BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Alexander Court Condominium
4102 13TH AVENUE · Borough Park · BIN 3412923
💬 Discuss this project
2007Year Built
6Stories
RMBuilding Class
R6Zoning
38,043 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized15 Active Violations 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The Alexander Court Condominium · 8,115 sf lot · 4.69 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAT&T12p · 5 filings · 20 docs
Floor 6AT&T3p · 1 filing · 15 docs
Floor 5AT&T3p · 1 filing · 15 docs
Floor 4AT&T3p · 1 filing · 15 docs
Floor 3AT&T3p · 1 filing · 15 docs
Floor 2AT&T, DaVita8p · 3 filings · 20 docs
Floor 1AT&T3p · 1 filing · 15 docs
CellarAT&T5p · 1 filing · 15 docs
Sub-Basement4102 13th Avenue Development LLC2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4102 13th Avenue Development3309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cohen Enterprises405/11/2026
New Age109/04/2024
Tecton Architects103/13/2024
KMB Design Group106/20/2022
Azimuth Engineering203/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen403/21/2026
Construction Permit Services103/21/2026
Jenny Flores Expediting103/21/2026
Bohler Engineering103/21/2026
CCM Services Group303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Digital Construction TechnologiesGeneral Contractor404/09/2026
Ramapo CommunicationGeneral Contractor303/21/2026
Sweet & LoweGeneral Contractor303/21/2026
Hydro MechanicalPlumbing207/30/2026
Spectrum ConnectionsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cohen Enterprises & Amp; E9511405/11/2026
New Age Engineering7746109/04/2024
KMB Design Group513106/20/2022
Jeremy K McKeon, P.E7263203/22/2021
Building Lifecycle
All (88)Filed (9)Permit Issued (7)Signed Off (2)Violation (48)Inspection (1)Objection (8)Special Inspection (13)
08/11/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/29/2026
Permit issued — Plumbing
B01172100-S2-PL
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLAN COHEN
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALLAN COHEN
05/11/2026
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B01172100-P1
05/08/2026
Violation issued (HPD, open)
A
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLAN COHEN
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/13/2025
Violation issued (HPD, open)
A
06/12/2025
Permit issued — Plumbing
B01172100-S2-PL
06/11/2025
Permit issued — Antenna
B01172100-I1-AN
06/11/2025
Permit issued — Mechanical Systems
B01172100-S1-MS
05/16/2025
Objection resolved — Addressed
05/09/2025
Objection raised — Structural
04/23/2025
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B01172100-S1
04/23/2025
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B01172100-I1
04/23/2025
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B01172100-S2
04/08/2025
Violation issued (ECB, open)
Local Law
11/27/2024
Violation issued (HPD, closed)
I
10/23/2024
Signed off — Alteration
INSTALL NEW CONDENSERS AND AIR HANDLER UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B01081545-I1
10/21/2024
Permit issued — Mechanical Systems
B01081545-I1-MS
09/04/2024
Filed — Alteration
INSTALL NEW CONDENSERS AND AIR HANDLER UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B01081545-I1
09/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
09/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
07/16/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
07/16/2024
Special inspection requirement — Final
Stephen Shishko
07/16/2024
Special inspection requirement — Maintenance information
Stephen Shishko
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2024
Violation issued (HPD, open)
A
03/13/2024
Filed — Alteration
B00989107-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/11/2024
Special inspection requirement — Final
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2023
Violation issued (HPD, closed)
I
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Violation issued (HPD, open)
A
12/02/2022
Signed off — Alteration
B00511066-I1
08/02/2022
Permit issued — Antenna
B00511066-I1-AN
06/20/2022
Filed — Alteration
B00511066-I1
05/17/2022
Permit issued — Antenna
B00407185-I1-AN
03/22/2021
Filed — Alteration
B00464310-I1
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
11/02/2020
Objection resolved — Addressed
11/02/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
11/02/2020
Objection resolved — Addressed
11/02/2020
Objection raised — 2014-AN BC 1704-Building Code-
11/02/2020
Objection resolved — Addressed
10/30/2020
Filed — Alteration
INSTALLATION OF (4) NEW ANTENNA SECTORS AND (1) EQUIPMENT CABINET ON THE ROOFTOP (STARRY - S-NYCBRK0045-C) AS PER PLANS. ALL WORK IS IN COMPLIANCE WITH TPPN 5/98. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00407185-I1
09/28/2020
Violation issued (ECB, closed)
Elevators
12/18/2019
Violation issued (ECB, closed)
Elevators
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHydro Mechanical07/29/2026
DOB NOWPlumbingSigned-offHydro Mechanical06/12/2025
DOB NOWAntennaPermit IssuedDigital Construction Technologies06/11/2025
DOB NOWMechanical SystemsPermit IssuedDigital Construction Technologies06/11/2025
DOB NOWMechanical SystemsSigned-offSweet & Lowe10/21/2024
DOB NOWAntennaPermit IssuedSpectrum Connections08/02/2022
DOB NOWAntennaPermit IssuedRamapo Communication05/17/2022
BISOTISSUEDParker Service Industries09/18/2017
BISOTISSUEDParker Service Industries09/18/2017
BISOTISSUEDParker Service Industries09/15/2017
BISOTISSUEDConstruction Resources12/09/2016
BISOTISSUEDConstruction Resources08/10/2016
BISPLISSUEDAlessandro Plumbing08/10/2016
BISPLISSUEDAccurate Mechanical10/01/2009
BISPLISSUEDAccurate Mechanical08/05/2008
BISEQISSUEDOcean Ave Construction04/08/2008
BIS—ISSUEDOcean Ave Construction04/08/2008
BISEQISSUEDOcean Ave Construction01/09/2008
BISEQISSUEDOcean Ave Construction03/16/2007
BIS—ISSUEDOcean Ave Construction03/16/2007
BISEQISSUEDOcean Ave Construction01/04/2007
BIS—ISSUEDOcean Ave Construction10/24/2006
BISEQISSUEDOcean Ave Construction10/24/2006
1 project · most recent 05/11/2026
Generators
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Permit IssuedDigital Construction TechnologiesGenerators
Generators
Accardi Companies MD101-1/4 REG-48V-ODE-AT&T Pump ×1
Polar Power 8220-100-NG/LPG-20-03 Generator ×1
1 project · most recent 05/11/2026
Gas
FiledStatusContractorScope
05/11/2026Signed-offHydro MechanicalGas
6 projects · most recent 09/24/2026
General Wiring Lighting
FiledStatusContractorScope
09/24/2026Permit IssuedJ.H. Electric of New YorkGeneral Wiring
11/19/2025Permit IssuedCiti-Wide ElectricGeneral Wiring
11/29/2022Permit IssuedStar Electrical Contractors—
08/29/2022Permit IssuedTimothy Coleman LicensedGeneral Wiring
06/25/2021CompleteCandela Systems Corp DbaLighting
01/23/2020Permit IssuedContact Plus ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/14/2026Fire-Resistant Penetrations and JointsALLAN COHENspecial
05/14/2026Tenant Protection Plan ComplianceALLAN COHENspecial
03/03/2026Fire-Resistant Penetrations and JointsALLAN COHENspecial
03/03/2026Tenant Protection Plan Compliance—special
09/04/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
09/04/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
07/16/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/16/2024Tenant Protection Plan ComplianceStephen Shishkospecial
07/16/2024Mechanical SystemsStephen Shishkospecial
07/16/2024FinalStephen Shishkoprogress
07/16/2024Maintenance informationStephen Shishkoenergy_progress
01/11/2024Tenant Protection Plan Compliance—special
01/11/2024Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteCellar, Floors 1–6, Roof
Project B01172100 Alteration · Permit Entire · 04/23/2025
DaVitaMedical / HealthcareFloor 2
Project B00989107 Alteration · Approved · 03/13/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/29/2026B00511066-I1Request digital key ↗
08/25/2026B00989107-I1Request digital key ↗
08/24/2026B01081545-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00464310-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026B00407185-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
09/22/2017321624051Open ↗
09/22/2017321624060Open ↗
09/20/2017321624042Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/08/2017321624051Open ↗
08/08/2017321624060Open ↗
08/08/2017321624042Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00407185-I1Open ↗
09/01/2026B00464310-I1Open ↗
08/29/2026B00511066-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026B01172100-P1Open ↗
09/01/2026B01172100-S2Open ↗
09/01/2026B01172100-S2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/08/2017321624051Open ↗
08/08/2017321624042Open ↗
05/13/2016321379254Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B01081545-I1Open ↗
08/28/2026B01081545-I1Open ↗
08/28/2026B01081545-I1Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
08/08/2017321624051Open ↗
08/08/2017321624060Open ↗
08/08/2017321624060Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/08/2017321624042Open ↗
05/13/2016321379254Open ↗
05/13/2016321379254Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/13/2016321379254Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026B00407185-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00407185-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00464310-I1Open ↗
08/17/2026B01172100-P1Open ↗
08/17/2026B01172100-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/13/2016321379254Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00511066-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
08/10/2017321624060Open ↗
08/10/2017321624042Open ↗
08/10/2017321624051Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/31/2018321624060Open ↗
05/31/2018321624051Open ↗
05/31/2018321624042Open ↗