← Back
BuildNYC
Predominantly retail with other uses
41-11 39TH STREET
QUEENS · Sunnyside · BIN 4002424
💬 Discuss this project
1960Year Built
1Stories
K4Building Class
M1-4Zoning
7,500 sfGross Floor Area
2Units
Predominantly retail with other uses · Owner of record: Mimo Realty · 7,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofA J Recycling7p · 2 filings · 20 docs
Floor 1A J Recycling19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mino Realty403/21/2026
Alewife Brewing Company103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Abs Engineering511/17/2021
Kushner Studios104/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kushner Studios603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Metropolitan P&HPlumbing507/08/2026
New York HVAC Specialstspecialty_contractor303/21/2026
A2K ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544511/17/2021
Building Lifecycle
All (40)Filed (6)Permit Issued (6)Signed Off (3)Special Inspection (25)
12/17/2021
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING UG 17 SPACE AS PER CO #191268 AS INDICATED IN THE DRAWINGS FILED HEREIN IN CONJUNCTION WITH ALT II #440559691.
Q00191874-I1
11/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/18/2021
Special inspection requirement — HVAC and service water heating system controls
EUGENE BIFULCO
11/18/2021
Special inspection requirement — HVAC insulation and sealing
EUGENE BIFULCO
11/18/2021
Special inspection requirement — HVAC and service water heating equipment
EUGENE BIFULCO
11/18/2021
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/18/2021
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
11/17/2021
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING UG 17 SPACE AS PER CO #191268 AS INDICATED IN THE DRAWINGS FILED HEREIN IN CONJUNCTION WITH ALT II #440559691.
Q00191874-P1
11/10/2021
Special inspection requirement — HVAC and service water heating equipment
EUGENE BIFULCO
11/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/10/2021
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
11/10/2021
Special inspection requirement — HVAC insulation and sealing
EUGENE BIFULCO
11/10/2021
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/10/2021
Special inspection requirement — HVAC and service water heating system controls
EUGENE BIFULCO
11/04/2021
Permit issued — Plumbing
Q00191874-I1-PL
11/03/2021
Signed off — Alteration
INSTALLATION OF NEW PACKAGE HVAC SYSTEM
Q00237658-I1
10/31/2021
Special inspection requirement — Final
EUGENE BIFULCO
10/31/2021
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
10/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/31/2021
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
10/31/2021
Special inspection requirement — Maintenance information
EUGENE BIFULCO
10/31/2021
Special inspection requirement — HVAC and service water heating equipment
EUGENE BIFULCO
10/31/2021
Special inspection requirement — HVAC and service water heating system controls
EUGENE BIFULCO
10/31/2021
Special inspection requirement — HVAC insulation and sealing
EUGENE BIFULCO
10/27/2021
Filed — Alteration
INSTALLATION OF NEW PACKAGE HVAC SYSTEM
Q00237658-P1
04/22/2021
Signed off — Alteration
INSTALLATION OF NEW PROCESS BOILER
Q00237667-I1
04/14/2021
Filed — No Work
Q00460351-I1
01/26/2021
Special inspection requirement — Public Assembly Emergency Lighting
EUGENE BIFULCO
10/28/2020
Permit issued — Boiler Equipment
Q00237667-I1-BE
10/28/2020
Permit issued — Plumbing
Q00191874-I1-PL
08/19/2020
Permit issued — Mechanical Systems
Q00237658-I1-MS
11/18/2019
Permit issued — Boiler Equipment
Q00237667-I1-BE
11/15/2019
Permit issued — Plumbing
Q00191874-I1-PL
11/11/2019
Filed — Alteration
INSTALLATION OF NEW PACKAGE HVAC SYSTEM
Q00237658-I1
11/04/2019
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING UG 17 SPACE AS PER CO #191268 AS INDICATED IN THE DRAWINGS FILED HEREIN IN CONJUNCTION WITH ALT II #440559691.
Q00191874-I1
11/04/2019
Filed — Alteration
INSTALLATION OF NEW PROCESS BOILER
Q00237667-I1
10/23/2019
Special inspection requirement — HVAC and service water heating equipment
EUGENE BIFULCO
10/23/2019
Special inspection requirement — Maintenance information
EUGENE BIFULCO
10/23/2019
Special inspection requirement — HVAC and service water heating system controls
EUGENE BIFULCO
10/23/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY Metropolitan P&H11/04/2021
DOB NOWBoiler EquipmentSigned-offNY Metropolitan P&H10/28/2020
DOB NOWPlumbingSigned-offNY Metropolitan P&H10/28/2020
DOB NOWMechanical SystemsSigned-offNew York HVAC Specialst08/19/2020
DOB NOWBoiler EquipmentSigned-offNY Metropolitan P&H11/18/2019
DOB NOWPlumbingSigned-offNY Metropolitan P&H11/15/2019
BIS—ISSUEDXenon Construction06/25/2020
BISMHISSUEDMisa Auto02/26/1999
BISPLISSUEDMayday Plumbing & Heating02/26/1999
BISOTISSUEDMisa Auto02/24/1999
BISPLISSUEDSideris Plumbing & Heating05/18/1994
BISOTISSUEDSideris Plumbing & Heating05/18/1994
1 project · most recent 07/20/2020
General Wiring
FiledStatusContractorScope
07/20/2020Permit IssuedA2K ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/18/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/18/2021HVAC and service water heating system controls EUGENE BIFULCOenergy_progress
11/18/2021HVAC insulation and sealing EUGENE BIFULCOenergy_progress
11/18/2021HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
11/18/2021Maintenance informationEUGENE BIFULCOenergy_progress
11/18/2021Energy Code Compliance InspectionsEUGENE BIFULCOprogress
11/10/2021HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
11/10/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/10/2021Energy Code Compliance InspectionsEUGENE BIFULCOprogress
11/10/2021HVAC insulation and sealing EUGENE BIFULCOenergy_progress
11/10/2021Maintenance informationEUGENE BIFULCOenergy_progress
11/10/2021HVAC and service water heating system controls EUGENE BIFULCOenergy_progress
10/31/2021FinalEUGENE BIFULCOprogress
10/31/2021Mechanical SystemsEUGENE BIFULCOspecial
10/31/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/31/2021Shutoff dampersEUGENE BIFULCOenergy_progress
10/31/2021Maintenance informationEUGENE BIFULCOenergy_progress
10/31/2021HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
10/31/2021HVAC and service water heating system controls EUGENE BIFULCOenergy_progress
10/31/2021HVAC insulation and sealing EUGENE BIFULCOenergy_progress
01/26/2021Public Assembly Emergency LightingEUGENE BIFULCOprogress
10/23/2019HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
10/23/2019Maintenance informationEUGENE BIFULCOenergy_progress
10/23/2019HVAC and service water heating system controls EUGENE BIFULCOenergy_progress
10/23/2019Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
A J RecyclingIndustrial / WarehouseFloor 1, Roof
Project Q00237658 Alteration · LOC Issued · 11/11/2019
Project Q00191874 Alteration · LOC Issued · 11/04/2019
Project Q00237667 Alteration · LOC Issued · 11/04/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00191874-I1Request digital key ↗
08/15/2026Q00191874-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00237658-I1Request digital key ↗
08/15/2026Q00237658-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/27/2026Q00460351-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/28/2026Q00237667-I1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION15
10/28/2025400836333Open ↗
02/07/2022401268702Open ↗
01/25/2022400836333Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION3
06/24/2020420666693Open ↗
11/08/2019440559691Open ↗
—420666693Open ↗
▸DOB NOWState DEC Permit2
08/13/2026Q00191874-P1Open ↗
08/13/2026Q00191874-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/22/2020420666693Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026Q00237667-I1Open ↗
09/23/2026Q00237667-I1Open ↗
09/23/2026Q00237667-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00237658-P1Open ↗
08/27/2026Q00237658-I1Open ↗
08/27/2026Q00191874-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00237667-I1Open ↗
08/27/2026Q00191874-P1Open ↗
08/26/2026Q00191874-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/08/2019440559691Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/25/2022420666693Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/17/2020420666693Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00237658-I1Open ↗
08/27/2026Q00237658-P1Open ↗
08/27/2026Q00191874-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/17/2020420666693Open ↗
08/08/2019440559691Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/10/2021440559691Open ↗
11/22/2021420666693Open ↗
06/18/2020420666693Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/10/2021420666693Open ↗
▸BISLIGHTING CONTROLS1
12/10/2021420666693Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/09/2021420666693Open ↗
▸BISENERGY COST BUDGET WORKSHEET1
11/22/2021420666693Open ↗
▸BISINTERIOR LIGHTING POWER1
12/10/2021420666693Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/10/2021440559691Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/10/2021440559691Open ↗
11/22/2021420666693Open ↗
06/18/2020420666693Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/10/2021420666693Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/10/2021420666693Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE10
03/16/2021420666693Open ↗
03/15/2021420666693Open ↗
03/11/2021420666693Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/16/2021440559691Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
12/10/2021440559691Open ↗
11/22/2021420666693Open ↗
03/10/2020420666693Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/10/2021420666693Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION11
07/28/2021420666693Open ↗
06/24/2021420666693Open ↗
02/22/2021420666693Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET1
01/17/2020420666693Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/08/2019440559691Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/07/2022401268702Open ↗
▸BISSITE SURVEY1
12/21/2020420666693Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/28/2025400836333Open ↗
▸BISPLOT DIAGRAM1
01/22/2020420666693Open ↗