← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4466812
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Floor 217p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Basement1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.2907/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
AC BUILDING CONSULTANTS1003/21/2026
DAY72 BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKFISH CUSTOM BUILDERSGeneral Contractor807/08/2026
MALBRO CONST SERVICES INCGeneral Contractor303/21/2026
G.E.O. ELECTRIC CORPElectrical103/22/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CMC DESIGN ARCHITECT, P.C2984410/11/2025
PARKER AND WEST ENGINEERI5272210/06/2025
Building Lifecycle
All (84)Filed (8)Permit Issued (7)Signed Off (3)Inspection (8)Objection (28)Special Inspection (30)
01/23/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01256906-I1
01/14/2026
Signed off — New Building
New 2 story 1 family home.
Q00872159-S1
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/19/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/09/2025
Special inspection requirement — Subgrade Inspections
Gary Lenhart
11/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
11/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Gary Lenhart
11/09/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Gary Lenhart
11/09/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Gary Lenhart
11/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
11/09/2025
Special inspection requirement — Lowest Floor Elevation
Gary Lenhart
11/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
11/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Gary Lenhart
11/09/2025
Special inspection requirement — Footing and Foundation
Gary Lenhart
11/09/2025
Special inspection requirement — Final
Gary Lenhart
11/09/2025
Special inspection requirement — Permanent certificate
Gary Lenhart
11/09/2025
Special inspection requirement — Interior lighting power
Gary Lenhart
11/09/2025
Special inspection requirement — Fenestration areas
Gary Lenhart
11/09/2025
Special inspection requirement — Insulation placement and R values
Gary Lenhart
11/09/2025
Special inspection requirement — Metering
Gary Lenhart
11/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Gary Lenhart
11/09/2025
Special inspection requirement — Fenestration air leakage
Gary Lenhart
11/09/2025
Special inspection requirement — Air barrier — testing
Gary Lenhart
11/09/2025
Special inspection requirement — Air barrier - visual inspection
Gary Lenhart
11/09/2025
Special inspection requirement — Maintenance information
Gary Lenhart
10/11/2025
Filed — New Building
New 2 story 1 family home.
Q00872159-P2
10/06/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01256906-P1
10/06/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/06/2025
Special inspection requirement — Final
Walid Abdulla
10/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/06/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
10/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/30/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/23/2025
Permit issued — Solar
Q01256906-I1-SL
07/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01256906-I1
11/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Filed — New Building
New 2 story 1 family home.
Q00872159-P1
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/05/2024
Permit issued — Plumbing
Q00872159-S2-PL
12/14/2023
Signed off — Full Demolition
Hand demolition of 1 story, 1 family home.
Q00952587-I1
11/24/2023
Permit issued — Full Demolition
Q00952587-I1-FD
11/24/2023
Permit issued — Earth Work
Q00872159-I1-FO
11/22/2023
Permit issued — General Construction
Q00872159-I1-EA
11/22/2023
Permit issued — Foundation
Q00872159-I1-GC
11/15/2023
Objection raised — Other
11/15/2023
Objection resolved — Addressed
11/02/2023
Filed — Full Demolition
Hand demolition of 1 story, 1 family home.
Q00952587-I1
10/16/2023
Permit issued — Construction Fence
Q00872159-S1-FN
10/04/2023
Objection raised — Other
10/04/2023
Objection resolved — Addressed
09/27/2023
Objection resolved — Addressed
09/27/2023
Objection resolved — Addressed
09/18/2023
Objection raised — Mechanical
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/23/2025
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC02/05/2024
DOB NOWFull DemolitionSigned-offMALBRO CONST SERVICES INC11/24/2023
DOB NOWEarth WorkPermit IssuedROCKFISH CUSTOM BUILDERS11/24/2023
DOB NOWGeneral ConstructionPermit IssuedROCKFISH CUSTOM BUILDERS11/22/2023
DOB NOWFoundationPermit IssuedROCKFISH CUSTOM BUILDERS11/22/2023
DOB NOWConstruction FenceSigned-offROCKFISH CUSTOM BUILDERS10/16/2023
1 project · most recent 10/11/2025
Sprinkler System
FiledStatusContractorScope
10/11/2025——Sprinkler System
1 project · most recent 10/11/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/11/2025Signed-offJOSEPH O'GRADY P & H INCGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 07/17/2025
General Wiring
FiledStatusContractorScope
07/17/2025CompleteSUNRUN SOLAR ELECTL CORP—
01/13/2024CompleteG.E.O. ELECTRIC CORPGeneral Wiring
1 project · most recent 10/11/2025
FiledStatusContractorScope
10/11/2025Signed-offJOSEPH O'GRADY P & H INC2 scope_items
1 project · most recent 10/11/2025
Fence
FiledStatusContractorScope
10/11/2025Signed-offJOSEPH O'GRADY P & H INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/19/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/09/2025Subgrade InspectionsGary Lenhartspecial
11/09/2025Fire-Resistant Penetrations and JointsGary Lenhartspecial
11/09/2025Concrete - Cast-In-PlaceGary Lenhartspecial
11/09/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Gary Lenhartspecial
11/09/2025Wood – Prefabricated I-JoistsGary Lenhartspecial
11/09/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
11/09/2025Lowest Floor ElevationGary Lenhartprogress
11/09/2025Energy Code Compliance InspectionsGary Lenhartprogress
11/09/2025Fire-Resistance Rated ConstructionGary Lenhartprogress
11/09/2025Footing and FoundationGary Lenhartprogress
11/09/2025FinalGary Lenhartprogress
11/09/2025Permanent certificateGary Lenhartenergy_progress
11/09/2025Interior lighting powerGary Lenhartenergy_progress
11/09/2025Fenestration areasGary Lenhartenergy_progress
11/09/2025Insulation placement and R valuesGary Lenhartenergy_progress
11/09/2025MeteringGary Lenhartenergy_progress
11/09/2025Fenestration and door U-factor and product ratingsGary Lenhartenergy_progress
11/09/2025Fenestration air leakageGary Lenhartenergy_progress
11/09/2025Air barrier — testing Gary Lenhartenergy_progress
11/09/2025Air barrier - visual inspectionGary Lenhartenergy_progress
11/09/2025Maintenance informationGary Lenhartenergy_progress
10/06/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/06/2025FinalWalid Abdullaprogress
10/06/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/06/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
Latest 25 of 38.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00872159-S1Request digital key ↗
08/24/2026Q00872159-S2Request digital key ↗
08/24/2026Q00872159-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/24/2026Q00872159-I1Open ↗
08/13/2026Q00872159-P2Open ↗
▸Seals & Professional Certifications30
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026Q00872159-I1Open ↗
08/31/2026Q00872159-I1Open ↗
08/31/2026Q00872159-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026Q00872159-I1Open ↗
08/31/2026Q00872159-I1Open ↗
08/31/2026Q00872159-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00872159-I1Open ↗
08/24/2026Q00872159-S2Open ↗
08/13/2026Q00952587-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWGas Cut-Off1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00952587-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00952587-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/24/2026Q00872159-I1Open ↗
08/13/2026Q00872159-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00872159-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01256906-I1Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00872159-I1Open ↗
08/13/2026Q00952587-I1Open ↗
08/13/2026Q00872159-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026Q00872159-I1Open ↗
08/13/2026Q00872159-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/24/2026Q00872159-I1Open ↗
08/13/2026Q00872159-P2Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00952587-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00952587-I1Open ↗