1 Open Violation ▸FISP: No Report FiledFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Roof14p · 1 filing · 20 docs
Floor 614p · 1 filing · 20 docs
Floor 514p · 1 filing · 20 docs
Floor 414p · 1 filing · 20 docs
Floor 314p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Mezzanine14p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
Basement18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES807/08/2026
4102 8TH AVE3203/22/2026
PANTOMIMA-BIG KIDS CARE CORP.1703/22/2026
4023 8TH AVE LLC103/22/2026
4102 8 AVENUE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.611/26/2024
HARRY TENENBAUM,PE110/24/2019
HAIDER ENGINEERING, P.E.106/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEI BUILDINGS SERVICES203/21/2026
JM CONSULTANT STUDIO1203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILLY ENTERPRISES INCGeneral Contractor707/08/2026
CNS CONSTRUCTION INCGeneral Contractor303/21/2026
JUN SAFETY ELECTRICAL INCElectrical103/22/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613711/26/2024
GLOBAL ARCH DESIGN & BUIL3397110/24/2019
Building Lifecycle
All (88)Filed (8)Permit Issued (6)Signed Off (3)Violation (23)Inspection (6)Objection (12)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
06/13/2025
Violation issued (HPD, closed)
A
12/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2024
Special inspection requirement — Permanent certificate
Fran Huang
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
12/05/2024
Special inspection requirement — Interior lighting power
Fran Huang
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
Fran Huang
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
12/05/2024
Special inspection requirement — Mechanical Systems
Fran Huang
12/05/2024
Special inspection requirement — Final
Fran Huang
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
12/05/2024
Special inspection requirement — Air barrier - visual inspection
Fran Huang
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
12/05/2024
Special inspection requirement — Fenestration air leakage
Fran Huang
11/26/2024
Filed — Alteration CO
FILED THIS APPLICATION TO CONVERT EXISTING COMMUNITY FACILITY (O.G.: B, U.G.: 4) TO BE DAY CARE FOR CHILDREN 2 YEAR OLD & ABOVE (O.G.: I-4, U.G.: 3) ON BASEMENT. NEW PARTITION, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. OBTAIN NEW C OF O
B08049994-P3
11/26/2024
Special inspection requirement — Interior lighting power
Fran Huang
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/26/2024
Special inspection requirement — Mechanical Systems
Fran Huang
11/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
11/26/2024
Special inspection requirement — Fenestration air leakage
Fran Huang
11/26/2024
Special inspection requirement — Permanent certificate
Fran Huang
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
11/26/2024
Special inspection requirement — Air barrier - visual inspection
Fran Huang
11/26/2024
Special inspection requirement — Final
Fran Huang
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
11/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2024
Filed — Alteration CO
FILED THIS APPLICATION TO CONVERT EXISTING COMMUNITY FACILITY (O.G.: B, U.G.: 4) TO BE DAY CARE FOR CHILDREN 2 YEAR OLD & ABOVE (O.G.: I-4, U.G.: 3) ON BASEMENT. NEW PARTITION, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. OBTAIN NEW C OF O
B08049994-P2
10/28/2024
Special inspection requirement — Interior lighting power
Fran Huang
10/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
10/28/2024
Special inspection requirement — Permanent certificate
Fran Huang
10/28/2024
Special inspection requirement — Air barrier - visual inspection
Fran Huang
07/11/2024
Filed — Alteration CO
FILED THIS APPLICATION TO CONVERT EXISTING COMMUNITY FACILITY (O.G.: B, U.G.: 4) TO BE DAY CARE FOR CHILDREN 2 YEAR OLD & ABOVE (O.G.: I-4, U.G.: 3) ON BASEMENT. NEW PARTITION, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. OBTAIN NEW C OF O
B08049994-P1
05/20/2024
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH BIS APPLICATION #: B08049994. INSTALL NEW SINK, 3-COMP-SINK, LAVATORY & TOILET ON BASEMENT AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00817288-I1
05/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH BIS APPLICATION #: B08049994. INSTALL NEW SINK, 3-COMP-SINK, LAVATORY & TOILET ON BASEMENT AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00817288-P1
05/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2023
Permit issued — Plumbing
B00817288-I1-PL
04/03/2023
Permit issued — General Construction
B08049994-I1-GC-CX
02/15/2023
Objection resolved — Addressed
02/15/2023
Objection resolved — Addressed
02/14/2023
Objection raised — Other
02/13/2023
Objection raised — Inspections
02/10/2023
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH BIS APPLICATION #: B08049994. INSTALL NEW SINK, 3-COMP-SINK, LAVATORY & TOILET ON BASEMENT AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00817288-I1
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection resolved — Addressed
02/07/2023
Objection raised — Other
02/07/2023
Objection raised — Other
02/07/2023
Objection raised — Other
02/07/2023
Objection raised — Other
01/24/2023
Filed — Alteration CO
FILED THIS APPLICATION TO CONVERT EXISTING COMMUNITY FACILITY (O.G.: B, U.G.: 4) TO BE DAY CARE FOR CHILDREN 2 YEAR OLD & ABOVE (O.G.: I-4, U.G.: 3) ON BASEMENT. NEW PARTITION, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. OBTAIN NEW C OF O
B08049994-I1
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP04/11/2023
DOB NOWGeneral ConstructionPermit IssuedCNS CONSTRUCTION INC04/03/2023
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP10/24/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/09/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC09/25/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC06/08/2018
BISOTISSUEDHIGH QUALITY CONSTRUCTION03/06/2020
BIS—ISSUEDPACIFIC RIM, LLC04/02/2019
BISEQISSUEDPACIFIC RIM, LLC12/26/2018
BIS—ISSUEDPACIFIC RIM, LLC09/27/2018
BISPLISSUEDSO PLUMBING & HEATING INC05/15/2018
BIS—ISSUEDPACIFIC RIM, LLC04/17/2018
BISEQISSUEDPACIFIC RIM, LLC01/05/2018
BISPLISSUEDROCK E SMALL PLBG&HTG INC01/02/2018
BISPLISSUEDH & F PLUMBING INC05/15/2017
BIS—ISSUEDPACIFIC RIM, LLC05/02/2017
BISEQISSUEDBILLY ENTERPRISES INC01/26/2017
BIS—ISSUEDPACIFIC RIM, LLC12/12/2016
BISEQISSUEDPACIFIC RIM, LLC12/12/2016
BIS—ISSUEDEROC CONSTRUCTION INC10/05/2016
BISEQISSUEDEROC CONSTRUCTION INC10/05/2016
BIS—ISSUEDNY DRILLING INC03/04/2016
BIS—ISSUEDNY DRILLING INC08/14/2015
BISEQISSUEDNY DRILLING INC08/14/2015
BISEQISSUEDSKYWORX CONTRACTING INC04/28/2015
BIS—ISSUEDTOTAL STRUCTURE MANAGEMEN04/08/2015
BISEQISSUEDTOTAL STRUCTURE MANAGEMEN02/25/2015
1 project · most recent 11/26/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2024Permit IssuedCNS CONSTRUCTION INCVentilation Systems
Ventilation
Mitsubishi Electric PUMY-HP48NKMU1 48,000 BTU · Vrf Outdoor ×7
4 projects · most recent 04/20/2023
General Wiring
FiledStatusContractorScope
04/20/2023CompleteNEWLINE ELECTRICAL CORPGeneral Wiring
06/27/2019CompleteJUN SAFETY ELECTRICAL INCGeneral Wiring
06/06/2018CompleteWCK ELECTRIC CORP.—
01/16/2018CompleteKWONG MING ELECTRIC INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
12/05/2024Permanent certificateFran Huangenergy_progress
12/05/2024HVAC-R and service water heating system controlsFran Huangenergy_progress
12/05/2024Interior lighting powerFran Huangenergy_progress
12/05/2024Tenant Protection Plan ComplianceFran Huangspecial
12/05/2024Fire-Resistant Penetrations and JointsFran Huangspecial
12/05/2024Mechanical SystemsFran Huangspecial
12/05/2024FinalFran Huangprogress
12/05/2024Energy Code Compliance InspectionsFran Huangprogress
12/05/2024Fire-Resistance Rated ConstructionFran Huangprogress
12/05/2024Air barrier - visual inspectionFran Huangenergy_progress
12/05/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
12/05/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
12/05/2024Fenestration air leakageFran Huangenergy_progress
11/26/2024Interior lighting powerFran Huangenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsFran Huangspecial
11/26/2024Mechanical SystemsFran Huangspecial
11/26/2024Tenant Protection Plan Compliance—special
11/26/2024Energy Code Compliance InspectionsFran Huangprogress
11/26/2024Fire-Resistance Rated ConstructionFran Huangprogress
11/26/2024Fenestration air leakageFran Huangenergy_progress
11/26/2024Permanent certificateFran Huangenergy_progress
11/26/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
11/26/2024Air barrier - visual inspectionFran Huangenergy_progress
11/26/2024FinalFran Huangprogress
11/26/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
Latest 25 of 42.
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/03/2026B00048818-I1Request digital key ↗
08/27/2026B00817288-P1Request digital key ↗
08/23/2026B08049994-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00249665-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION32
09/10/2021321803474Open ↗
03/13/2020322068739Open ↗
01/27/2020322031065Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION18
03/11/2020322068739Open ↗
06/26/2019320915113Open ↗
05/15/2018320915113Open ↗
Showing 3 of 18 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/12/2018320915113Open ↗
▸Zoning, Tax Lot & Property Records18
▸BISZONING EXHIBIT I: CERTIFICATION2
02/01/2020322031065Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
11/27/2019320915113Open ↗
08/15/2019320915113Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
02/01/2020322031065Open ↗
02/01/2020322031065Open ↗
▸DOB NOWRestrictive Declaration/Easement 32
08/13/2026B08049994-I1Open ↗
08/13/2026B08049994-P3Open ↗
▸DOB NOWRestrictive Declaration/Easement 42
08/13/2026B08049994-P3Open ↗
08/13/2026B08049994-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026B08049994-I1Open ↗
08/13/2026B08049994-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B08049994-P3Open ↗
08/13/2026B08049994-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B08049994-I1Open ↗
08/13/2026B08049994-P3Open ↗
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08049994-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature31
08/25/2026B08049994-P2Open ↗
08/25/2026B08049994-P2Open ↗
08/25/2026B08049994-P2Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/11/2020322068739Open ↗
11/08/2019321114815Open ↗
11/08/2019321114815Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/25/2026B08049994-P2Open ↗
08/25/2026B08049994-P2Open ↗
08/22/2026B08049994-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00048818-I1Open ↗
08/27/2026B00817288-I1Open ↗
08/23/2026B08049994-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/11/2020322068739Open ↗
01/24/2017340463260Open ↗
04/28/2015321114815Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/11/2020322068739Open ↗
04/28/2015321114815Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/24/2017340463260Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING16
08/01/2019320915113Open ↗
08/01/2019320915113Open ↗
07/30/2019320915113Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/29/2019320915113Open ↗
11/29/2019320915113Open ↗
▸BISGAS CUT-OFF2
04/14/2015321213076Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/15/2019320915113Open ↗
06/26/2019321803508Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
07/26/2019320915113Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
08/15/2019320915113Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
08/14/2015320915113Open ↗
04/14/2015321213076Open ↗
04/14/2015321213076Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist4
08/23/2026B08049994-P3Open ↗
08/23/2026B08049994-P1Open ↗
08/23/2026B08049994-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
01/24/2017340463260Open ↗
03/11/2020322068739Open ↗
▸BISSTREET TREE SIGNOFF1
08/15/2019320915113Open ↗
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/14/2015321213076Open ↗
▸BISRODENT CONTROL1
04/14/2015321213076Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/25/2020322068739Open ↗
07/26/2019320915113Open ↗
07/26/2019320915113Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/25/2020322068739Open ↗
11/08/2019321114815Open ↗
08/05/2019321803508Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/11/2020322068739Open ↗
07/24/2019320915113Open ↗
07/24/2019320915113Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/25/2020322068739Open ↗
11/14/2019320915113Open ↗
07/26/2019320915113Open ↗
Showing 3 of 8 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
12/12/2019320915113Open ↗
11/27/2019320915113Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/01/2019320915113Open ↗
08/14/2015320915113Open ↗
▸BISSOIL REPORT2
07/11/2019320915113Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/14/2015320915113Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
06/25/2020322068739Open ↗
12/12/2019320915113Open ↗
11/27/2019320915113Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
12/06/2019320915113Open ↗
12/03/2019320915113Open ↗
10/30/2019320915113Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER5
05/15/2018320915113Open ↗
01/02/2018320915113Open ↗
01/02/2018320915113Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/14/2015320915113Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL2
04/14/2015321213076Open ↗
04/14/2015321213076Open ↗
▸BISSHED LETTER1
06/25/2019340463260Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
08/15/2019320915113Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT6
06/25/2020322068739Open ↗
03/11/2020322068739Open ↗
11/08/2019321114815Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
05/26/2017320915113Open ↗
12/13/2016320915113Open ↗
08/14/2015320915113Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/14/2015320915113Open ↗
▸Filing & Intake Forms35
▸BISBOROUGH INTAKE FORM14
09/10/2021321803474Open ↗
12/12/2019320915113Open ↗
11/27/2019320915113Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET11
03/13/2020322068739Open ↗
03/11/2020322068739Open ↗
01/27/2020322031065Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
06/13/2016320915113Open ↗
01/22/2016320915113Open ↗
12/18/2015320915113Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/24/2017340463260Open ↗
Showing 1 of 2 on file for this type
▸BISSRO INTAKE FORM(SRO1)1
04/14/2015321213076Open ↗
▸BISAI1 Objections Response1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents15
▸DOB NOWProperty Ownership Certification4
08/23/2026B08049994-P3Open ↗
08/23/2026B08049994-P1Open ↗
08/23/2026B08049994-P2Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
02/01/2020320915113Open ↗
08/15/2019320915113Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/15/2019320915113Open ↗
▸BISSITE SURVEY: FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
01/24/2017340463260Open ↗
▸BISSITE SURVEY: INITIAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00048818-I1Open ↗