Special inspection requirement — Final
Paul Millman
04/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/21/2026
Filed — Alteration
Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.
Q01254932-P4
04/20/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/20/2026
Special inspection requirement — Final
Paul Millman
04/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/15/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/12/2026
Permit issued — General Construction
Q01254932-I1-GC
03/12/2026
Permit issued — General Construction
Q01254932-I1-FO
12/02/2025
Filed — Alteration
Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.
Q01254932-P3
12/01/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
12/01/2025
Special inspection requirement — Final
Paul Millman
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
12/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/01/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/01/2025
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Tony Canale
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/01/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/29/2025
Filed — Alteration
Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.
Q01254932-P1
07/25/2025
Filed — Alteration
Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.
Q01254932-I1
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJEMCO ELECTRICAL CONT03/12/2026
DOB NOWGeneral ConstructionSigned-offJEMCO ELECTRICAL CONT03/12/2026
3 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026Permit IssuedTRI-STATE ELECL & MECHL IGeneral Wiring
04/09/2026CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
10/28/2022CompleteNEE ELECTRICAL, LLC—
1 project · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026Signed-offJEMCO ELECTRICAL CONT INC4 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/15/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/23/2026FinalPaul Millmanprogress
04/23/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
04/23/2026Footing and FoundationGEORGE GHEBRYALprogress
04/23/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
04/23/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/23/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/23/2026MasonryGEORGE GHEBRYALspecial
04/23/2026Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
04/23/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/20/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/20/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/20/2026MasonryGEORGE GHEBRYALspecial
04/20/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/20/2026Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
04/20/2026Tenant Protection Plan Compliance—special
04/20/2026FinalPaul Millmanprogress
04/20/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
04/20/2026Footing and FoundationGEORGE GHEBRYALprogress
12/01/2025Footing and FoundationGEORGE GHEBRYALprogress
12/01/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
12/01/2025FinalPaul Millmanprogress
12/01/2025Tenant Protection Plan Compliance—special
12/01/2025Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
12/01/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/01/2025MasonryGEORGE GHEBRYALspecial
Latest 25 of 28.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01254932-P4Request digital key ↗
08/17/2026Q01254932-P3Request digital key ↗
08/17/2026Q01254932-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
04/06/2015421086014Open ↗
03/23/2015421086014Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
03/23/2015421086014Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01254932-P4Open ↗
09/01/2026Q01254932-P4Open ↗
08/24/2026Q01254932-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01254932-P4Open ↗
09/01/2026Q01254932-P4Open ↗
08/24/2026Q01254932-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01254932-P4Open ↗
08/17/2026Q01254932-P1Open ↗
08/17/2026Q01254932-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/23/2015421086014Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01254932-P1Open ↗
08/17/2026Q01254932-I1Open ↗
08/17/2026Q01254932-P4Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/23/2015421086014Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/17/2026Q01254932-P4Open ↗
08/17/2026Q01254932-P1Open ↗
08/17/2026Q01254932-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01254932-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/17/2026Q01254932-I1Open ↗
08/17/2026Q01254932-P4Open ↗
08/17/2026Q01254932-P1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/23/2015421086014Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/23/2015421086014Open ↗