← Back
BuildNYC
Elevator cooperative
41-35 45TH STREET
QUEENS · Sunnyside · BIN 4430581
💬 Discuss this project
1943Year Built
6Stories
D4Building Class
R7AZoning
250,000 sfGross Floor Area
320Units
LL97 CoveredRent Stabilized52 Active Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: Sunnyside Owners · 66,800 sf lot · 3.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPortico slab and masonry cleaningUnder Construction5p · 1 filing · 10 docs
Floor 1Portico slab and masonry cleaningUnder Construction9p · 2 filings · 20 docs
CellarSprinkler systems installation5p · 1 filing · 12 docs
Site & exteriorPortico slab and masonry cleaningUnder Construction11p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sunnyside Owners903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services210/14/2024
Spar Unlimited110/08/2024
Alberto Roman104/16/2021
Basic Groups108/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Awr GroupGeneral Contractor407/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
S.A.L. Electric CoElectrical103/22/2026
Andamio ScaffoldingScaffold107/08/2026
Master Tech PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Spar Unlimited5967110/08/2024
AR-Tech Engineering6659108/25/2020
Building Lifecycle
All (88)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Special Inspection (16)
06/08/2026
Permit issued — General Construction
Q00883354-I1-GC-CX
05/07/2026
Violation issued (HPD, closed)
A
10/07/2025
Permit issued — General Construction
Q00883354-I1-GC-CX
07/28/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105398-I1
04/08/2025
Violation issued (HPD, open)
C
04/01/2025
Violation issued (HPD, open)
C
04/01/2025
Violation issued (HPD, open)
C
12/02/2024
Violation issued (HPD, open)
B
12/02/2024
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
B
12/02/2024
Violation issued (HPD, open)
B
12/02/2024
Violation issued (HPD, open)
B
12/02/2024
Violation issued (HPD, open)
A
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
A
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, open)
A
11/20/2024
Violation issued (HPD, open)
C
11/20/2024
Violation issued (HPD, closed)
A
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
B
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
A
11/15/2024
Permit issued — Structural
Q00883354-I1-GC-CX
10/14/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105398-P1
10/08/2024
Filed — Alteration
Replacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No interior work.
Q00883354-I1
09/19/2024
Special inspection requirement — Structural Cold-Formed Steel
SCOTT PROFETA
09/19/2024
Special inspection requirement — Insulation placement and R values
SCOTT PROFETA
09/19/2024
Special inspection requirement — Air barrier - visual inspection
SCOTT PROFETA
09/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
SCOTT PROFETA
09/06/2024
Permit issued — Sidewalk Shed
Q01105398-I1-SH
09/04/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105398-I1
08/16/2024
Special inspection requirement — Structural Steel - Details
SCOTT PROFETA
08/14/2024
Special inspection requirement — Masonry
SCOTT PROFETA
08/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SCOTT PROFETA
06/01/2023
Special inspection requirement — Final
SCOTT PROFETA
04/11/2023
Violation issued (HPD, closed)
B
04/11/2023
Violation issued (HPD, closed)
A
12/17/2022
Violation issued (HPD, closed)
C
02/09/2022
Violation issued (HPD, closed)
C
12/27/2021
Violation issued (HPD, closed)
B
12/27/2021
Violation issued (HPD, closed)
A
10/30/2021
Violation issued (HPD, open)
A
10/30/2021
Violation issued (HPD, open)
A
08/10/2021
Signed off — Alteration
NEW INSTALLATION OF NEW WASHERS AND DRYERS WITH SPRINKLERS IN THE CELLAR. NO CHANGE IN USE, EXITS OR OCCUPANCY.
Q00386988-I1
04/21/2021
Permit issued — Plumbing
Q00386988-I1-PL
04/20/2021
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
04/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
04/20/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
04/20/2021
Special inspection requirement — Maintenance information
ALBERTO ROMAN
04/16/2021
Filed — Alteration
NEW INSTALLATION OF NEW WASHERS AND DRYERS WITH SPRINKLERS IN THE CELLAR. NO CHANGE IN USE, EXITS OR OCCUPANCY.
Q00386988-P1
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAwr Group06/08/2026
DOB NOWGeneral ConstructionPermit IssuedAwr Group10/07/2025
DOB NOWStructuralPermit IssuedAwr Group11/15/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/06/2024
DOB NOWPlumbingSigned-offMaster Tech Plumbing04/21/2021
BISOTISSUEDMascon Restoration08/01/2012
BISOTISSUEDMascon Restoration03/12/2012
BISEQISSUEDSkyworx Contracting02/17/2012
BISBLISSUEDBrook Fuel Oil05/11/1994
BISOTRE-ISSUEDApollon Waterproofing Co07/22/1993
BISEQRE-ISSUEDApollon Waterproofing Co06/24/1993
3 projects · most recent 09/12/2024
FiledStatusContractorScope
09/12/2024CompleteBorowide Elect'l Contractors—
02/14/2023CompleteStar Electrical Contractors—
07/13/2021CompleteS.A.L. Electric Co—
1 project · most recent 10/08/2024
Steel
FiledStatusContractorScope
10/08/2024Permit IssuedAwr GroupSteel
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/19/2024Structural Cold-Formed SteelSCOTT PROFETAspecial
09/19/2024Insulation placement and R valuesSCOTT PROFETAenergy_progress
09/19/2024Air barrier - visual inspectionSCOTT PROFETAenergy_progress
09/19/2024Tenant Protection Plan ComplianceSCOTT PROFETAspecial
08/16/2024Structural Steel - DetailsSCOTT PROFETAspecial
08/14/2024MasonrySCOTT PROFETAspecial
08/14/2024Structural Stability – Alterations of existing buildingsSCOTT PROFETAspecial
06/01/2023FinalSCOTT PROFETAprogress
04/20/2021Post-installed AnchorsALBERTO ROMANspecial
04/20/2021Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
04/20/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
04/20/2021Maintenance informationALBERTO ROMANenergy_progress
04/16/2021Fire-Resistant Penetrations and Joints—special
04/16/2021Energy Code Compliance Inspections—progress
04/16/2021Post-installed Anchors—special
03/22/2021Maintenance informationALBERTO ROMANenergy_progress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/21/2026Q00883354-I1Request digital key ↗
08/21/2026Q01105398-P1Request digital key ↗
08/21/2026Q01105398-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00386988-I1Request digital key ↗
08/15/2026Q00386988-P1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION7
11/30/2013420924245Open ↗
11/30/2013420924245Open ↗
11/30/2013420924245Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
02/22/2012420535040Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/03/2014420922853Open ↗
11/30/2013420924245Open ↗
11/22/2013420922853Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00386988-P1Open ↗
08/23/2026Q00386988-I1Open ↗
08/23/2026Q00386988-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026Q00386988-I1Open ↗
08/23/2026Q00883354-I1Open ↗
08/23/2026Q00883354-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01105398-P1Open ↗
08/21/2026Q01105398-I1Open ↗
08/13/2026Q00883354-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
02/22/2012420535040Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/22/2012420535040Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/30/2013420924245Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/14/2014420924245Open ↗
▸BISSCHEDULE B - PLUMBING1
11/30/2013420924245Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026Q00386988-P1Open ↗
08/13/2026Q00386988-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
12/04/2013420924245Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00386988-I1Open ↗
08/13/2026Q00386988-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/26/2011420462092Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00883354-I1Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS3
03/30/2015420924245Open ↗
02/04/2014420922853Open ↗
07/08/2013420462092Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/26/2011420462092Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/31/2015420924245Open ↗
05/14/2014420924245Open ↗
05/14/2014420924245Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
02/22/2012420535040Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/31/2015420924245Open ↗
02/06/2014420922853Open ↗
07/15/2013420462092Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
03/31/2015420924245Open ↗
02/04/2014420922853Open ↗
11/30/2013420924245Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
11/30/2013420924245Open ↗
11/21/2013420922853Open ↗
02/22/2012420535040Open ↗
Showing 3 of 4 on file for this type