← Back
Miscellaneous two family
410 WEST 146 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1061356
💬 Discuss this project
1893Year Built
3Stories
B9Building Class
R6AZoning
4,400 sfGross Floor Area
2Units
Rent Stabilized109 Open Violations 108 unresolved · 1 paperwork only ▸
Miscellaneous two family · Owner of record: 410 W 146 LLC · 1,998 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction61p · 1 filing · 20 docs
Floor 2Under Construction63p · 1 filing · 20 docs
Floor 1Under Construction61p · 1 filing · 20 docs
CellarUnder Construction63p · 1 filing · 20 docs
BasementUnder Construction61p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COHABS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2025$1.9M—LEINSTER PROPERTIES, LLC → 410 W 146 LLC$420/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS308/12/2026
RAAD507/31/2026
GRANT ENGINEERING CONSULTANTS, LLC108/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BADGER MANAGEMENT INCGeneral Contractor307/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605808/12/2026
Building Lifecycle
All (121)Filed (9)Permit Issued (4)Signed Off (2)Violation (60)Inspection (12)Objection (12)Special Inspection (22)
08/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2026
Signed off — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-S2
08/12/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-P5
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/10/2026
Signed off — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-S3
07/31/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-P4
07/30/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-P3
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
07/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
06/15/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-P2
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/15/2026
Special inspection requirement — Mechanical Systems
JAMES CHUN
04/15/2026
Special inspection requirement — Final
Cloud Lee
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/08/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/07/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-P1
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
03/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2026
Permit issued — Plumbing
M01203973-S1-PL
01/16/2026
Permit issued — Structural
M01203973-S3-ST
01/15/2026
Permit issued — Mechanical Systems
M01203973-S2-MS
12/05/2025
Violation issued (ECB, closed)
Construction
12/05/2025
Violation issued (ECB, open)
Unknown
12/05/2025
Violation issued (ECB, closed)
Construction
12/05/2025
Violation issued (ECB, closed)
Construction
12/05/2025
Violation issued (ECB, closed)
Construction
12/05/2025
Violation issued (ECB, closed)
Unknown
11/28/2025
Permit issued — General Construction
M01203973-I1-GC
11/17/2025
Violation issued (HPD, closed)
I
10/21/2025
Objection raised — Other
10/21/2025
Objection resolved — Addressed
10/19/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Other
10/03/2025
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-S2
10/03/2025
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-S1
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Other
09/05/2025
Objection raised — Scope
09/05/2025
Objection raised — Cost
08/25/2025
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01203973-I1 AS PER THE DRAWINGS FILED HEREIN.
M01203973-S3
07/02/2025
Special inspection requirement — Subgrade Inspections
JAMES CHUN
06/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/12/2025
Special inspection requirement — Post-installed Anchors
JAMES CHUN
05/12/2025
Special inspection requirement — Masonry
JAMES CHUN
05/12/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JAMES CHUN
05/12/2025
Special inspection requirement — Structural Cold-Formed Steel
JAMES CHUN
05/12/2025
Special inspection requirement — Structural Steel - Details
JAMES CHUN
05/12/2025
Special inspection requirement — Structural Wood Frame
JAMES CHUN
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.01/20/2026
DOB NOWStructuralSigned-offBADGER MANAGEMENT01/16/2026
DOB NOWMechanical SystemsSigned-offBADGER MANAGEMENT01/15/2026
DOB NOWGeneral ConstructionPermit IssuedBADGER MANAGEMENT11/28/2025
BIS—ISSUEDDESIGNDIREKT INTERNATIONA01/28/2015
BIS—ISSUEDDESIGNDIREKT INTERNATIONA09/13/2013
BIS—ISSUEDDESIGNDIREKT INTERNATION*10/26/2011
BIS—ISSUEDJT MAGEN & COMPANY INC12/08/2010
BIS—ISSUEDJT MAGEN & COMPANY INC12/18/2009
BIS—ISSUEDJT MAGEN & COMPANY INC11/03/2008
BIS—ISSUEDJT MAGEN & COMPANY INC07/27/2007
1 project · most recent 08/12/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScope
08/12/2026Signed-offBADGER MANAGEMENT INCHeating and Air Conditioning Systems, Heating Systems
1 project · most recent 08/12/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/12/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026CompleteE & M ELECTRICAL NY CORPGeneral Wiring
12/15/2025CompleteE & M ELECTRICAL NY CORP—
1 project · most recent 08/12/2026
Steel Concrete Wood
FiledStatusContractorScope
08/12/2026Permit IssuedAMERICAN STANDARD P&H CORSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Pass-Final PL - UndergroundPassView ↗
04/08/2026Pass-Final PL - UndergroundPassView ↗
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/11/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
08/11/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
07/30/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
07/07/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
07/07/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/29/2026Fire-Resistance Rated Construction—progress
04/29/2026Fire-Resistant Penetrations and Joints—special
04/15/2026Mechanical SystemsJAMES CHUNspecial
04/15/2026FinalCloud Leeprogress
04/15/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/06/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
07/02/2025Subgrade InspectionsJAMES CHUNspecial
05/12/2025Post-installed AnchorsJAMES CHUNspecial
05/12/2025MasonryJAMES CHUNspecial
05/12/2025Structural Steel - High Strength BoltingJAMES CHUNspecial
05/12/2025Structural Cold-Formed SteelJAMES CHUNspecial
05/12/2025Structural Steel - DetailsJAMES CHUNspecial
05/12/2025Structural Wood FrameJAMES CHUNprogress
05/12/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
05/12/2025Structural Steel - WeldingJAMES CHUNspecial
05/12/2025Concrete - Cast-In-PlaceJAMES CHUNspecial
04/28/2025FinalCloud Leeprogress
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026M01203973-P3Request digital key ↗
08/21/2026M01203973-P2Request digital key ↗
08/21/2026M01203973-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/21/2026M01203973-P5Open ↗
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P3Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01203973-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026M01203973-P3Open ↗
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01203973-P3Open ↗
09/01/2026M01203973-P1Open ↗
09/01/2026M01203973-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M01203973-P3Open ↗
08/26/2026M01203973-S3Open ↗
08/26/2026M01203973-S3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist9
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P5Open ↗
08/21/2026M01203973-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWStreet Tree Checklist3
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P5Open ↗
08/14/2026M01203973-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026M01203973-P3Open ↗
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents6
▸DOB NOWProof of Historic Building3
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P5Open ↗
08/13/2026M01203973-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026M01203973-P2Open ↗
08/21/2026M01203973-P5Open ↗
08/14/2026M01203973-I1Open ↗