Condo, residential unit in elevator building
The Argyle Condominium
410 4TH AVENUE · BIN 3021564
💬 Discuss this project
2009Year Built
12Stories
R4Building Class
R6BZoning
55,536 sfGross Floor Area
89Units
LL97 CoveredRent Stabilized4 Active Violations 1 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · 13,000 sf lot · 4.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolstice Residential GroupUnder Construction4p · 2 filings · 11 docs
Floor 11Unit 11AUnder Construction3p · 1 filing · 3 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorSolstice Residential GroupUnder Construction29p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ryle Realty2203/21/2026
The Argyle Condominium1103/21/2026
Solstice Residential Group709/22/2026
410 4th Avenue303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Queens106/25/2026
Lawless & Mangione207/17/2025
Cribstone Engineering105/16/2025
Orsar Engineering105/02/2025
NY Restoration Technology406/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction803/21/2026
Outsource Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold1309/16/2026
Tower ElectricElectrical303/21/2026
Ice Age Mechanicalspecialty_contractor207/08/2026
Matsikas VasiliosElectrical103/21/2026
Xinos ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898106/25/2026
Special Testing & Consulting1688207/17/2025
Orsar Engineering8338105/02/2025
Building Lifecycle
All (106)Filed (9)Permit Issued (13)Signed Off (2)Facade (FISP) (9)Violation (55)Inspection (2)Special Inspection (16)
09/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2026
Permit issued — Sidewalk Shed
B01226853-I1-SH
06/26/2026
Permit issued — Suspended Scaffold
B01402799-I1-SC
06/25/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01402799-I1
06/15/2026
Permit issued — Sidewalk Shed
B01226853-I1-SH
06/03/2026
Permit issued — Mechanical Systems
B01219543-I1-MS
05/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
05/15/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
04/13/2026
Cycle 9 facade report signed — SWARMP
03/31/2026
Cycle 9 facade report submitted
03/06/2026
Permit issued — General Construction
B01128764-I1-GC
02/25/2026
Cycle 9 facade inspection completed
07/30/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY ORLANDO
07/30/2025
Special inspection requirement — Final
ANTHONY ORLANDO
07/30/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
07/17/2025
Filed — Alteration
FACADE REPAIRS, WORK TO INCLUDE CONCRETE AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01128764-P1
07/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
07/10/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
07/10/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY ORLANDO
07/10/2025
Special inspection requirement — Final
ANTHONY ORLANDO
05/16/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01226853-I1
05/16/2025
Permit issued — Sidewalk Shed
B01226853-I1-SH
05/15/2025
Permit issued — Mechanical Systems
B01219543-I1-MS
05/02/2025
Filed — Alteration
MECHANICAL FILING FOR NEW SPLIT HEAT PUMP AC UNITS
B01219543-I1
11/22/2024
Filed — Alteration
FACADE REPAIRS, WORK TO INCLUDE CONCRETE AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01128764-I1
02/01/2023
Cycle 9 facade report submitted
01/31/2023
Cycle 9 facade report signed — SWARMP
01/24/2023
Cycle 9 facade inspection completed
06/15/2021
Violation issued (ECB, closed)
Construction
12/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-I1
06/09/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-P2
06/09/2020
Special inspection requirement — Final
Hamidreza Saghari
02/13/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-S1
02/12/2020
Permit issued — Sidewalk Shed
B00058842-I1-SH
11/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2019
Permit issued — Sidewalk Shed
B00058842-I1-SH
02/19/2019
Permit issued — Supported Scaffold
B00058842-S1-SF
02/19/2019
Permit issued — Sidewalk Shed
B00058842-I1-SH
09/24/2018
Permit issued — Supported Scaffold
B00058842-S1-SF
09/21/2018
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-S1
09/21/2018
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-P1
09/21/2018
Special inspection requirement — Final
Hamidreza Saghari
07/05/2018
Permit issued — Sidewalk Shed
B00058842-I1-SH
07/03/2018
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED WITH SUPPORTED SCAFFOLD ATOP AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00058842-I1
02/02/2018
Violation issued (HPD, closed)
C
02/02/2018
Violation issued (HPD, open)
C
10/24/2017
Cycle 8 facade report submitted
10/17/2017
Cycle 8 facade report signed — SWARMP
10/16/2017
Cycle 8 facade inspection completed
10/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/12/2015
Violation issued (ECB, closed)
Unknown
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/15/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction06/26/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/15/2026
DOB NOWMechanical SystemsPermit IssuedIce Age Mechanical06/03/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction03/06/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction05/16/2025
DOB NOWMechanical SystemsPermit IssuedIce Age Mechanical05/15/2025
DOB NOWSidewalk ShedSigned-offXinos Construction02/12/2020
DOB NOWSidewalk ShedSigned-offXinos Construction05/23/2019
DOB NOWSupported ScaffoldSigned-offXinos Construction02/19/2019
DOB NOWSidewalk ShedSigned-offXinos Construction02/19/2019
DOB NOWSupported ScaffoldSigned-offXinos Construction09/24/2018
DOB NOWSidewalk ShedSigned-offXinos Construction07/05/2018
BISOTISSUEDXinos Construction02/19/2020
BISPLISSUEDArco Plumbing and Heating04/16/2018
BISOTISSUEDNo Limit Contracting04/12/2018
BISOTISSUEDXinos Construction03/13/2018
BISOTISSUEDXinos Construction08/25/2017
BISEQISSUEDIntersystem S&S04/18/2017
BISEQISSUEDXinos Construction03/04/2016
BISOTISSUEDXinos Construction02/24/2016
BISEQISSUEDXinos Construction02/27/2015
BISOTISSUEDXinos Construction02/24/2015
BISOTISSUEDXinos Construction08/25/2014
BISEQISSUEDXinos Construction08/11/2014
BISMHISSUEDIceberg Mechanical04/02/2013
BISOTISSUEDLuxury Construction Co09/10/2012
BISEQISSUEDB & A Restoration Contracting08/27/2010
BISOTISSUEDWheaton Builders02/11/2010
BISEQISSUEDColgate Scaff & Equipment Co02/25/2009
BIS—ISSUEDWheaton Builders01/15/2009
BISEQISSUEDWheaton Builders01/15/2009
BISEQISSUEDCSC of NY01/08/2009
BISEQISSUEDCSC of NY12/31/2008
BIS—ISSUEDWheaton Builders11/10/2008
BISEQISSUEDCSC of New York10/21/2008
BISPLISSUEDAdvanced Plumbing Mechanical10/07/2008
BISOTISSUEDWheaton Builders02/11/2008
BIS—ISSUEDWheaton Builders02/01/2008
BISEQISSUEDCSC of NY01/17/2008
+ 9 more permits on file
1 project · most recent 05/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/02/2025Permit IssuedIce Age MechanicalHeating and Air Conditioning Systems
Heat / Cool
2 projects · most recent 05/29/2025
FiledStatusContractorScope
05/29/2025Permit IssuedTower Electric—
07/03/2018Permit IssuedTower Electric—
1 project · most recent 05/16/2025
Sidewalk Shed
FiledStatusContractorScope
05/16/2025Permit IssuedXinos ConstructionSidewalk Shed
1 project · most recent 06/25/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/25/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/28/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/15/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
05/15/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/30/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2025Energy Code Compliance InspectionsANTHONY ORLANDOprogress
07/30/2025FinalANTHONY ORLANDOprogress
07/30/2025Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
07/10/2025Tenant Protection Plan Compliance—special
07/10/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/10/2025Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
07/10/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
07/10/2025Energy Code Compliance InspectionsANTHONY ORLANDOprogress
07/10/2025FinalANTHONY ORLANDOprogress
06/09/2020FinalHamidreza Saghariprogress
09/21/2018FinalHamidreza Saghariprogress
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/03/2026B00058842-P1Request digital key ↗
09/03/2026B00058842-S1Request digital key ↗
09/03/2026B00058842-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/03/2026B00058842-I1Request digital key ↗
08/15/2026B00058842-P2Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION17
07/08/2019321950117Open ↗
04/16/2018321733745Open ↗
04/12/2018321733745Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
03/09/2021321733745Open ↗
06/26/2019321950117Open ↗
03/09/2018321733745Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/01/2016321202845Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
04/23/2009310298157Open ↗
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
06/26/2019321950117Open ↗
06/26/2019321950117Open ↗
07/10/2018321202845Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00058842-P2Open ↗
09/03/2026B00058842-I1Open ↗
09/03/2026B00058842-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/26/2019321950117Open ↗
08/23/2012320522190Open ↗
08/30/2010320202614Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026B00058842-I1Open ↗
08/23/2026B01128764-I1Open ↗
08/23/2026B01128764-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/12/2026B01128764-P1Open ↗
09/02/2026B01402799-I1Open ↗
09/02/2026B01402799-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/23/2012320522190Open ↗
08/30/2010320202614Open ↗
02/08/2008310086910Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/26/2019321950117Open ↗
04/14/2017340493807Open ↗
08/08/2014340171236Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/14/2017340493807Open ↗
08/08/2014340171236Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/14/2017340493807Open ↗
08/08/2014340171236Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/09/2013320721689Open ↗
02/26/2013320721689Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/09/2018321733745Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
02/26/2013320721689Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
04/14/2017340493807Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
08/23/2012320522190Open ↗
08/30/2010320202614Open ↗
04/16/2009320005864Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/26/2013320721689Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01219543-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/26/2019321950117Open ↗
03/09/2018321733745Open ↗
08/07/2014321202845Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/05/2021321733745Open ↗
07/10/2018321202845Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/30/2013320522190Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/14/2017340493807Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/04/2021321733745Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/16/2025321950117Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/04/2021321733745Open ↗
04/14/2017340493807Open ↗
08/08/2014340171236Open ↗
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
03/24/2021321733745Open ↗
03/24/2021321733745Open ↗
07/10/2018321202845Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
08/07/2014321202845Open ↗
02/26/2013320721689Open ↗
08/23/2012320522190Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/09/2013320721689Open ↗
01/30/2013320522190Open ↗
12/14/2010320202614Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
03/28/2016340171236Open ↗
03/09/2015340171236Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
06/26/2019321950117Open ↗
07/10/2018321202845Open ↗
03/09/2018321733745Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/16/2025321950117Open ↗
03/04/2021321733745Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET10
06/26/2019321950117Open ↗
03/09/2018321733745Open ↗
08/07/2014321202845Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/14/2017340493807Open ↗
08/08/2014340171236Open ↗
▸BISADDITIONAL INFORMATION1
05/02/2017321202845Open ↗
▸BISBOROUGH INTAKE FORM1
07/10/2018321202845Open ↗
▸Other Documents7
▸DOB NOWBSA Meeting Minutes/BSA Resolution3
08/13/2026B00058842-I1Open ↗
08/13/2026B00058842-P2Open ↗
08/13/2026B00058842-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/08/2014340171236Open ↗
08/08/2014340171236Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
02/11/2008310086910Open ↗
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
12/30/2024321950117Open ↗