← Back
BuildNYC
Two family converted from one family
41 JORALEMON STREET
BROOKLYN · Brooklyn Heights · BIN 3002166
💬 Discuss this project
1845Year Built
3Stories
B3Building Class
R6Zoning
3,192 sfGross Floor Area
2Units
0 Active Violations
Two family converted from one family · 1,596 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction48p · 5 filings · 20 docs
Floor 3Under Construction43p · 5 filings · 20 docs
Floor 2Under Construction45p · 5 filings · 20 docs
Floor 1Temporary construction fenceUnder Construction42p · 6 filings · 20 docs
CellarFoundation workUnder Construction56p · 7 filings · 20 docs
BasementUnder Construction6p · 2 filings · 20 docs
Sub-BasementUnder Construction35p · 4 filings · 20 docs
Site & exteriorPipe scaffolding installation28p · 2 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Geiger E A Group1003/21/2026
J Callahan Consulting2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steering House ConstructionGeneral Contractor1710/04/2026
MC SuperstructureScaffold306/28/2026
Steering House ConstructionScaffold207/08/2026
Dynamic Blue Water MechanicalPlumbing211/07/2026
FirequestFire Protection206/28/2026
Nash Electric ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
The Brooklyn Studio of AR2684706/24/2026
D'Antonio Consulting Engineering931305/21/2026
Christian L. Martos Engineering5965606/10/2025
Building Lifecycle
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brendan Coburn
06/25/2026
Permit renewed — Foundation
Renewed without changes
B01101157-I1-FO
06/24/2026
Filed — Alteration
This Alteration application is being filed in conjunction with Alt CO application #B01101087-I1 for the plumbing work at the subject premises. There are no change in use, egress or occupancy under this application.
B01101130-P2
06/24/2026
Permit expired, never signed off — Protection and Mechanical Methods
The city's record still shows this permit as issued, with no sign-off on its filing
B01197357-I1-PMM
06/23/2026
Permit renewed — Sprinklers
Renewed without changes
B01101160-I1-EW-SP
94 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedSteering House Construction06/25/2026
DOB NOWSprinklersSigned-offFirequest06/23/2026
DOB NOWGeneral ConstructionPermit IssuedSteering House Construction05/19/2026
DOB NOWStructuralPermit IssuedSteering House Construction05/08/2026
DOB NOWPlumbingPermit IssuedDynamic Blue Water Mechanical04/07/2026
DOB NOWStructuralPermit IssuedSteering House Construction03/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMC Superstructure06/24/2025
DOB NOWSidewalk ShedPermit IssuedMC Superstructure06/23/2025
DOB NOWSupported ScaffoldPermit IssuedMC Superstructure06/23/2025
DOB NOWSprinklersSigned-offFirequest06/18/2025
DOB NOWFoundationPermit IssuedSteering House Construction06/17/2025
DOB NOWSupport of ExcavationSigned-offSteering House Construction06/17/2025
DOB NOWConstruction FencePermit IssuedSteering House Construction06/17/2025
DOB NOWMechanical SystemsPermit IssuedSteering House Construction06/12/2025
DOB NOWGeneral ConstructionPermit IssuedSteering House Construction05/12/2025
DOB NOWFoundationPermit IssuedSteering House Construction03/21/2025
DOB NOWGeneral ConstructionPermit IssuedSteering House Construction03/20/2025
DOB NOWConstruction FencePermit IssuedSteering House Construction03/19/2025
DOB NOWMechanical SystemsPermit IssuedSteering House Construction03/17/2025
DOB NOWSupport of ExcavationSigned-offSteering House Construction03/14/2025
BISEQISSUEDPheonix 132 Sutton Street08/27/2010
BISPLISSUEDG.A. Plumbing, Heating, Sprinkler06/21/2002
BIS—ISSUEDKamal Construction06/12/2002
1 project · most recent 12/03/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
12/03/2024Permit IssuedSteering House ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026Signed-offFirequest—
1 project · most recent 06/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/24/2026Permit IssuedDynamic Blue Water MechanicalGas, Storm, Water/Sanitary
2 projects · most recent 08/14/2025
General Wiring
FiledStatusContractorScope
08/14/2025Permit IssuedFSM ElectricalGeneral Wiring
06/24/2025Permit IssuedNash Electric Services—
1 project · most recent 12/12/2024
FiledStatusContractorScope
12/12/2024Permit IssuedSteering House Construction—
2 projects · most recent 04/06/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
04/06/2026Permit IssuedMC SuperstructureScaffold, Sidewalk Shed
03/17/2025Permit IssuedSteering House ConstructionFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
06/29/2026Fire-Resistant Penetrations and JointsBrendan Coburnspecial
06/03/2026Fire-Resistant Penetrations and JointsBrendan Coburnspecial
06/02/2026Fire-Resistant Penetrations and JointsBrendan Coburnspecial
06/02/2026Sprinkler SystemsGAETANO D'ANTONIOspecial
05/20/2026Fire-Resistant Penetrations and JointsBrendan Coburnspecial
05/20/2026Sprinkler SystemsGAETANO D'ANTONIOspecial
06/18/2025Subgrade InspectionsChristian Martosspecial
06/18/2025Construction Operations Influencing Adjacent StructuresChristian Martosspecial
06/18/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
06/11/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
06/11/2025Structural Steel - DetailsChristian Martosspecial
06/11/2025MasonryChristian Martosspecial
06/11/2025Construction Utilizing CLT or SCL, Type IVChristian Martosspecial
06/11/2025FinalChristian Martosprogress
06/11/2025Structural Wood FrameChristian Martosprogress
06/11/2025Concrete - Cast-In-PlaceChristian Martosspecial
06/11/2025Structural Steel - WeldingChristian Martosspecial
06/11/2025Structural Steel - High Strength BoltingChristian Martosspecial
06/11/2025Construction Operations Influencing Adjacent StructuresChristian Martosspecial
06/11/2025Post-installed AnchorsChristian Martosspecial
06/11/2025Structural Cold-Formed SteelChristian Martosspecial
06/05/2025Subgrade InspectionsChristian Martosspecial
06/05/2025Concrete - Cast-In-PlaceChristian Martosspecial
06/05/2025Construction Operations Influencing Adjacent StructuresChristian Martosspecial
06/05/2025Construction Utilizing CLT or SCL, Type IVChristian Martosspecial
Latest 25 of 63.
111 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account