← Back
Elevator apt, semi-fireproof without stores
Concern Pitkin
410 WARWICK STREET · BIN 3392571
💬 Discuss this project
2021Year Built
6Stories
D1Building Class
R7AZoning
40,670 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: CONCERN PITKIN HOUSING DEVELOPMENT FUND CORP. · 7,500 sf lot · 5.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscape
Roof3p · 2 filings · 20 docs
Floor 68p · 2 filings · 20 docs
Floor 57p · 2 filings · 20 docs
Floor 47p · 2 filings · 20 docs
Floor 37p · 2 filings · 20 docs
Floor 28p · 3 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONCERN PITKIN HOUSING DEVELOPMENT FUND CORP.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2019$2.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHNSON & URBAN705/15/2023
PAUL PERDEK, PROF. ENG. PLLC1101/24/2023
AN CONSULTING ENGINEER, PLLC208/18/2021
BECKER ENGINEERING, P.C.106/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2203/21/2026
PRECISION 3SIXTY NYC, INC203/21/2026
BMB BUILDING CONSULTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor707/08/2026
WITH PRIDE AIR CONDITIONINGGeneral Contractor603/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing507/08/2026
PENTA RESTORATION CORPGeneral Contractor507/08/2026
DDS MECHANICAL FPS CORPFire Protection407/08/2026
SKF ELECTRICAL CORP 005177General Contractor203/22/2026
HARUN HOSGOREN KINGElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803605/15/2023
Building Lifecycle
All (156)Filed (21)Permit Issued (15)Signed Off (6)Violation (40)Inspection (8)Objection (36)Special Inspection (30)
08/13/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, closed)
B
07/29/2026
Violation issued (HPD, closed)
C
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
A
07/29/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (ECB, open)
Elevators
11/21/2024
Violation issued (HPD, closed)
C
11/21/2024
Violation issued (HPD, closed)
C
09/13/2024
Violation issued (HPD, closed)
C
09/13/2024
Violation issued (HPD, closed)
B
09/13/2024
Violation issued (HPD, closed)
C
07/29/2024
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, closed)
A
11/14/2023
Signed off — Alteration
PROPOSE PLUMBING, SPRINKLER, AND STANDPIPE WORK TYPES IN CONJUNCTION WITH NB #321597009
B00218159-I1
10/21/2023
Violation issued (FDNY_NOV, closed)
09/07/2023
Signed off — Alteration
B00545923-I1
06/05/2023
Signed off — Alteration
PROPOSE MECHANICAL SCOPE OF WORK IN CONJUNCTION WITH NB APPLICATION #321597009
B00218100-I1
05/17/2023
Special inspection requirement — Maintenance information
Justin Moses
05/17/2023
Special inspection requirement — Electrical energy consumption
Justin Moses
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
05/17/2023
Special inspection requirement — Electrical motors
Justin Moses
05/17/2023
Special inspection requirement — HVAC and service water heating system controls
Justin Moses
05/17/2023
Special inspection requirement — HVAC insulation and sealing
Justin Moses
05/17/2023
Special inspection requirement — Shutoff dampers
Justin Moses
05/17/2023
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
05/17/2023
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/17/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
05/17/2023
Special inspection requirement — HVAC and service water heating equipment
Justin Moses
05/16/2023
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
05/16/2023
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
05/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
05/15/2023
Filed — Alteration
PROPOSE MECHANICAL SCOPE OF WORK IN CONJUNCTION WITH NB APPLICATION #321597009
B00218100-P2
05/15/2023
Filed — Alteration
PROPOSE PLUMBING, SPRINKLER, AND STANDPIPE WORK TYPES IN CONJUNCTION WITH NB #321597009
B00218159-P3
05/11/2023
Special inspection requirement — HVAC and service water heating equipment
Justin Moses
05/11/2023
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/11/2023
Special inspection requirement — Electrical energy consumption
Justin Moses
05/11/2023
Special inspection requirement — Electrical energy consumption
Justin Moses
05/11/2023
Special inspection requirement — Electrical motors
Justin Moses
05/11/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
05/11/2023
Special inspection requirement — Electrical motors
Justin Moses
05/11/2023
Special inspection requirement — Maintenance information
Justin Moses
05/11/2023
Special inspection requirement — HVAC insulation and sealing
Justin Moses
05/11/2023
Special inspection requirement — Maintenance information
Justin Moses
05/11/2023
Special inspection requirement — HVAC and service water heating equipment
Justin Moses
05/11/2023
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (FDNY_NOV, closed)
04/25/2023
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/15/2023
Permit issued — Mechanical Systems
B00218100-I1-MS
04/06/2023
Filed — Alteration
PROPOSE PLUMBING, SPRINKLER, AND STANDPIPE WORK TYPES IN CONJUNCTION WITH NB #321597009
B00218159-P2
03/14/2023
Signed off — Alteration
STRUCTURAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB#321597009
B00218748-I1
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWITH PRIDE AIR CONDITIONI04/15/2023
DOB NOWStructuralSigned-offPENTA RESTORATION CORP02/21/2023
DOB NOWMechanical SystemsSigned-offWITH PRIDE AIR CONDITIONI02/15/2023
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP01/04/2023
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/14/2022
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP08/12/2022
DOB NOWPlumbingSigned-offDDS MECHANICAL FPS CORP08/12/2022
DOB NOWConstruction FenceSigned-offPENTA RESTORATION CORP06/27/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING06/09/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING02/03/2022
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP08/30/2021
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/30/2021
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP08/30/2021
DOB NOWConstruction FenceSigned-offPENTA RESTORATION CORP06/25/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING06/10/2021
BIS—ISSUEDPENTA RESTORATION CORP09/28/2022
BIS—ISSUEDPENTA RESTORATION CORP09/28/2022
BIS—ISSUEDPENTA RESTORATION CORP08/08/2022
BIS—ISSUEDPENTA RESTORATION CORP08/08/2022
BISEQISSUEDTRI BOROUGH SCAFFOLDING03/10/2022
BIS—ISSUEDPENTA RESTORATION CORP03/03/2022
BIS—ISSUEDPENTA RESTORATION CORP03/03/2022
BIS—ISSUEDPENTA RESTORATION CORP08/06/2021
BIS—ISSUEDPENTA RESTORATION CORP08/06/2021
BIS—ISSUEDPENTA RESTORATION CORP07/16/2021
BIS—ISSUEDPENTA RESTORATION CORP07/16/2021
BIS—ISSUEDPENTA RESTORATION CORP07/08/2021
BIS—ISSUEDPENTA RESTORATION CORP07/07/2021
4 projects · most recent 05/12/2022
General Wiring
FiledStatusContractorScope
05/12/2022CompleteSKF ELECTRICAL CORPGeneral Wiring
02/09/2022CompleteTUXEDO ELEC'L CONTR'G INC—
09/08/2021CompleteSKF ELECTRICAL CORP1 meters, 1 new_meters
06/02/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/25/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/15/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/22/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
05/17/2023Heating SystemsSAMI HAJJAR P.Especial
05/17/2023Electrical energy consumptionJustin Mosesenergy_progress
05/17/2023HVAC and service water heating equipment Justin Mosesenergy_progress
05/17/2023Electrical motorsJustin Mosesenergy_progress
05/17/2023Maintenance informationJustin Mosesenergy_progress
05/17/2023Shutoff dampersJustin Mosesenergy_progress
05/17/2023HVAC and service water heating system controls Justin Mosesenergy_progress
05/17/2023HVAC insulation and sealing Justin Mosesenergy_progress
05/17/2023FinalSAMI HAJJAR P.Eprogress
05/17/2023Energy Code Compliance InspectionsJustin Mosesprogress
05/17/2023Mechanical SystemsSAMI HAJJAR P.Especial
05/16/2023Sprinkler SystemsSAMI HAJJAR P.Especial
05/16/2023Standpipe SystemsSAMI HAJJAR P.Especial
05/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
05/16/2023Energy Code Compliance InspectionsJustin Mosesprogress
05/16/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/11/2023Mechanical SystemsSAMI HAJJAR P.Especial
05/11/2023Energy Code Compliance InspectionsJustin Mosesprogress
05/11/2023FinalSAMI HAJJAR P.Eprogress
05/11/2023HVAC and service water heating system controls Justin Mosesenergy_progress
05/11/2023Electrical motorsJustin Mosesenergy_progress
05/11/2023HVAC and service water heating equipment Justin Mosesenergy_progress
05/11/2023HVAC insulation and sealing Justin Mosesenergy_progress
05/11/2023Shutoff dampersJustin Mosesenergy_progress
05/11/2023Maintenance informationJustin Mosesenergy_progress
Latest 25 of 80.
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch12
09/01/2026B00536162-P3Request digital key ↗
09/01/2026B00536162-P4Request digital key ↗
09/01/2026B00536162-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00218159-P1Request digital key ↗
09/02/2026B00218159-P3Request digital key ↗
09/02/2026B00218159-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00218159-P1Request digital key ↗
09/02/2026B00218159-P3Request digital key ↗
08/15/2026B00218159-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/02/2026B00218159-P1Request digital key ↗
09/02/2026B00218159-P3Request digital key ↗
09/02/2026B00218159-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/27/2026B00218100-P2Request digital key ↗
08/27/2026B00218100-P1Request digital key ↗
08/27/2026B00218100-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00218748-P1Request digital key ↗
08/14/2026B00218748-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION26
06/09/2023321597009Open ↗
05/11/2023321597009Open ↗
03/21/2023340709996Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION15
09/29/2022321597009Open ↗
09/29/2022321597009Open ↗
09/29/2022321597009Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/25/2023340709996Open ↗
07/17/2020340709996Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/26/2023321597009Open ↗
▸BISHPD: PERMIT NOTICE1
07/01/2021321597009Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
06/30/2023321597009Open ↗
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature49
08/31/2026B00218159-P1Open ↗
08/31/2026B00218159-P1Open ↗
08/31/2026B00218159-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
08/31/2026B00218159-P1Open ↗
08/31/2026B00218159-P1Open ↗
08/31/2026B00218159-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026B00536162-P3Open ↗
09/01/2026B00536162-P2Open ↗
09/01/2026B00536162-P1Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/07/2022340834985Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment5
▸BISWATER METER PERMIT : DEP-METER1
06/12/2023321597009Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/12/2023321597009Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/21/2023321597009Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
01/31/2023321597009Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/24/2023321597009Open ↗
▸Safety & Tenant Protection8
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
01/24/2023321597009Open ↗
12/29/2022322028177Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/08/2021321597009Open ↗
04/29/2020340709996Open ↗
▸BISSTREET TREE CHECKLIST2
04/29/2020340709996Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/07/2021321597009Open ↗
▸BISSTREET TREE SIGNOFF1
05/04/2023321597009Open ↗
▸Environmental & Asbestos12
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
02/07/2022340834985Open ↗
07/19/2020322028177Open ↗
07/17/2020340709996Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026B00218159-P1Open ↗
08/13/2026B00218159-I1Open ↗
08/13/2026B00218159-P2Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
09/15/2023322028177Open ↗
08/11/2023321597009Open ↗
03/08/2023340834985Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00218159-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/23/2021321597009Open ↗
07/08/2021321597009Open ↗
09/29/2020321597009Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/21/2023321597009Open ↗
12/29/2022322028177Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/21/2023321597009Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/21/2023321597009Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/21/2023321597009Open ↗
▸BISINTERIOR LIGHTING POWER1
02/21/2023321597009Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/21/2023321597009Open ↗
▸BISFENESTRATION AREAS1
02/21/2023321597009Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
04/24/2023321597009Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00218100-I1Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY26
04/10/2023321597009Open ↗
03/03/2023321597009Open ↗
03/10/2022340834985Open ↗
Showing 3 of 26 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/24/2023321597009Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/24/2023321597009Open ↗
▸BISMECHANICAL SYSTEMS1
05/18/2023321597009Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/07/2021321597009Open ↗
▸BISCONCRETE - PRECAST1
01/24/2023321597009Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/23/2023321597009Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/24/2023321597009Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/07/2021321597009Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/24/2023321597009Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/18/2023321597009Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/18/2023321597009Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/20/2019321597009Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/24/2023321597009Open ↗
▸BISMASONRY1
01/24/2023321597009Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026B00218159-P3Open ↗
08/13/2026B00218100-I1Open ↗
08/13/2026B00218159-P2Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
03/01/2023321597009Open ↗
02/24/2023321597009Open ↗
09/13/2021321597009Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/25/2021322028177Open ↗
09/27/2021322028177Open ↗
09/23/2021321597009Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/18/2023322028177Open ↗
03/09/2023340834985Open ↗
▸BISFINAL2
03/08/2023340834985Open ↗
12/29/2022322028177Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
03/01/2023321597009Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
08/09/2023321597009Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
01/31/2023321597009Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/29/2022321597009Open ↗
09/27/2022321597009Open ↗
07/08/2021321597009Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/30/2021321597009Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION14
04/11/2023321597009Open ↗
04/11/2023321597009Open ↗
03/25/2023340709996Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM3
09/27/2022321597009Open ↗
07/08/2021321597009Open ↗
07/02/2021321597009Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/07/2022340834985Open ↗
12/13/2019340709996Open ↗
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents2
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/21/2023321597009Open ↗
▸BISSHUTOFF DAMPERS1
02/21/2023321597009Open ↗