← Back
Walk-up apt, over six families with stores
41-16 34 AVENUE
QUEENS · BIN 4010928
💬 Discuss this project
1924Year Built
4Stories
C7Building Class
R6BZoning
8,532 sfGross Floor Area
13Units
Rent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 149 GREEN STREET LLC · 2,575 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
149 GREEN STREET503/22/2026
SKYWORX CONTRACTING403/22/2026
UNITED A1 CONSTRUCTION IN103/22/2026
41-16 34TH AVE LLC103/22/2026
NEW AMERICAN CONSTRUCTION INC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2020$3.3M—Private party → 149 GREEN STREET LLC$388/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INSIGHT STUDIO ARCHITECTURE PC107/23/2021
GREEN DESIGN106/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CBA CONSULTANTS203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEIMAR GROUP INCGeneral Contractor303/21/2026
Building Lifecycle
All (68)Filed (2)Permit Issued (1)Signed Off (2)Violation (60)Inspection (1)Special Inspection (2)
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
04/12/2024
Violation issued (HPD, closed)
A
10/19/2023
Signed off — Alteration
Q00554282-I1
10/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/07/2023
Permit issued — General Construction
Q00554282-I1-GC
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2023
Violation issued (HPD, open)
A
02/28/2023
Violation issued (HPD, closed)
C
12/05/2022
Violation issued (HPD, closed)
B
12/05/2022
Violation issued (HPD, closed)
C
12/05/2022
Violation issued (HPD, closed)
C
12/05/2022
Violation issued (HPD, closed)
C
12/05/2022
Violation issued (HPD, closed)
B
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
02/05/2022
Violation issued (HPD, closed)
A
02/05/2022
Violation issued (HPD, closed)
C
02/05/2022
Violation issued (HPD, closed)
C
02/05/2022
Violation issued (HPD, closed)
A
02/05/2022
Violation issued (HPD, closed)
A
02/05/2022
Violation issued (HPD, closed)
A
07/23/2021
Filed — Alteration
Q00554282-I1
07/08/2021
Special inspection requirement — Fenestration air leakage
Rodrigo Torres
06/23/2021
Violation issued (ECB, open)
Construction
04/14/2021
Violation issued (HPD, closed)
A
01/05/2021
Violation issued (HPD, closed)
B
11/12/2019
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00184072-I1
11/01/2019
Violation issued (HPD, closed)
I
06/24/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00184072-I1
06/22/2019
Special inspection requirement — Final
BRIAN T. O'CONNOR
02/27/2019
Violation issued (ECB, closed)
Boilers
04/23/2018
Violation issued (HPD, closed)
A
04/23/2018
Violation issued (HPD, closed)
A
12/30/2017
Violation issued (HPD, closed)
B
12/30/2017
Violation issued (HPD, closed)
B
11/27/2017
Violation issued (HPD, closed)
B
11/27/2017
Violation issued (HPD, closed)
C
11/27/2017
Violation issued (HPD, closed)
B
11/27/2017
Violation issued (HPD, closed)
B
11/27/2017
Violation issued (HPD, closed)
C
05/13/2016
Violation issued (HPD, closed)
B
05/13/2016
Violation issued (HPD, closed)
A
03/28/2016
Violation issued (HPD, closed)
B
03/19/2016
Violation issued (HPD, closed)
B
03/19/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
03/11/2016
Violation issued (HPD, closed)
B
01/19/2016
Violation issued (HPD, closed)
B
01/14/2016
Violation issued (HPD, closed)
B
01/14/2016
Violation issued (HPD, closed)
A
01/14/2016
Violation issued (HPD, closed)
B
07/07/2014
Violation issued (HPD, closed)
A
07/07/2014
Violation issued (HPD, closed)
B
04/22/2014
Violation issued (ECB, closed)
Construction
01/14/2014
Violation issued (HPD, closed)
B
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEIMAR GROUP INC09/07/2023
BISEQISSUEDSKYWORX CONTRACTING INC04/02/2014
BISFPISSUEDFIRE COMMAND CO, INC08/23/2013
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM03/15/2001
4 projects · most recent 01/26/2022
General Wiring
FiledStatusContractorScope
01/26/2022Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
11/18/2020Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
06/24/2019CompleteRICHARD NEU—
05/15/2019CompleteEPC ELECTRICAL CORP.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/08/2021Fenestration air leakageRodrigo Torresenergy_progress
06/22/2019FinalBRIAN T. O'CONNORprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00184072-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00554282-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
04/01/2014440136470Open ↗
09/03/2013420868706Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/01/2014440136470Open ↗
07/25/2013420868706Open ↗
▸Seals & Professional Certifications9
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
07/25/2013420868706Open ↗
09/03/2013420868706Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00184072-I1Open ↗
08/13/2026Q00554282-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00184072-I1Open ↗
08/29/2026Q00554282-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/01/2014440136470Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/01/2014440136470Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/01/2014440136470Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/25/2013420868706Open ↗
▸Environmental & Asbestos1
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/25/2013420868706Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00554282-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/01/2014440136470Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
07/25/2013420868706Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/25/2013420868706Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/25/2013420868706Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/01/2014440136470Open ↗