← Back
Predominantly retail with other uses
41-20B COLLEGE POINT BLVD
QUEENS · BIN 4462348
💬 Discuss this project
1989Year Built
2Stories
K4Building Class
R6Zoning
2,000 sfGross Floor Area
3Units
9 Open Violations ▸
Predominantly retail with other uses · Owner of record: C & T H. K. INC · 1,304 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 21p · 1 filing · 15 docs
Floor 11p · 1 filing · 15 docs
Cellar5p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C&T H.K.INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP203/26/2024
SHAABAN ENGINEERING, LLC108/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
KAZAM CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
NATIONAL MAINTENANCEScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371103/26/2024
NIC DESIGN INC9758103/26/2024
Building Lifecycle
All (39)Filed (3)Permit Issued (3)Signed Off (2)Violation (15)Inspection (4)Special Inspection (12)
01/09/2026
Signed off — Alteration
INSTALL NEW HVAC IN ROOF, CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01016820-S1
12/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/28/2024
Permit issued — Plumbing
Q01016820-S1-PL
03/27/2024
Permit issued — Mechanical Systems
Q01016820-I1-MS
03/26/2024
Filed — Alteration
INSTALL NEW HVAC IN ROOF, CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01016820-S1
03/26/2024
Filed — Alteration
INSTALL NEW HVAC IN ROOF, CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01016820-I1
03/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
03/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/26/2024
Special inspection requirement — Permanent certificate
Eric Sun
03/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
03/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
03/07/2024
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
03/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/07/2024
Special inspection requirement — Maintenance information
Eric Sun
03/07/2024
Special inspection requirement — Mechanical Systems
Eric Sun
03/07/2024
Special inspection requirement — Final
Eric Sun
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/19/2019
Violation issued (ECB, closed)
Construction
11/19/2019
Violation issued (ECB, closed)
Construction
11/19/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Signed off — Alteration
Erect non-illuminated accessory business wall sign reading "Allstate"
Q00197356-I1
08/23/2019
Filed — Alteration
Erect non-illuminated accessory business wall sign reading "Allstate"
Q00197356-I1
08/23/2019
Permit issued — Sign
Q00197356-I1-SG
07/29/2019
Special inspection requirement — Final
AHMED SHAABAN
05/14/2018
Violation issued (ECB, closed)
Construction
05/14/2018
Violation issued (ECB, closed)
Construction
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2006
Violation issued (ECB, closed)
Boilers
10/17/2006
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/28/2024
DOB NOWMechanical SystemsPermit IssuedCUBE BUILDERS GROUP NY03/27/2024
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC08/23/2019
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/26/2024Fire-Resistance Rated ConstructionEric Sunprogress
03/26/2024Fire-Resistant Penetrations and JointsEric Sunspecial
03/26/2024Permanent certificateEric Sunenergy_progress
03/07/2024Energy Code Compliance InspectionsEric Sunprogress
03/07/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
03/07/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
03/07/2024Duct leakage testing, insulation and designEric Sunenergy_progress
03/07/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
03/07/2024Maintenance informationEric Sunenergy_progress
03/07/2024Mechanical SystemsEric Sunspecial
03/07/2024FinalEric Sunprogress
07/29/2019FinalAHMED SHAABANprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/23/2026Q01016820-S1Request digital key ↗
08/23/2026Q01016820-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00197356-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature10
08/26/2026Q00197356-I1Open ↗
08/26/2026Q01016820-I1Open ↗
08/26/2026Q01016820-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00197356-I1Open ↗
08/13/2026Q01016820-S1Open ↗
08/13/2026Q01016820-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01016820-I1Open ↗
08/26/2026Q01016820-I1Open ↗