← Back
BuildNYC
Three families
41 MANOR COURT
STATEN ISLAND · BIN 5124395
💬 Discuss this project
1990Year Built
2Stories
C0Building Class
R1-2Zoning
2,832 sfGross Floor Area
3Units
14 Active Violations ▸FDNY Report ↗
Three families · Owner of record: Lighthouse Manor 41 · 10,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 11 docs
Floor 341 Manor Court fire sprinkler system20p · 3 filings · 20 docs
Floor 241 Manor Court fire sprinkler system19p · 3 filings · 20 docs
Floor 141 Manor Court fire sprinkler system21p · 3 filings · 20 docs
Cellar41 Manor Court fire sprinkler system18p · 3 filings · 20 docs
Site & exterior27p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Homesell203/21/2026
Eagleye Contracting203/21/2026
Lighthouse Manor 41103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC101/15/2025
Willy C. Yuin511/12/2024
Badaly Engineering404/10/2023
DTLS Architecture103/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sanark Consulting Engineering503/21/2026
Badaly Engineering203/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aurora General ConstructionScaffold903/21/2026
Aurora General ConstructionGeneral Contractor603/21/2026
Nicolosi BrothersGeneral Contractor103/21/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738210/04/2024
Badaly Architect71372—
Building Lifecycle
06/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/21/2026
Failure to maintain building in code-compliant manner: atoi, observed a white tesla sedan car jumped curb and illegally parked on front yard grass…
ECB violation · open
05/21/2026
Violation of parking regulations in a residential district: atoi, observed front yard lawn (corner of exposures 1 and 2) being used for dead…
ECB violation · open
05/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
99 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating10/29/2024
DOB NOWConstruction FencePermit IssuedAurora General Construction08/20/2024
DOB NOWGeneral ConstructionPermit IssuedAurora General Construction08/13/2024
DOB NOWGeneral ConstructionPermit IssuedAurora General Construction06/14/2023
DOB NOWConstruction FencePermit IssuedAurora General Construction06/09/2023
DOB NOWConstruction FencePermit IssuedAurora General Construction04/26/2023
BISOTISSUEDNicolosi Brothers01/04/2021
1 project
FiledStatusContractorScope
————
1 project · most recent 11/12/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/12/2024Permit IssuedA&H Express Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 11/12/2024
Steel Concrete Wood
FiledStatusContractorScope
11/12/2024Permit IssuedA&H Express Plumbing & HeatingSteel, Concrete, Wood
1 project · most recent 04/10/2023
Fence
FiledStatusContractorScope
04/10/2023Permit IssuedAurora General ConstructionFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2024Pass-Final Construction Permit WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
11/13/2024Permanent certificateanthony santoroenergy_progress
11/13/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/13/2024Maintenance informationanthony santoroenergy_progress
11/13/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/13/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/13/2024Energy Code Compliance Inspectionsanthony santoroprogress
11/12/2024Permanent certificateanthony santoroenergy_progress
11/12/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/12/2024Maintenance informationanthony santoroenergy_progress
11/12/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/12/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/12/2024Energy Code Compliance Inspectionsanthony santoroprogress
10/11/2024Structural Steel - Detailsanthony santorospecial
10/11/2024Masonryanthony santorospecial
10/11/2024Subgrade Inspectionsanthony santorospecial
10/11/2024Structural Cold-Formed Steelanthony santorospecial
10/11/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
10/11/2024Structural Steel - High Strength Boltinganthony santorospecial
10/11/2024Structural Wood Frameanthony santoroprogress
10/11/2024Fire-Resistance Rated Constructionanthony santoroprogress
10/11/2024Finalanthony santoroprogress
10/11/2024Preliminaryanthony santoroprogress
10/11/2024Energy Code Compliance Inspectionsanthony santoroprogress
10/11/2024Air barrier - visual inspectionanthony santoroenergy_progress
10/11/2024Permanent certificateanthony santoroenergy_progress
Latest 25 of 80.
93 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account