Office with commercial, 1-6 stories
4102 14 AVENUE
BROOKLYN · BIN 3135746
💬 Discuss this project
1930Year Built
4Stories
O5Building Class
R6Zoning
37,565 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: HAMASPIK OF KINGS COUNTY, INC. · 6,414 sf lot · 5.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof31p · 2 filings · 20 docs
Floor 628p · 1 filing · 20 docs
Floor 528p · 1 filing · 20 docs
Floor 430p · 1 filing · 20 docs
Floor 328p · 1 filing · 20 docs
Floor 229p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAMASPIK OF KINGS COUNTY, INC.9507/08/2026
OWNERS REP1707/08/2026
OWNER OF 4102 14 AVE103/22/2026
OWNER OF KLEIN EMBROIDING103/22/2026
TRI-STATE CONTRACTING OF*403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1203/21/2026
THE GREEN STUDIO303/21/2026
CITY EXPEDITING1003/21/2026
D R BROWN203/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK MAJOR CONSTRUCTIGeneral Contractor3307/08/2026
GWT ENTERPRISES INCGeneral Contractor707/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor707/08/2026
STAR COMPANIESS LLCGeneral Contractor303/21/2026
CREATIVE PLUMBING INPlumbing207/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
SGI VISUALSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161412/08/2025
SHAHRISH SHUVO ENGINEERIN8524112/06/2022
Building Lifecycle
All (212)Filed (21)Permit Issued (24)Signed Off (12)Violation (35)Inspection (10)Objection (80)Special Inspection (30)
03/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-I1
02/04/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S4
01/09/2026
Special inspection requirement — Metering
FAHAD FATEH
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
01/09/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/09/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/09/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
01/09/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/09/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/09/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
01/09/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/09/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/09/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
12/30/2025
Objection resolved — Addressed
12/26/2025
Objection raised — Other
12/26/2025
Objection resolved — Addressed
12/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/24/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
12/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-A2
11/18/2025
Objection raised — Plumbing
11/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-A1
11/05/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/05/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/05/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
08/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S8
08/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S3
08/06/2025
Permit issued — Mechanical Systems
B08032050-S3-MS
07/03/2025
Objection raised — Admin
07/03/2025
Objection raised — Admin
06/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-P8
05/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-P7
04/30/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S1
04/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/24/2024
Permit issued — Structural
B08032050-S1-ST
12/24/2024
Permit issued — General Construction
B08032050-I1-GC
12/13/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S6
11/06/2024
Permit issued — Plumbing
B08032050-S4-PL
11/01/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/08/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOLDIER PILEAS, WALER, AND LATERAL BRACING FOR THE PROPOSED EXCAVATION WORK.
B08032050-S7
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNEW YORK MAJOR CONSTRUCTI08/06/2025
DOB NOWStructuralSigned-offNEW YORK MAJOR CONSTRUCTI12/24/2024
DOB NOWGeneral ConstructionPermit IssuedNEW YORK MAJOR CONSTRUCTI12/24/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC11/06/2024
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC09/10/2024
DOB NOWGeneral ConstructionPermit IssuedNEW YORK MAJOR CONSTRUCTI08/23/2024
DOB NOWSupport of ExcavationSigned-offNEW YORK MAJOR CONSTRUCTI07/05/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP05/24/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC01/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES12/14/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/12/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES12/12/2023
DOB NOWConstruction FenceSigned-offNEW YORK MAJOR CONSTRUCTI11/30/2023
DOB NOWPlumbingSigned-offAB PLUMBING INC11/09/2023
DOB NOWFoundationSigned-offNEW YORK MAJOR CONSTRUCTI10/13/2023
DOB NOWFoundationSigned-offNEW YORK MAJOR CONSTRUCTI10/13/2023
DOB NOWStructuralSigned-offNEW YORK MAJOR CONSTRUCTI10/12/2023
DOB NOWEarth WorkSigned-offNEW YORK MAJOR CONSTRUCTI10/11/2023
DOB NOWFoundationSigned-offNEW YORK MAJOR CONSTRUCTI09/18/2023
DOB NOWGeneral ConstructionPermit IssuedNEW YORK MAJOR CONSTRUCTI08/29/2023
DOB NOWSupport of ExcavationSigned-offNEW YORK MAJOR CONSTRUCTI05/30/2023
DOB NOWConstruction FenceSigned-offSTAR COMPANIESS LLC03/10/2023
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI01/09/2018
BISPLISSUEDJODOM MECHANICAL, INC05/25/2017
BISEQISSUEDNEW YORK MAJOR CONSTRUCTI03/28/2017
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI03/20/2017
BISEQISSUEDTRI-STATE CONTRACTING OF*03/20/2017
BISEQISSUEDTRI-STATE CONTRACTING OF*03/17/2017
BISPLISSUEDJODOM MECHANICAL, INC01/29/2014
BIS—RE-ISSUEDA.M.A HOLDINGS INC06/21/2013
BIS—RE-ISSUEDA.M.A HOLDINGS INC06/21/2013
BISPLISSUEDJODOM MECHANICAL, INC12/19/2012
BIS—ISSUEDCONPLEX CONSTRUCTION, INC12/18/2012
BISEQISSUEDCONPLEX CONSTRUCTION, INC12/18/2012
BIS—ISSUEDCONPLEX CONSTRUCTION, INC06/14/2012
BISEQISSUEDCONPLEX CONSTRUCTION, INC06/05/2012
BISOTISSUEDKLEIN TORAH'S INC01/27/2000
1 project · most recent 12/08/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/08/2025Signed-offNEW YORK MAJOR CONSTRUCTIHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric Mitsubishi - PURY-EP216TNU-A1 216,000 BTU · Vrf Outdoor ×2
MITSUBISHI - PUY-A24NHA7 24,000 BTU · Condensing Unit ×1
Mitsubishi - PURY-EP240TNU-A1 168,000 BTU · Vrf Outdoor ×1
Mitsubishi- PUHY-EP168TNU-A1 168,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck MINIVENT-450-VG 330 CFM · Erv ×1
Renewaire RENEW AIRE - LE6XRT 3,720 CFM · Erv ×1
1 project · most recent 12/08/2025
Sprinkler System
FiledStatusContractorScope
12/08/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 12/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/08/2025Signed-offCREATIVE PLUMBING INGas, Storm, Water/Sanitary
3 projects · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025CompleteABZ ELECTRIC INCGeneral Wiring
03/06/2024CompleteJAM ELECTRICAL CORP—
05/29/2023CompleteTRUE POWER ELECL CONT LLC—
1 project · most recent 12/08/2025
Steel Concrete
FiledStatusContractorScope
12/08/2025Signed-offNEW YORK MAJOR CONSTRUCTISteel, Concrete
1 project · most recent 12/08/2025
Fence
FiledStatusContractorScope
12/08/2025Signed-offNEW YORK MAJOR CONSTRUCTIFence
1 project · most recent 12/08/2025
Earthwork
FiledStatusContractorScope
12/08/2025Signed-offNEW YORK MAJOR CONSTRUCTIEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/13/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/21/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
01/09/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
01/09/2026Fenestration air leakageYounes Abouyaalaenergy_progress
01/09/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
01/09/2026Interior lighting powerFAHAD FATEHenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/09/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/09/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/09/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/09/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
01/09/2026MeteringFAHAD FATEHenergy_progress
01/09/2026Fenestration areasYounes Abouyaalaenergy_progress
01/09/2026Lighting controlsFAHAD FATEHenergy_progress
01/09/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/09/2026Maintenance informationFAHAD FATEHenergy_progress
01/09/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/09/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/09/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/09/2026Air barrier — testing Younes Abouyaalaenergy_progress
12/24/2025Post-installed AnchorsFAHAD FATEHspecial
12/24/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/24/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/24/2025Maintenance informationFAHAD FATEHenergy_progress
12/24/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/24/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
Latest 25 of 95.
▾Documents — 339 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/27/2026B08032050-I1Request digital key ↗
08/26/2026B00930139-I1Request digital key ↗
08/26/2026B00976049-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION19
09/25/2023340887892Open ↗
08/17/2017321527905Open ↗
04/11/2017321527905Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION12
05/30/2017321356331Open ↗
03/27/2017340485996Open ↗
03/22/2017321356331Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
11/16/2017321356331Open ↗
11/16/2017321356331Open ↗
06/15/2017321356331Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/05/2017321356331Open ↗
▸Zoning, Tax Lot & Property Records14
▸BISADDRESS: NEW HOUSE NUMBER APPROVED5
04/12/2018321356331Open ↗
03/21/2018321356331Open ↗
03/14/2018321356331Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B08032050-P4Open ↗
08/13/2026B08032050-A1Open ↗
08/13/2026B08032050-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B08032050-P4Open ↗
08/13/2026B08032050-A1Open ↗
08/13/2026B08032050-I1Open ↗
▸BISZONING DIAGRAM1
07/27/2016321356331Open ↗
▸BISZoning Diagram (ZD1)1
02/24/2012320349618Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08032050-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/27/2026B08032050-I1Open ↗
08/26/2026B00976049-P1Open ↗
08/26/2026B00976049-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/28/2026B08032050-A1Open ↗
09/28/2026B08032050-A1Open ↗
09/28/2026B08032050-A1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/12/2018321356331Open ↗
03/12/2018321356331Open ↗
02/21/2018340481286Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026B08032050-A1Open ↗
09/28/2026B08032050-A1Open ↗
09/01/2026B08032050-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/25/2023340887892Open ↗
03/27/2017340485996Open ↗
03/16/2017340481525Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/27/2017340485996Open ↗
03/16/2017340481525Open ↗
03/16/2017340481286Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/27/2017340485996Open ↗
03/16/2017340481525Open ↗
03/16/2017340481286Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/27/2013320776914Open ↗
06/27/2013320776923Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/27/2013320776914Open ↗
06/27/2013320776923Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/25/2023340887892Open ↗
▸Trade Schedules & Equipment41
▸BISSELF-CERT PLUMBING NOTICE10
05/08/2015320349618Open ↗
04/29/2015320349618Open ↗
06/09/2014320349618Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
03/16/2018321356331Open ↗
03/16/2018321356331Open ↗
03/16/2018321356331Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
06/09/2014320349618Open ↗
06/09/2014320349618Open ↗
06/09/2014320349618Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/29/2013320349618Open ↗
02/22/2012320349618Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/11/2017321356331Open ↗
03/25/2016321356331Open ↗
06/05/2014320349618Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B3
04/29/2015320349618Open ↗
04/29/2015320349618Open ↗
04/29/2015320349618Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B08032050-I1Open ↗
08/13/2026B08032050-P4Open ↗
08/13/2026B08032050-A1Open ↗
▸BISWATER METER PERMIT : DEP-METER2
04/29/2015320349618Open ↗
04/29/2015320349618Open ↗
▸BISEQUIPMENT USE PERMITS2
03/16/2018321356331Open ↗
05/20/2014320349618Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
04/06/2018321527905Open ↗
03/14/2014320520888Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
12/18/2013320349618Open ↗
12/18/2013320349618Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST3
09/25/2023340887892Open ↗
07/25/2016321356331Open ↗
Showing 2 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
03/16/2017340481525Open ↗
03/16/2017340481286Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/22/2017321356331Open ↗
03/25/2016321356331Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/14/2018321356331Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
03/22/2017321356331Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08032050-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08032050-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08032050-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/27/2026B08032050-I1Open ↗
08/19/2026B08032050-A2Open ↗
08/19/2026B08032050-A1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/25/2016321356331Open ↗
06/27/2013320776914Open ↗
06/27/2013320776923Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/12/2018321356331Open ↗
03/12/2018321356331Open ↗
03/22/2017321356331Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
03/10/2014320349618Open ↗
02/27/2012320349618Open ↗
▸BISEN2 - As Built Energy Analysis2
03/10/2014320349618Open ↗
03/12/2018321356331Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/16/2017340481286Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08032050-S4Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/16/2017340481525Open ↗
03/16/2017340481286Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B08032050-S2Open ↗
08/13/2026B08032050-S6Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B08032050-S2Open ↗
08/13/2026B08032050-S6Open ↗
▸BISHYDRO FLOW TEST LETTER1
02/22/2012320349618Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/24/2018321356331Open ↗
04/12/2018321527905Open ↗
02/21/2018340481286Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
03/25/2016321356331Open ↗
08/29/2013320349618Open ↗
09/10/2013320349618Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/27/2013320776914Open ↗
06/27/2013320776923Open ↗
08/02/2012320520888Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/21/2018340481286Open ↗
02/09/2018340481286Open ↗
06/04/2014320349618Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
04/29/2015320349618Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/08/2015320349618Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
04/12/2018321527905Open ↗
03/14/2018321356331Open ↗
04/11/2017321527905Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/22/2017321356331Open ↗
12/19/2012320349618Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION9
03/26/2018321356331Open ↗
03/14/2018321356331Open ↗
12/07/2017321356331Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET9
04/11/2017321527905Open ↗
07/06/2016321356331Open ↗
03/29/2016321356331Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
04/24/2018321356331Open ↗
04/12/2018321527905Open ↗
02/21/2018340481286Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/25/2023340887892Open ↗
03/27/2017340485996Open ↗
03/16/2017340481525Open ↗
Showing 3 of 4 on file for this type
▸Other Documents20
▸BISPLOT DIAGRAM5
04/12/2018321356331Open ↗
03/21/2018321356331Open ↗
07/25/2016321356331Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B08032050-I1Open ↗
08/13/2026B08032050-P4Open ↗
08/13/2026B08032050-A1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B08032050-P4Open ↗
08/13/2026B08032050-A1Open ↗
08/13/2026B08032050-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/27/2026B08032050-I1Open ↗
08/19/2026B08032050-A1Open ↗
08/19/2026B08032050-P4Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/25/2016321356331Open ↗
07/25/2016321356331Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B08032050-S5Open ↗
08/13/2026B08032050-S6Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
02/01/2014320349618Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08032050-I1Open ↗