← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
College Tower Condominium
41-05 COLLEGE POINT BLVD · BIN 4618362
💬 Discuss this project
2002Year Built
7Stories
RMBuilding Class
R6Zoning
59,305 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized43 Open Violations 35 unresolved · 8 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 12,935 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION607/08/2026
COLLEGE TOWERS CONDO ASSN403/22/2026
COLLEGE TOWER CONDOMINIUM103/22/2026
THE OWNER OF 41-07 COLLEG203/22/2026
C. POINT IA LLC103/22/2026
LO VINCENT COLLEGE TOWER103/22/2026
C.POINT 1A LLC103/22/2026
COLLEGE POINT TOWER1703/22/2026
FARRINGTON CONSTRUCTION I303/22/2026
METAL STONE CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAIDER ENGINEERING, P.E.106/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
VAN VASSELLElectrical103/21/2026
Building Lifecycle
All (69)Filed (1)Permit Issued (2)Facade (FISP) (6)Violation (60)
05/07/2026
Violation issued (HPD, open)
A
04/03/2026
Violation issued (HPD, open)
A
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, closed)
C
01/22/2026
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/24/2023
Violation issued (HPD, closed)
I
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/2022
Violation issued (ECB, open)
Boilers
03/08/2022
Violation issued (HPD, closed)
A
09/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
B
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
09/02/2021
Violation issued (HPD, open)
A
06/15/2021
Violation issued (ECB, open)
Elevators
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2021
Cycle 9 facade report signed — SAFE
01/12/2021
Cycle 9 facade report submitted
11/20/2020
Cycle 9 facade inspection completed
11/17/2020
Violation issued (ECB, closed)
Cranes and Derricks
11/05/2020
Violation issued (ECB, closed)
Construction
11/05/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2020
Violation issued (ECB, closed)
Construction
07/30/2020
Violation issued (ECB, closed)
Construction
06/19/2020
Permit issued — Supported Scaffold
Q00177728-I1-SF
02/13/2020
Violation issued (ECB, closed)
Construction
02/13/2020
Violation issued (ECB, closed)
Construction
02/13/2020
Violation issued (ECB, closed)
Construction
06/19/2019
Filed — Alteration
Q00177728-I1
06/19/2019
Permit issued — Supported Scaffold
Q00177728-I1-SF
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2018
Violation issued (ECB, open)
Local Law
06/19/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2017
Violation issued (ECB, open)
Construction
02/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2017
Violation issued (ECB, open)
Construction
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC06/19/2020
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC06/19/2019
BISOTISSUEDRONG MAINTENANCE INC12/22/2020
BISEQISSUEDTRI BOROUGH SCAFFOLDING11/13/2020
BISOTISSUEDEXCEL MGMT & MAINTENANCE02/07/2020
BISEQISSUEDTRI BOROUGH SCAFFOLDING04/10/2019
BISEQISSUEDTRI BOROUGH SCAFFOLDING03/15/2018
BISEQISSUEDTRI BOROUGH SCAFFOLDING03/07/2017
BISPLISSUEDMASTERS MECHANICAL PLBG & HTG CO10/15/2008
BISPLISSUEDMASTERS MECHANICAL PLBG & HTG CO06/16/2006
BISOTISSUEDBR GENERAL CONTRACTORS INC05/22/2006
BISMHISSUED168 CONSTRUCTION INC05/03/2006
BISMHISSUED168 CONSTRUCTION INC05/03/2006
BIS—ISSUEDPROSPERITY DEVELOPMENT CO12/26/2003
BISEQISSUEDPROSPERITY DEVELOPMENT INC12/26/2003
BISEQISSUEDPROSPERITY DEVELOPMENT INC10/10/2003
BIS—ISSUEDPROSPERITY DEVELOPMENT CO10/10/2003
BISSPISSUEDB.H.PLBG. & HTG. CORP.04/29/2003
BISPLISSUEDB.H. PLUMBING & HEATING CORP.04/29/2003
BIS—ISSUEDPROSPERITY DEVELOPMENT CO11/25/2002
BIS—ISSUEDMETAL STONE COSNTRUCTION09/05/2002
BISEQISSUEDMETAL STONE COSNTRUCTION09/05/2002
BISSDISSUEDB.H.PLBG. & HTG. CORP.04/30/2002
BIS—ISSUEDMETAL STONE COSNTRUCTION04/16/2002
BISPLISSUEDB.H. PLUMBING & HEATING CORP.12/19/2001
BISEQRE-ISSUEDMETAL STONE COSNTRUCTION12/17/2001
BIS—ISSUEDMETAL STONE COSNTRUCTION09/28/2001
BISEQISSUEDMETAL STONE COSNTRUCTION09/28/2001
BIS—ISSUEDFARRINGTON CONSTRUCTION INC03/07/2001
BISEQISSUEDFARRINGTON CONSTRUCTION INC03/07/2001
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00177728-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION7
01/28/2021421216632Open ↗
12/11/2020440388439Open ↗
02/18/2020421216632Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/06/2019421216632Open ↗
03/03/2017440388439Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/06/2019421216632Open ↗
08/06/2019421216632Open ↗
08/06/2019421216632Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/06/2019421216632Open ↗
03/03/2017440388439Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/06/2019421216632Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/03/2017440388439Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/03/2017440388439Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/28/2026Q00177728-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
08/06/2019421216632Open ↗
03/03/2017440388439Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/06/2019421216632Open ↗
08/06/2019421216632Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/26/2021421216632Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/03/2017440388439Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/26/2021421216632Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/26/2021421216632Open ↗
03/03/2017440388439Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/11/2020440388439Open ↗
12/11/2020440388439Open ↗
04/10/2019440388439Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
04/10/2019440388439Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2021421216632Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/26/2021421216632Open ↗
08/06/2019421216632Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
01/28/2021421216632Open ↗
12/11/2020440388439Open ↗
▸BISEFILING COVER SHEET1
08/06/2019421216632Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/03/2017440388439Open ↗
▸BISADDITIONAL INFORMATION1
01/21/2020421216632Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/28/2021421216632Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/26/2021421216632Open ↗