← Back
BuildNYC
Mission house (non-residential)
410 WEST 40TH STREET
MANHATTAN · BIN 1013005
💬 Discuss this project
1900Year Built
4Stories
M2Building Class
C1-7AZoning
15,571 sfGross Floor Area
4Units
4 Active Violations 3 unresolved · 1 paperwork only 7 old, status unconfirmed ▸
Mission house (non-residential) · 4,354 sf lot · 3.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPipe scaffolding installation5p · 2 filings · 3 docs
Floor 4Pipe scaffold installation4p · 1 filing · 2 docs
Floor 3Pipe scaffold installation4p · 1 filing · 2 docs
Floor 2Metro Baptist ChurchUnder Construction11p · 2 filings · 15 docs
Floor 1Metro Baptist Church8p · 2 filings · 12 docs
MezzanineMetro Baptist ChurchUnder Construction7p · 1 filing · 13 docs
CellarMetro Baptist Church1p · 3 filings · 15 docs
Site & exteriorMetro Baptist ChurchUnder Construction19p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Metro Baptist Church3407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Old Structures Engineering301/22/2025
Thomas A Scibilia310/28/2024
Ashraf108/29/2024
Paul Perdek, Prof. Engineering205/30/2024
Design42 Architecture404/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO603/21/2026
AE Design Solution403/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Integrity ContractingScaffold507/08/2026
I.M.P. Plumbing & HeatingPlumbing407/08/2026
Integrity ContractingGeneral Contractor307/08/2026
Core Scaffold SystemsScaffold204/09/2026
FSM ElectricalElectrical103/21/2026
Platinum Services NYScaffold107/08/2026
Gryglewski DariuszElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842501/22/2025
Building Lifecycle
All (78)Filed (13)Permit Issued (13)Signed Off (7)Violation (13)Inspection (6)Objection (6)Special Inspection (20)
08/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2026
Permit issued — Protection and Mechanical Methods
M01009511-S1-PMM
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/11/2025
Signed off — Alteration
M01058769-I1
11/11/2025
Signed off — Alteration
M01058763-I1
07/03/2025
Violation issued (ECB, open)
Construction
06/02/2025
Permit issued — Protection and Mechanical Methods
M01009511-S1-PMM
05/19/2025
Permit issued — Protection and Mechanical Methods
M01009511-S1-PMM
03/19/2025
Signed off — Alteration
Install temporary protection safety net around monumental stained glass window on north facade. No change in occupancy, use or egress.
M01009511-I1
01/31/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
01/31/2025
Special inspection requirement — Final
CONNIE PISANI
01/31/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
01/31/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/24/2025
Objection raised — Other
01/24/2025
Objection resolved — Addressed
01/22/2025
Filed — Alteration
Install temporary protection safety net around monumental stained glass window on north facade. No change in occupancy, use or egress.
M01009511-P1
01/21/2025
Special inspection requirement — Final
CONNIE PISANI
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/21/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/21/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
01/21/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
01/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
11/19/2024
Signed off — Alteration
APPLICATION FOR BOILER REPLACEMENT
M00233402-I1
10/28/2024
Filed — Alteration
APPLICATION FOR BOILER REPLACEMENT
M00233402-P2
09/25/2024
Filed — Alteration
APPLICATION FOR BOILER REPLACEMENT
M00233402-P1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2024
Permit issued — Boiler Equipment
M00233402-I1-BE
09/03/2024
Permit issued — Supported Scaffold
M01096317-I1-SF
08/29/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01096317-I1
07/31/2024
Signed off — Alteration
GENERAL CONSTRUCTION WORK FOR NEW RESTROOM AND MEETING ROOM AT FIRST FL. NO CHANGE IN EXISTING BULK, USE, OCCUPANCY OR EGRESS. ASSOCIATED PL FILED AS SUBSEQUENT APPLICATION.
M01019460-S1
07/31/2024
Signed off — Alteration
GENERAL CONSTRUCTION WORK FOR NEW RESTROOM AND MEETING ROOM AT FIRST FL. NO CHANGE IN EXISTING BULK, USE, OCCUPANCY OR EGRESS. ASSOCIATED PL FILED AS SUBSEQUENT APPLICATION.
M01019460-I1
07/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2024
Permit issued — Structural
M01009511-I1-ST
05/31/2024
Permit issued — Supported Scaffold
M01058769-I1-SF
05/31/2024
Permit issued — Sidewalk Shed
M01058763-I1-SH
05/30/2024
Filed — Alteration
M01058769-I1
05/30/2024
Filed — Alteration
M01058763-I1
05/29/2024
Permit issued — Plumbing
M01019460-S1-PL
05/21/2024
Permit issued — Protection and Mechanical Methods
M01009511-S1-PMM
05/17/2024
Permit issued — General Construction
M01019460-I1-GC
04/24/2024
Objection resolved — Addressed
04/12/2024
Filed — Alteration
GENERAL CONSTRUCTION WORK FOR NEW RESTROOM AND MEETING ROOM AT FIRST FL. NO CHANGE IN EXISTING BULK, USE, OCCUPANCY OR EGRESS. ASSOCIATED PL FILED AS SUBSEQUENT APPLICATION.
M01019460-S1
04/12/2024
Filed — Alteration
GENERAL CONSTRUCTION WORK FOR NEW RESTROOM AND MEETING ROOM AT FIRST FL. NO CHANGE IN EXISTING BULK, USE, OCCUPANCY OR EGRESS. ASSOCIATED PL FILED AS SUBSEQUENT APPLICATION.
M01019460-I1
04/12/2024
Objection raised — Other
04/01/2024
Filed — Alteration
Install temporary protection safety net around monumental stained glass window on north facade. No change in occupancy, use or egress.
M01009511-I1
04/01/2024
Filed — Alteration
Install temporary protection safety net around monumental stained glass window on north facade. No change in occupancy, use or egress.
M01009511-S1
03/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
03/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
03/13/2024
Special inspection requirement — Final
CONNIE PISANI
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
03/13/2024
Special inspection requirement — Lighting controls
CONNIE PISANI
03/13/2024
Special inspection requirement — Interior lighting power
CONNIE PISANI
03/06/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
03/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedIntegrity Contracting06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedIntegrity Contracting06/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedIntegrity Contracting05/19/2025
DOB NOWBoiler EquipmentSigned-offI.M.P. Plumbing & Heating09/16/2024
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY09/03/2024
DOB NOWStructuralSigned-offIntegrity Contracting06/03/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems05/31/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/31/2024
DOB NOWPlumbingSigned-offI.M.P. Plumbing & Heating05/29/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedIntegrity Contracting05/21/2024
DOB NOWGeneral ConstructionSigned-offIntegrity Contracting05/17/2024
DOB NOWPlumbingSigned-offI.M.P. Plumbing & Heating10/07/2021
DOB NOWBoiler EquipmentSigned-offI.M.P. Plumbing & Heating09/30/2019
BISFPISSUEDAllied Fire Control Services04/16/2014
BISOTISSUEDNobel Construction06/19/2012
BISPLISSUEDT-W Enterprises03/17/2009
BISFPISSUEDAlied Fire Control12/14/2006
BISPLISSUEDSal Napoli Plumbing & Heating08/08/2006
BIS—ISSUEDR.A. Contracting Company03/20/2006
BISOTISSUEDMetro Baptist Church of NYC06/03/2003
BISFBISSUEDVijax Fuel08/14/1998
BISOTISSUEDMetro Baptist Church02/27/1998
2 projects · most recent 06/08/2024
General Wiring
FiledStatusContractorScope
06/08/2024CompleteSolas Electrical—
03/07/2023CompleteArc Power Electrical ContsGeneral Wiring
1 project · most recent 01/22/2025
Steel
FiledStatusContractorScope
01/22/2025Permit IssuedIntegrity ContractingSteel
1 project · most recent 08/29/2024
Scaffold
FiledStatusContractorScope
08/29/2024Permit IssuedPlatinum Services NYScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/31/2025Structural Steel - WeldingCONNIE PISANIspecial
01/31/2025FinalCONNIE PISANIprogress
01/31/2025Structural Steel - High Strength BoltingCONNIE PISANIspecial
01/31/2025Tenant Protection Plan ComplianceCONNIE PISANIspecial
01/31/2025Structural Steel - DetailsCONNIE PISANIspecial
01/31/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
01/21/2025FinalCONNIE PISANIprogress
01/21/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
01/21/2025Structural Steel - DetailsCONNIE PISANIspecial
01/21/2025Structural Steel - High Strength BoltingCONNIE PISANIspecial
01/21/2025Structural Steel - WeldingCONNIE PISANIspecial
01/21/2025Tenant Protection Plan ComplianceCONNIE PISANIspecial
03/14/2024Tenant Protection Plan ComplianceCONNIE PISANIspecial
03/13/2024Tenant Protection Plan ComplianceCONNIE PISANIspecial
03/13/2024FinalCONNIE PISANIprogress
03/13/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
03/13/2024Lighting controlsCONNIE PISANIenergy_progress
03/13/2024Interior lighting powerCONNIE PISANIenergy_progress
03/06/2024Post-installed AnchorsCONNIE PISANIspecial
03/06/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Metro Baptist ChurchReligiousCellar, Floors 1, 2, Mezzanine
Project M01019460 Alteration · LOC Issued · 04/12/2024
Project M01009511 Alteration · Permit Entire · 04/01/2024
Project M00589669 Alteration · LOC Issued · 09/21/2021
Project M00233402 Alteration · LOC Issued · 09/27/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
09/03/2026M00589669-P1Request digital key ↗
08/27/2026M01019460-S1Request digital key ↗
08/27/2026M01019460-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/26/2026M00233402-P1Request digital key ↗
08/26/2026M00233402-P2Request digital key ↗
08/26/2026M00233402-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
03/31/2014121947135Open ↗
06/04/2012121095625Open ↗
08/26/2009110433512Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
04/21/2014121947135Open ↗
06/21/2012121095625Open ↗
03/18/2009110433512Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00589669-I1Open ↗
09/03/2026M00589669-P1Open ↗
08/27/2026M01058769-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
04/21/2014121947135Open ↗
03/31/2014121947135Open ↗
12/13/2012121095625Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026M01009511-S1Open ↗
08/26/2026M01019460-I1Open ↗
08/26/2026M01009511-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026M01019460-I1Open ↗
08/26/2026M01019460-I1Open ↗
08/26/2026M01009511-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/04/2012121095625Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/04/2012121095625Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
08/26/2009110433512Open ↗
01/13/2009110433512Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/31/2014121947135Open ↗
▸Safety & Tenant Protection7
▸DOB NOWHPD-1: Anti-Harassment Area Checklist5
09/03/2026M00589669-P1Open ↗
08/26/2026M00233402-P1Open ↗
08/26/2026M00233402-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
01/13/2009110433512Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/04/2012121095625Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00589669-P1Open ↗
08/26/2026M00233402-I1Open ↗
08/26/2026M00233402-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/13/2009110433512Open ↗
05/13/2008110149606Open ↗
05/13/2008110149606Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/31/2014121947135Open ↗
06/04/2012121095625Open ↗
06/04/2012121095625Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/13/2012121095625Open ↗
12/13/2012121095625Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2012121095625Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
09/03/2026M00589669-P1Open ↗
08/26/2026M00233402-I1Open ↗
08/26/2026M00233402-P1Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/13/2012121095625Open ↗
12/19/2009110433512Open ↗
11/04/2009110433512Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/04/2012121095625Open ↗
01/13/2009110433512Open ↗
05/13/2008110149606Open ↗
▸BISLANDMARKS APPROVAL1
07/30/2009110149606Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/04/2009110433512Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
03/31/2014121947135Open ↗
12/13/2012121095625Open ↗
06/04/2012121095625Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
03/31/2014121947135Open ↗
06/04/2012121095625Open ↗
01/13/2009110433512Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/13/2012121095625Open ↗
07/30/2009110149606Open ↗