← Back
Elevator cooperative
4101 BROADWAY
MANHATTAN · BIN 1063500
💬 Discuss this project
1926Year Built
12Stories
D4Building Class
R8Zoning
78,425 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized43 Open Violations 39 unresolved · 4 paperwork only ▸FISP: UNSAFE
Elevator cooperative · Owner of record: 4101 BROADWAY OWNER LLC · 7,900 sf lot · 9.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 9 docs
Cellar2p · 1 filing · 11 docs
BasementUnder Construction1p · 1 filing · 3 docs
1 job · most recent 06/25/2025
Sprinkler System
FiledStatusContractorScope
06/25/2025——Sprinkler System
1 job · most recent 06/25/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
06/25/2025Signed-offT.N.T. PLBG & HTG, INCGas, Plumbing-Sprinkler, Water/Sanitary
5 jobs · most recent 04/13/2022
General Wiring
FiledStatusContractorScope
04/13/2022Permit IssuedROBERT CHIMENTI36 meters, 1 new_meters
08/19/2021Permit IssuedBOROWIDE ELECT'L CONTR'S—
12/09/2019Permit IssuedNEKA ELECTRIC INCGeneral Wiring
06/28/2019CancelledDEMAND ELECTRIC INC—
10/02/2018Permit IssuedGREEN POWER ELECTRIC CORP—
1 job · most recent 10/01/2025
Suspended Scaffold
FiledStatusContractorScope
10/01/2025Signed-offUPHOLD CONSTRUCTION CORPSuspended Scaffold
1 job · most recent 10/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/01/2025Signed-offUPHOLD CONSTRUCTION CORPSuspended Scaffold (SC)
Building Lifecycle
All (106)Filed (10)Permit Issued (11)Signed Off (1)Facade (FISP) (9)Violation (60)Inspection (8)Special Inspection (7)
06/07/2026
Violation issued (ECB, open)
Unknown
05/27/2026
Cycle 10 facade report submitted
05/20/2026
Cycle 10 facade report signed — UNSAFE
05/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/04/2026
Signed off — Alteration
M00581622-I1
04/30/2026
Cycle 10 facade inspection completed
01/20/2026
Permit issued — Sidewalk Shed
M01338782-I1-SH
01/08/2026
Violation issued (ECB, closed)
Boilers
12/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/23/2025
Filed — Alteration
M01338782-I1
12/04/2025
Violation issued (ECB, closed)
Construction
11/13/2025
Permit issued — General Construction
M01258300-I1-GC
10/24/2025
Violation issued (ECB, open)
Construction
10/22/2025
Permit issued — Sidewalk Shed
M00581622-I1-SH
10/03/2025
Filed — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
M01258300-I1
10/03/2025
Permit issued — Suspended Scaffold
M01296159-I1-SC
10/01/2025
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith.
M01296159-I1
09/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/25/2025
Filed — Alteration
INSTALLING 6 WASHING MACHINES AND 3 DRYERS FOR BUILDING USE ONLY. NO CHANGE IN EGRESS OR OCCUPANCY.
M01169961-P1
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/21/2025
Cycle 10 facade report submitted
05/21/2025
Cycle 10 facade report signed — UNSAFE
04/30/2025
Cycle 10 facade inspection completed
04/24/2025
Violation issued (ECB, open)
Local Law
04/23/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/03/2025
Permit issued — Plumbing
M01169961-S1-PL
03/03/2025
Permit issued — General Construction
M01169961-I1-GC
02/03/2025
Filed — Alteration
INSTALLING 6 WASHING MACHINES AND 3 DRYERS FOR BUILDING USE ONLY. NO CHANGE IN EGRESS OR OCCUPANCY.
M01169961-S1
02/03/2025
Filed — Alteration
INSTALLING 6 WASHING MACHINES AND 3 DRYERS FOR BUILDING USE ONLY. NO CHANGE IN EGRESS OR OCCUPANCY.
M01169961-I1
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
mike polychroniades
01/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
mike polychroniades
01/21/2025
Special inspection requirement — Final
FOTIOS PAPAMICHAEL
10/25/2024
Permit issued — Sidewalk Shed
M00581622-I1-SH
08/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2023
Permit issued — Sidewalk Shed
M00581622-I1-SH
08/16/2023
Filed — Alteration
Filing application for repairs of existing ramp. No change to use, egress or occupancy.
M00906285-I1
05/30/2023
Filed — Alteration
M00830026-I1
03/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
02/15/2023
Special inspection requirement — Final
Angel Ayón
11/01/2022
Permit issued — Sidewalk Shed
M00581622-I1-SH
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2022
Violation issued (ECB, open)
Construction
01/31/2022
Violation issued (ECB, open)
Construction
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2021
Permit issued — Sidewalk Shed
M00581622-I1-SH
08/24/2021
Filed — Alteration
M00581622-I1
06/15/2021
Violation issued (ECB, closed)
Elevators
06/15/2021
Violation issued (ECB, closed)
Elevators
06/15/2021
Violation issued (ECB, closed)
Elevators
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 106 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKMAN MANAGEMENT1207/08/2026
BS GROUP407/08/2026
10505 69TH AVENUE1007/08/2026
UPHOLD CONSTRUCTION404/09/2026
ALMA REALTY CORP503/22/2026
4101 BROADWAY OWNER LLC303/22/2026
20 BULING LANE BOX 4-1103/22/2026
BROADWAY TOWER NYC LLC2803/22/2026
C/O NEWCASTLE REALTY SERV103/22/2026
BROADWAY TOWERS OWNER1603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$11.6M—— → —$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP112/23/2025
RICHARD KOENIGSBERG110/03/2025
OSPINO ENGINEERING PLLC110/01/2025
ALMA REALTY CORP306/25/2025
AYON STUDIO ARCHITECTURE AND PRESER208/16/2023
ENTHINK ENGINEERS LLC108/24/2021
JOEL PHAGOO P.E. PLLC110/04/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALMA REALTY403/21/2026
HIERARCH-E203/21/2026
A1 EXPEDITING SERVICE203/21/2026
AC BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1207/08/2026
LUIS JIMENEZElectrical103/21/2026
NEKA ELECTRIC INCElectrical103/22/2026
ROBERT CHIMENTIElectrical103/22/2026
BS GROUP INCGeneral Contractor107/08/2026
UPHOLD CONSTRUCTION CORPGeneral Contractor107/08/2026
VORDONIA CONTRACTING & SUPPLIESGeneral Contractor107/08/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
JIMENEZ LUISElectrical103/21/2026
VARSITY PLBG & HTG INCPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KOENIGSBERG ENGINEERING,2247110/03/2025
MIKE POLYCHRONIADES8407210/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedUPHOLD CONSTRUCTION CORP11/13/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/22/2025
DOB NOWSuspended ScaffoldSigned-offUPHOLD CONSTRUCTION CORP10/03/2025
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedVORDONIA CONTRACTING & SU03/03/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/25/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/31/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/01/2022
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/25/2021
DOB NOWSidewalk ShedPermit IssuedBS GROUP INC10/05/2018
BISOTISSUEDAKSH QUALITY CONTRACTING02/28/2019
BISPLISSUEDJUST PLBG & HTG INC08/03/2017
BISOTISSUEDPROGENY RESTORATION CORP06/30/2017
BISPLISSUEDJUST PLBG & HTG INC05/16/2017
BISOTISSUEDPROGENY RESTORATION CORP04/27/2017
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/28/2017
BISPLISSUEDEZ RUNER CONSTRUCTION CORP12/06/2016
BISPLISSUEDEZ RUNER CONSTRUCTION CORP12/06/2016
BISOTISSUEDPROGENY RESTORATION CORP10/19/2016
BISOTISSUEDEZ RUNER CONSTRUCTION COR06/21/2016
BISPLISSUEDEZ RUNER CONSTRUCTION CORP06/21/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC05/26/2016
BISOTISSUEDLAND DESIGN STUDIO INC04/21/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/04/2016
BISPLISSUEDORION PLUMBING & HTG CORP06/19/2015
BISOTISSUEDOVQ CONSOLIDATED INC06/18/2015
BISPLISSUEDEZ RUNER CONSTRUCTION CORP05/26/2015
BISOTISSUEDEZ RUNER CONSTRUCTION COR05/26/2015
BISPLISSUEDEZ RUNER CONSTRUCTION CORP05/22/2015
BISOTISSUEDEZ RUNER CONSTRUCTION COR05/22/2015
BISPLISSUEDJOHNNY'S P&H CONTRAC INC12/10/2014
BISOTISSUEDV TECH CONST SERV LLC11/06/2014
BISOTISSUEDSASCO CONSTRUCTION ENTER07/31/2013
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/02/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/01/2011
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/02/2009
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE12/11/2008
BISMHISSUEDBCI COMMUNICATIONS, INC.01/06/2006
BISMHISSUEDBERLINER COMM. INC.08/01/2005
+ 1 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/23/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/09/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/27/2025Tenant Protection Plan Compliance—special
05/22/2025Tenant Protection Plan Compliance—special
01/29/2025Fire-Resistant Penetrations and Jointsmike polychroniadesspecial
01/29/2025Tenant Protection Plan Compliancemike polychroniadesspecial
01/21/2025FinalFOTIOS PAPAMICHAELprogress
03/08/2023Tenant Protection Plan Compliance—special
02/15/2023FinalAngel Ayónprogress
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/06/2026M00084071-I1Request digital key ↗
09/03/2026M00581622-I1Request digital key ↗
08/31/2026M00830026-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION27
06/27/2019123893233Open ↗
02/28/2019123549598Open ↗
08/10/2017121226119Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
05/07/2019123893233Open ↗
06/15/2018123549598Open ↗
06/27/2017121226119Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
11/29/2019123893233Open ↗
05/07/2019123893233Open ↗
03/15/2019123549598Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00581622-I1Open ↗
08/31/2026M00830026-I1Open ↗
08/29/2026M00906285-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/22/2016122814375Open ↗
03/17/2016122646903Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/22/2016122814375Open ↗
03/17/2016122646903Open ↗
12/16/2014140292573Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/23/2013121714911Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026M01169961-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026M01169961-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/27/2017121226119Open ↗
04/20/2017123018643Open ↗
06/10/2016122750825Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
09/09/2015122337293Open ↗
08/31/2015122366616Open ↗
08/20/2015122361434Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes7
05/07/2019123893233Open ↗
06/15/2018123549598Open ↗
04/20/2017123018643Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
05/07/2019123893233Open ↗
05/07/2019123893233Open ↗
02/27/2019123549598Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026M01169961-S1Open ↗
08/13/2026M01169961-I1Open ↗
08/13/2026M01258300-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
11/29/2019123893233Open ↗
05/07/2019123893233Open ↗
03/15/2019123549598Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/29/2019123893233Open ↗
03/15/2019123549598Open ↗
12/19/2017123018643Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/29/2019123893233Open ↗
03/15/2019123549598Open ↗
12/19/2017123018643Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/07/2017122361434Open ↗
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT21
11/29/2019123893233Open ↗
05/07/2019123893233Open ↗
03/15/2019123549598Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
04/22/2016122651861Open ↗
06/12/2015122361434Open ↗
12/16/2014140292573Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET12
05/07/2019123893233Open ↗
06/15/2018123549598Open ↗
06/27/2017121226119Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM3
11/29/2019123893233Open ↗
03/15/2019123549598Open ↗
12/19/2017123018643Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
12/16/2014140292573Open ↗
11/03/2014140275903Open ↗
Showing 2 of 3 on file for this type
▸BISADDITIONAL INFORMATION2
06/27/2017121226119Open ↗
08/31/2015122337293Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01296159-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01296159-I1Open ↗