| Owner | Filings | Most Recent |
|---|---|---|
| 41 Flatbush Owner | 109 | 07/08/2026 |
| Quinlan Development Group | 44 | 10/13/2026 |
| Storage USA | 10 | 03/21/2026 |
| Extra Space Storage | 7 | 03/21/2026 |
| Brooklyn French Bakers | 6 | 04/12/2026 |
| NYC School Construction Authority | 6 | 03/21/2026 |
| Susa Partnership | 4 | 03/21/2026 |
| Jay Suites | 3 | 04/09/2026 |
| USA 175 Toyota Plaza | 3 | 03/21/2026 |
| The UPS Store | 2 | 03/21/2026 |
| Safe Horizon | 2 | 03/21/2026 |
| Guitar Center | 1 | 03/21/2026 |
| NYC Department of Education | 1 | 03/21/2026 |
| School Food NYC | 1 | 03/21/2026 |
| USA | 1 | 03/21/2026 |
| Susa Partnership L P Construction | 1 | 03/21/2026 |
| NYC Department of Design and Construction | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 03/02/2015 | $90.0M | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| Cany Architecture & Engineering | 3 | 09/17/2026 |
| Levin Engineering | 1 | 03/25/2026 |
| Tes Engineering | 4 | 01/28/2026 |
| Don M. Dacumos | 2 | 01/20/2026 |
| CFS Engineering | 25 | 12/18/2025 |
| TPG Architecture | 9 | 12/18/2025 |
| Rise Architecture | 1 | 11/18/2025 |
| Brent M. Porter, Architect, and Associates | 2 | 11/07/2025 |
| Eab Architectural Designs | 3 | 08/18/2025 |
| Lombardo Professional Engineering | 5 | 06/17/2025 |
| Paul Perdek, Prof. Engineering | 6 | 04/14/2025 |
| Ancora Engineering | 1 | 06/11/2024 |
| Ashraf | 2 | 05/18/2023 |
| Leon Skvirsky PE | 2 | 06/16/2022 |
| MPS Engineering | 1 | 04/07/2022 |
| RLG Consultating Engineers | 1 | 02/10/2022 |
| AKF Engineers | 3 | 11/30/2021 |
| Chicago Design Network | 1 | 10/05/2021 |
| Kristian Gregerson | 1 | 04/16/2021 |
| Norman C. Lok, PE | 2 | 07/18/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Par Plumbing Group | 12 | 03/21/2026 |
| Perotto Consulting Management | 10 | 03/21/2026 |
| Rigid Structural Design | 2 | 03/21/2026 |
| Milrose Consultants | 8 | 03/21/2026 |
| Domani Consulting | 60 | 03/21/2026 |
| AE Design Solution | 12 | 03/21/2026 |
| Desarno Associates | 4 | 03/21/2026 |
| Building Brothers | 4 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| Lombardo Building Consultants | 5 | 03/21/2026 |
| Jack Jaffa & Associates | 1 | 03/21/2026 |
| Second Floor Studios | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Nucor Construction | General Contractor | 24 | 07/08/2026 |
| Nova Construction Service | Scaffold | 17 | 07/08/2026 |
| Whitestone Plumbing | Plumbing | 11 | 07/08/2026 |
| Sajo | General Contractor | 6 | 07/08/2026 |
| William C. Gerakaris P&H | Plumbing | 5 | 07/08/2026 |
| LTM Construction | General Contractor | 5 | 07/08/2026 |
| PSI Partners | Fire Protection | 5 | 07/08/2026 |
| Intersystem Installation | Scaffold | 4 | 07/08/2026 |
| Nova Construction Service | General Contractor | 4 | 07/08/2026 |
| Metro Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Intersystems Installation S&S | Scaffold | 3 | 03/21/2026 |
| Klair Construction NY | General Contractor | 3 | 04/09/2026 |
| A&M Warshaw Services | Fire Protection | 3 | 07/08/2026 |
| Ronan Electrical | Electrical | 3 | 03/22/2026 |
| Par Fire Protection | Fire Protection | 2 | 07/08/2026 |
| JRM Construction Management | General Contractor | 2 | 07/08/2026 |
| Z-Car-D | Sign hanger | 2 | 07/08/2026 |
| Jam Electrical | Electrical | 2 | 03/21/2026 |
| Denmar Electric | Electrical | 1 | 03/22/2026 |
| Saga Construction Co | General Contractor | 1 | 04/09/2026 |
| C.M. Richey Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Pulsar Electric | Electrical | 1 | 03/21/2026 |
| Paul Signs | Sign hanger | 1 | 07/08/2026 |
| A&A Plumbing | Plumbing | 1 | 07/08/2026 |
| DV Plumbing | Plumbing | 1 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 1 | 07/08/2026 |
| Pasquale Quaratino | Plumbing | 1 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Watermark Plumbing | Plumbing | 1 | 07/08/2026 |
| Whitestone Plumbing | Fire Protection | 1 | 07/08/2026 |
| A & S Electric | Electrical | 1 | 03/21/2026 |
| E.N.E.L. Electrical | Electrical | 1 | 03/21/2026 |
| Freedom Electl & Data | Electrical | 1 | 03/22/2026 |
| Jorob Contracting & Electrical Co | Electrical | 1 | 03/22/2026 |
| Soleire Electrical Soltns | Electrical | 1 | 03/22/2026 |
| Rockmor Electric Enterprises | Electrical | 1 | 03/21/2026 |
| A.J. Electric | Electrical | 1 | 03/21/2026 |
| 2323 Development | General Contractor | 1 | 04/09/2026 |
| Anvien Construction | General Contractor | 1 | 04/09/2026 |
| Best Demo | General Contractor | 1 | 07/08/2026 |
| Barbaro Electric Co | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Domani Inspection Service | 843 | 35 | 09/17/2026 |
| Socotec Engineering | 4983 | 2 | 03/25/2026 |
| Citiscape Consulting | 762 | 1 | 11/18/2025 |
| Brent M. Porter, Architects | 4140 | 1 | 11/07/2025 |
| Lombardo Prof Engineering | 8566 | 5 | 06/17/2025 |
| Future Tech Consultants O | 589 | 3 | 04/07/2022 |
| AKF Engineers | 2751 | 4 | 11/30/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Nova Construction Service | 05/29/2026 |
| DOB NOW | Plumbing | Signed-off | Watermark Plumbing | 04/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 03/26/2026 |
| DOB NOW | General Construction | Permit Issued | Anvien Construction | 02/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 02/03/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 01/30/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 01/26/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Nova Restoration | 01/26/2026 |
| DOB NOW | Supported Scaffold | Signed-off | Nova Construction Service | 01/26/2026 |
| DOB NOW | Sprinklers | Signed-off | Whitestone Plumbing | 12/26/2025 |
| DOB NOW | Plumbing | Signed-off | Whitestone Plumbing | 12/26/2025 |
| DOB NOW | General Construction | Signed-off | LTM Construction | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | Nova Construction Service | 12/19/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Nova Construction Service | 12/19/2025 |
| DOB NOW | General Construction | Permit Issued | Saga Construction Co | 12/18/2025 |
| DOB NOW | General Construction | Signed-off | 2323 Development | 12/17/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 09/18/2025 |
| DOB NOW | Plumbing | Signed-off | Whitestone Plumbing | 09/16/2025 |
| DOB NOW | General Construction | Signed-off | LTM Construction | 09/15/2025 |
| DOB NOW | General Construction | Signed-off | Klair Construction NY | 08/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Klair Construction NY | 08/26/2025 |
| DOB NOW | Sprinklers | Signed-off | Temperini Mechanical | 07/01/2025 |
| DOB NOW | Plumbing | Signed-off | Whitestone Plumbing | 07/01/2025 |
| DOB NOW | General Construction | Signed-off | LTM Construction | 06/26/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Nova Construction Service | 01/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 01/28/2025 |
| DOB NOW | General Construction | Permit Issued | Nova Construction Service | 01/28/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Nova Restoration | 01/28/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Nova Construction Service | 01/28/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 09/30/2024 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 08/22/2024 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 08/21/2024 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 08/21/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Nucor Construction | 08/12/2024 |
| DOB NOW | Plumbing | Signed-off | William C. Gerakaris P&H | 08/09/2024 |
| DOB NOW | Plumbing | Signed-off | William C. Gerakaris P&H | 08/09/2024 |
| DOB NOW | General Construction | Signed-off | Nucor Construction | 08/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Nucor Construction | 08/09/2024 |
| DOB NOW | Structural | Signed-off | Nucor Construction | 08/09/2024 |
| DOB NOW | Plumbing | Signed-off | William C. Gerakaris P&H | 08/09/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/28/2026 | Permit Issued | JRM Construction Management | Air Conditioning Systems | Cooling Trane Trane VCEF VAV Box 175 CFM · Vav Box ×1 |
| 07/24/2025 | Signed-off | Klair Construction NY | Air Conditioning Systems, Ventilation Systems | Cooling Waterfurnace MCR060AKC30C0PS 53,460 BTU · Wshp ×1 Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2026 | Permit Issued | Sirina Fire Protection | 2 heads |
| 01/28/2026 | — | — | Sprinkler System |
| 12/18/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/18/2025 | Signed-off | Whitestone Plumbing | Water/Sanitary |
| 11/07/2025 | Signed-off | Watermark Plumbing | Water/Sanitary |
| 01/13/2022 | Signed-off | Pasquale Quaratino | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/13/2026 | Complete | Ascuatech Electrical | General Wiring |
| 03/02/2026 | Permit Issued | Rockmor Electric Enterprises | General Wiring |
| 12/30/2025 | Permit Issued | Power Surge Electric | General Wiring |
| 09/07/2025 | Permit Issued | Blu Electrical Services | General Wiring |
| 07/03/2025 | Permit Issued | Power Surge Electric | General Wiring |
| 05/19/2025 | Complete | Ronan Electrical | General Wiring |
| 04/09/2025 | Complete | Top Notch Electric | General Wiring |
| 03/11/2024 | Complete | Top Notch Electric | General Wiring |
| 02/08/2024 | Permit Issued | Top Shelf Electric | — |
| 06/05/2023 | Complete | Crosswire Electrical | General Wiring |
| 05/15/2023 | Complete | AUR0RA Electrical Contg | — |
| 10/20/2022 | Permit Issued | Denmar Electric | General Wiring |
| 08/19/2022 | Complete | Steven Farkas | — |
| 02/25/2022 | Cancelled | Stanco System Electrical Cont | — |
| 11/23/2021 | Complete | Ziggy's Electrical Contng | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2026 | Permit Issued | Nova Construction Service | Steel, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/14/2025 | Permit Issued | Nova Construction Service | Sidewalk Shed |
| 09/26/2024 | Signed-off | Nova Construction Service | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2025 | Signed-off | Nova Restoration | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/09/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/25/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/12/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 08/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/06/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/06/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/03/2026 | Masonry | JOHN MCMONAGLE | special |
| 08/27/2026 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 08/27/2026 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 08/27/2026 | Final | JOHN MCMONAGLE | progress |
| 08/14/2026 | Structural Stability – Alterations of existing buildings | JOHN MCMONAGLE | special |
| 08/14/2026 | Final | JOHN MCMONAGLE | progress |
| 08/14/2026 | Masonry | JOHN MCMONAGLE | special |
| 08/14/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 02/24/2026 | Sprinkler Systems | MARISA HARTE | special |
| 01/15/2026 | Interior lighting power | MARISA HARTE | energy_progress |
| 12/03/2025 | Mechanical Systems | MARISA HARTE | special |
| 12/03/2025 | Final | MARISA HARTE | progress |
| 12/02/2025 | Final | DON DACUMOS | progress |
| 11/21/2025 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 11/21/2025 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 11/21/2025 | Final | JOHN MCMONAGLE | progress |
| 11/21/2025 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 11/21/2025 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 11/21/2025 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 11/17/2025 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 08/21/2025 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 08/21/2025 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 08/21/2025 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 08/19/2025 | Final | JOHN MCMONAGLE | progress |
| 08/15/2025 | Final | JOHN MCMONAGLE | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Apple | Retail | Floor 1 | Project B01363973 Project B01327521 Project B00711358 Project B00622970 Project B00625414 Project B00625500 Project B00625515 Project B00622943 |
| Jay Suites | Office | Floors 1, 2 | Project B01317295 |
| Brooklyn French Bakers | Restaurant / Food Service | Floor 1 | Project B01305871 Project B01306116 Project B01272548 |
| Arca | Office | Floor 5 | Project B01078128 |
| Shady Grove Fertility Brooklyn | Medical / Healthcare | Floor 4 | Project B00490265 Project B00490293 Project B00490333 |
| Energy Hub | Office | Floor 4 | Project B00246937 Project B00247052 |
| Blick | Retail | Floors 1–5 | Project B00059138 Project B00059151 |
| The UPS Store | Retail | Floor 1 | Project B00049384 |