← Back
Office with commercial, 7-19 stories
Cuban Artists Fund
41 UNION SQUARE · BIN 1016089
💬 Discuss this project
1920Year Built
16Stories
O6Building Class
M1-5MZoning
74,521 sfGross Floor Area
201Units
LL97 Covered4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: HARTFORD PROPERTIES 41 LLC · 9,325 sf lot · 7.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 9 filings · 20 docs
Floor 15Under Construction1p · 1 filing · 4 docs
Floor 14
Floor 13
Floor 12
Floor 11Under Construction11p · 2 filings · 10 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction28p · 5 filings · 20 docs
Cellar8p · 3 filings · 16 docs
Sub-Basement11p · 3 filings · 20 docs
2 jobs · most recent 05/01/2025
Ventilation Systems
FiledStatusContractorScope
05/01/2025Permit IssuedC PLUS DESIGN GROUP INCVentilation Systems
02/15/2023——Ventilation Systems
1 job · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026Permit IssuedCMA PLUMBING & HEATING IN64 heads
2 jobs · most recent 04/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/24/2026Permit IssuedINNOVATIVE HEATING SOLUTIGas, Water/Sanitary
09/20/2022Permit IssuedI.M.P. PLBG. & HTG. CORPGas
12 jobs · most recent 12/16/2025
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
12/16/2025CompleteALL PRO ELEC. OF N.Y. INC—
12/16/2025CompleteALL PRO ELEC. OF N.Y. INC—
11/15/2025Permit IssuedJER ELECTRIC CORPGeneral Wiring, Lighting
04/14/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
11/06/2024CompleteRICHARD NEU—
09/11/2024Permit IssuedALLIANCE ELEVATOR COMPANY—
08/30/2021Permit IssuedJER ELECTRIC CORPGeneral Wiring, Lighting
04/22/2021CompleteD&D ELECTL CONST CO INCGeneral Wiring
01/12/2021Permit IssuedJER ELECTRIC CORPLighting
11/09/2020Permit IssuedABILENE ELECTRIC INCBoiler Controls
05/30/2019Permit IssuedV. VASS ELECTRIC CORP—
01/31/2019CompleteJER ELECTRIC CORPGeneral Wiring, Lighting
1 job · most recent 06/30/2026
Steel Concrete
FiledStatusContractorScope
06/30/2026Signed-offINTERSERV LPSteel, Concrete
2 jobs · most recent 11/13/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/13/2025Permit IssuedCOLGATE RESTORATION CORPScaffold, Sidewalk Shed
04/02/2025Permit IssuedCOLGATE RESTORATION CORPScaffold, Sidewalk Shed
1 job · most recent 11/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/03/2025Permit IssuedCOLGATE RESTORATION CORPSuspended Scaffold (SC)
Building Lifecycle
All (239)Filed (49)Permit Issued (55)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (12)Objection (6)Special Inspection (30)
09/16/2026
Permit issued — Protection and Mechanical Methods
M01098383-I1-PMM
08/27/2026
Permit issued — Sidewalk Shed
M01306262-I1-SH
08/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/10/2026
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "VOODOO DONUTS"
M01302324-I1
07/10/2026
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "VOODOO DONUTS"
M01302328-I1
06/30/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR INTERIOR RENOVATIONS & EXTERIOR STOREFRONT RENOVATIONS FOR 1ST FLOOR SPACE "VOODOO DOUGHNUTS" AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01276222-P3
06/30/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
06/26/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR INTERIOR RENOVATIONS & EXTERIOR STOREFRONT RENOVATIONS FOR 1ST FLOOR SPACE "VOODOO DOUGHNUTS" AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01276222-P2
06/26/2026
Special inspection requirement — Sprayed fire-resistant materials
ERIC BERLENT
06/26/2026
Special inspection requirement — Exterior lighting power
ERIC BERLENT
06/26/2026
Special inspection requirement — Fenestration air leakage
ERIC BERLENT
06/26/2026
Special inspection requirement — Lighting controls
ERIC BERLENT
06/26/2026
Special inspection requirement — Fenestration areas
ERIC BERLENT
06/26/2026
Special inspection requirement — Insulation placement and R values
ERIC BERLENT
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
06/26/2026
Special inspection requirement — Interior lighting power
ERIC BERLENT
06/26/2026
Special inspection requirement — Air barrier - visual inspection
ERIC BERLENT
06/26/2026
Special inspection requirement — Final
ERIC BERLENT
06/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
06/26/2026
Special inspection requirement — Vestibules
ERIC BERLENT
06/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ERIC BERLENT
06/11/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/10/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
06/08/2026
Special inspection requirement — Sprayed fire-resistant materials
ERIC BERLENT
06/02/2026
Filed — Alteration
SPRINKLER WORK INCLUDING NEW AND RELOCATED SPRINKLER HEADS ON EXISTING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287114-P1
06/01/2026
Permit issued — Sidewalk Shed
M01306262-I1-SH
06/01/2026
Permit issued — Suspended Scaffold
M01099966-I1-SC
05/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/19/2026
Signed off — Alteration
M01342848-I1
05/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Filed — Alteration
REMOVAL OF PLUMBING FIXTURES & ASSOCIATED PIPING, INSTALLATION OF PLUMBING FIXTURES, GAS FIXTURES & EQUIPMENT, NON-GAS WATER HEATER, SUMP PUMP, ASSOCIATED PIPING, VALVES & GAS METER ON PART OF 1st FLOOR & BASEMENT
M01287104-P1
04/20/2026
Permit issued — Supported Scaffold
M01201580-I1-SF
04/16/2026
Permit issued — Structural
M01276222-S1-ST
04/10/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR INTERIOR RENOVATIONS & EXTERIOR STOREFRONT RENOVATIONS FOR 1ST FLOOR SPACE "VOODOO DOUGHNUTS" AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01276222-S1
03/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/11/2026
Permit issued — Supported Scaffold
M01306262-I1-SH
02/24/2026
Permit issued — Mechanical Systems
M01287098-I1-MS
02/10/2026
Permit issued — Sign
M01302324-I1-SG
02/10/2026
Permit issued — Sign
M01302328-I1-SG
02/09/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "VOODOO DONUTS"
M01302324-I1
02/09/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "VOODOO DONUTS"
M01302328-I1
02/06/2026
Permit issued — General Construction
M01309673-I1-GC
02/04/2026
Filed — Alteration
Replace Mansard Windows Within Existing Framed Openings on Partial 11th Floor, Install Exterior Metal Siding, Repair/Replace Damaged Terracotta Blocks, Interior Demolition & Finish Work & Erect Temporary Protection. No Change to Occupancy, Use or Egress
M01309673-I1
01/27/2026
Violation issued (ECB, closed)
Boilers
01/09/2026
Filed — Alteration
M01342848-I1
Latest 60 of 239 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRAUSE REALY INC23109/17/2026
LEMX607/08/2026
DESIGN WELL SPENT COMPANY907/08/2026
C PLUS DESIGN GROUP407/08/2026
HARTFORD PROPERTIES 411103/22/2026
SR CC CORP103/22/2026
HARTFORD PROP INC303/22/2026
OWNER OF 41 UNION SQ103/22/2026
HARTFORD PROPERTIES1403/21/2026
HARTFORD CO C/O BRAUSE REALTY1703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE RESTORATION CORPGeneral Contractor2509/17/2026
I.M.P. PLBG. & HTG. CORPPlumbing807/08/2026
CMA PLUMBING & HEATING INFire Protection407/08/2026
LEMX CORPGeneral Contractor407/08/2026
ROBERT COVELLOElectrical303/21/2026
INTERSERV LPGeneral Contractor307/02/2026
THOMAS JOCELYN IIIElectrical303/21/2026
HENICK-LANE SERVICE CORPGeneral Contractor303/21/2026
A1 SPECIALIZED, INCScaffold207/08/2026
ETNA CONTRACTING INCGeneral Contractor203/21/2026
MOREAIR MECHANICAL SERVICGeneral Contractor107/08/2026
PRESTIGIOUS MAINTENANCE IGeneral Contractor104/09/2026
REMI INTERIORS INCGeneral Contractor107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/09/2026
INNOVATIVE HEATING SOLUTIPlumbing107/08/2026
C PLUS DESIGN GROUP INCGeneral Contractor107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
JAVIER VALERA ACEROElectrical103/21/2026
JER ELECTRIC CORPElectrical103/22/2026
JOHN CORBETTElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
ATLAS PRO CONSTRUCTIONGeneral Contractor107/08/2026
ALL PRO ELEC. OF N.Y. INCElectrical103/22/2026
I.M.P. PLG & HTG CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803206/30/2026
CATALPA SPECIAL INSPECTIO2004706/26/2026
MEP INSPECTIONS, INC1102206/02/2026
ASSURE PROFESSIONAL ENGIN6962102/04/2026
JOSEPH MARTINES PE, PLLC14281509/26/2025
JACK GREEN ASSOCIATES422506/19/2025
JKM ARCHITECTURE P.C.8906105/01/2025
LEO Y LEE ASSOCIATES2481110/22/2024
NEW YORK ENGINEERING ASSO851209/20/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE RESTORATION CORP09/16/2026
DOB NOWSidewalk ShedPermit IssuedCOLGATE RESTORATION CORP08/27/2026
DOB NOWSidewalk ShedPermit IssuedCOLGATE RESTORATION CORP06/01/2026
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP06/01/2026
DOB NOWSupported ScaffoldPermit IssuedCOLGATE RESTORATION CORP04/20/2026
DOB NOWStructuralSigned-offINTERSERV LP04/16/2026
DOB NOWSupported ScaffoldPermit IssuedCOLGATE RESTORATION CORP03/11/2026
DOB NOWMechanical SystemsPermit IssuedPRESTIGIOUS MAINTENANCE I02/24/2026
DOB NOWSignSigned-offMAD SIGNS INC02/10/2026
DOB NOWSignSigned-offMAD SIGNS INC02/10/2026
DOB NOWGeneral ConstructionPermit IssuedCOLGATE RESTORATION CORP02/06/2026
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedCOLGATE RESTORATION CORP01/06/2026
DOB NOWSprinklersPermit IssuedCMA PLUMBING & HEATING IN12/16/2025
DOB NOWPlumbingPermit IssuedMITIE PLUMBING & HTG CORP12/04/2025
DOB NOWGeneral ConstructionSigned-offINTERSERV11/14/2025
DOB NOWSidewalk ShedPermit IssuedCOLGATE RESTORATION CORP10/27/2025
DOB NOWSidewalk ShedPermit IssuedCOLGATE RESTORATION CORP10/27/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE RESTORATION CORP07/25/2025
DOB NOWMechanical SystemsSigned-offMOREAIR MECHANICAL SERVIC06/27/2025
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP05/20/2025
DOB NOWMechanical SystemsPermit IssuedC PLUS DESIGN GROUP INC05/05/2025
DOB NOWSidewalk ShedPermit IssuedCOLGATE RESTORATION CORP04/03/2025
DOB NOWSupported ScaffoldPermit IssuedCOLGATE RESTORATION CORP04/03/2025
DOB NOWGeneral ConstructionSigned-offCOLGATE RESTORATION CORP04/01/2025
DOB NOWSupported ScaffoldSigned-offLEMX CORP11/06/2024
DOB NOWSupported ScaffoldSigned-offLEMX CORP11/06/2024
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BUILDING RESTORAT11/04/2024
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP10/02/2024
DOB NOWStandpipePermit IssuedI.M.P. PLBG. & HTG. CORP10/01/2024
DOB NOWPlumbingPermit IssuedCMA PLUMBING & HEATING IN08/28/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE RESTORATION CORP08/21/2024
DOB NOWGeneral ConstructionSigned-offCOLGATE RESTORATION CORP07/29/2024
DOB NOWPlumbingSigned-offCMA PLUMBING & HEATING IN07/01/2024
DOB NOWGeneral ConstructionSigned-offHENICK-LANE SERVICE CORP06/26/2024
DOB NOWBoiler EquipmentSigned-offABILENE, INC10/02/2023
DOB NOWStructuralSigned-offCOLGATE RESTORATION CORP08/08/2023
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP08/04/2023
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN08/01/2023
DOB NOWStructuralSigned-offCOLGATE RESTORATION CORP06/22/2023
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/31/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/31/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/29/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 137
DateRequirementInspectorRole
06/30/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
06/30/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
06/30/2026Post-installed AnchorsSAMI HAJJAR P.Especial
06/30/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
06/30/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
06/30/2026FinalSAMI HAJJAR P.Eprogress
06/30/2026Structural Cold-Formed SteelSAMI HAJJAR P.Especial
06/26/2026Lighting controlsERIC BERLENTenergy_progress
06/26/2026Fenestration areasERIC BERLENTenergy_progress
06/26/2026Exterior lighting powerERIC BERLENTenergy_progress
06/26/2026Fenestration air leakageERIC BERLENTenergy_progress
06/26/2026Fenestration and door U-factor and product ratingsERIC BERLENTenergy_progress
06/26/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
06/26/2026Sprayed fire-resistant materialsERIC BERLENTspecial
06/26/2026Energy Code Compliance InspectionsERIC BERLENTprogress
06/26/2026Fire-Resistance Rated ConstructionERIC BERLENTprogress
06/26/2026FinalERIC BERLENTprogress
06/26/2026Air barrier - visual inspectionERIC BERLENTenergy_progress
06/26/2026Interior lighting powerERIC BERLENTenergy_progress
06/26/2026Insulation placement and R valuesERIC BERLENTenergy_progress
06/26/2026VestibulesERIC BERLENTenergy_progress
06/11/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
06/10/2026FinalSAMI HAJJAR P.Eprogress
06/10/2026Post-installed AnchorsSAMI HAJJAR P.Especial
06/10/2026Structural Cold-Formed SteelSAMI HAJJAR P.Especial
Latest 25 of 137.
▾Documents — 1,012 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch45
09/02/2026M00739090-I1Request digital key ↗
09/02/2026M00739090-P1Request digital key ↗
09/02/2026M00739090-P2Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/29/2026M00461224-P1Request digital key ↗
08/29/2026M00461224-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00175149-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00248226-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits191
▸BISPLAN / WORK APPROVAL APPLICATION99
11/13/2023123141420Open ↗
01/20/2023122281565Open ↗
01/19/2023122281565Open ↗
Showing 3 of 99 on file for this type
▸BISWORK PERMIT APPLICATION92
09/20/2022122110964Open ↗
09/20/2022122110964Open ↗
02/08/2022122281565Open ↗
Showing 3 of 92 on file for this type
▸Seals & Professional Certifications308
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
02/20/2020123840479Open ↗
11/22/2019123844475Open ↗
12/13/2018123475756Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature61
09/27/2026M01074610-P1Open ↗
09/27/2026M01074610-P1Open ↗
09/27/2026M01074610-P1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
09/28/2026M00175149-I1Open ↗
09/27/2026M01074610-P1Open ↗
09/27/2026M01074610-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/04/2026M00362842-I1Open ↗
09/02/2026M00739090-I1Open ↗
09/02/2026M00739090-P1Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
01/03/2023122281565Open ↗
06/16/2021121547718Open ↗
02/20/2020123840479Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
02/20/2020123840479Open ↗
11/22/2019123844475Open ↗
07/17/2018123475756Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment62
▸BISSCHEDULE B - PLUMBING17
01/19/2023122281565Open ↗
03/24/2022122281565Open ↗
03/11/2022122281565Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
02/13/2019121476045Open ↗
11/14/2018121476045Open ↗
11/08/2018121476045Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS6
06/29/2023122281565Open ↗
06/29/2023122281565Open ↗
06/29/2023122281565Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/29/2023122281565Open ↗
06/26/2023122281565Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/01/2023122281565Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
10/06/2017123159063Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/04/2026M00362842-I1Open ↗
09/01/2026M00510775-I1Open ↗
09/01/2026M00510811-P3Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
02/20/2020123840479Open ↗
11/22/2019123844475Open ↗
07/17/2018123475756Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00739090-I1Open ↗
08/17/2026M01276222-S1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
02/20/2020123840479Open ↗
11/22/2019123844475Open ↗
12/13/2018123475756Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
04/30/2021123307073Open ↗
04/16/2021123307091Open ↗
12/13/2018123475756Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/20/2022122281565Open ↗
09/15/2022122281565Open ↗
04/30/2021123307073Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/02/2026M00739090-I1Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/01/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
06/26/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISINTERIOR LIGHTING POWER1
06/24/2022121547718Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
06/24/2022121547718Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/24/2022121547718Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/28/2023122281565Open ↗
06/16/2021121547718Open ↗
04/30/2021123307073Open ↗
Showing 3 of 9 on file for this type
▸BISSTRUCTURAL STEEL - WELDING2
02/17/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
06/24/2022121547718Open ↗
06/24/2022121547718Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
02/17/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
06/26/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
02/17/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/17/2023122281565Open ↗
▸Approvals, Objections & Sign-offs60
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
11/15/2023123141420Open ↗
07/28/2023121476045Open ↗
06/28/2023122281565Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/13/2018123475756Open ↗
Showing 1 of 7 on file for this type
▸BISFINAL3
07/26/2023121476045Open ↗
06/26/2023122281565Open ↗
06/24/2022121547718Open ↗
▸BISSUPERSEDING LETTER2
08/22/2018123307091Open ↗
08/07/2018123307091Open ↗
▸BISSHED LETTER2
09/12/2018123141420Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT77
06/26/2023122281565Open ↗
01/18/2023122281565Open ↗
09/20/2022122281565Open ↗
Showing 3 of 77 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/26/2023121476045Open ↗
06/26/2023122281565Open ↗
▸Filing & Intake Forms74
▸BISEFILING COVER SHEET47
02/20/2020123840479Open ↗
11/22/2019123844475Open ↗
07/17/2018123475756Open ↗
Showing 3 of 47 on file for this type
▸BISADDITIONAL INFORMATION19
01/20/2023122281565Open ↗
01/03/2023122281565Open ↗
03/30/2022122281565Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM6
09/20/2022122110964Open ↗
09/20/2022122110964Open ↗
02/13/2019121476045Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents16
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/24/2021121547718Open ↗
07/26/2018121476045Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL2
06/24/2022121547718Open ↗
06/24/2022121547718Open ↗
▸BISSHUTOFF DAMPERS1
06/01/2023122281565Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMAINTENANCE INFORMATION1
06/01/2023122281565Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
06/01/2023122281565Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
06/24/2022121547718Open ↗