← Back
Predominantly retail with other uses
411 8 AVENUE
MANHATTAN · BIN 1013535
💬 Discuss this project
1901Year Built
4Stories
K4Building Class
C6-3XZoning
6,520 sfGross Floor Area
1Units
Rent Stabilized32 Open Violations ▸
Predominantly retail with other uses · Owner of record: 411 RIGGIO LLC · 2,469 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar6p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALPHA GROUP NY1107/10/2026
RIGGO REALTY CORP503/22/2026
411 RIGGIO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB107/09/2026
KING ARCHITECT, PLLC401/23/2026
ZENITH HOME INSPECTIONS101/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICKLAUS F. LAUERElectrical103/21/2026
NICKLAUS LAUERElectrical103/21/2026
ALPHA GROUP NY1 CORPGeneral Contractor107/10/2026
BEYER CONSTRUCTION CORPGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
A1 SPECIALIZED, INCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738201/23/2026
Building Lifecycle
All (77)Filed (7)Permit Issued (5)Signed Off (1)Violation (43)Inspection (6)Special Inspection (15)
09/18/2026
Permit issued — Suspended Scaffold
M01449976-I1-SC
08/22/2026
Filed — Alteration
INSTALLATION OF OITRIGGER OR FACADE REPAIR.
M01449976-I1
07/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01428100-I1
07/09/2026
Permit issued — Sidewalk Shed
M01428100-I1-SH
04/29/2026
Violation issued (HPD, open)
A
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/23/2026
Filed — Alteration
HEREBY FILING PLUMBING WORK AT EATING/DRINKING ESTABLISHMENT AT GROUND FLOOR AS PER PLANS.
M01135727-P1
01/23/2026
Filed — Alteration
HEREBY FILING GENERAL CONSTRUCTION AND MECHANICAL WORK INCLUDING HOOD AND DUCTWORK FOR COMMERCIAL KITCHEN EATING/DRINKING ESTABLISHMENT AT GROUND FLOOR.
M01135605-P1
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/20/2026
Special inspection requirement — Mechanical Systems
anthony santoro
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/20/2026
Special inspection requirement — Final
anthony santoro
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
01/20/2026
Special inspection requirement — Interior lighting power
anthony santoro
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2025
Signed off — Alteration
M01155098-I1
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
02/25/2025
Permit issued — Plumbing
M01135727-I1-PL
01/14/2025
Permit issued — Sign
M01155098-I1-SG
01/08/2025
Filed — Alteration
M01155098-I1
12/16/2024
Permit issued — Mechanical Systems
M01135605-I1-GC-CX
12/05/2024
Filed — Alteration
HEREBY FILING PLUMBING WORK AT EATING/DRINKING ESTABLISHMENT AT GROUND FLOOR AS PER PLANS.
M01135727-I1
12/05/2024
Filed — Alteration
HEREBY FILING GENERAL CONSTRUCTION AND MECHANICAL WORK INCLUDING HOOD AND DUCTWORK FOR COMMERCIAL KITCHEN EATING/DRINKING ESTABLISHMENT AT GROUND FLOOR.
M01135605-I1
11/22/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, open)
I
02/15/2022
Violation issued (HPD, open)
I
02/15/2022
Violation issued (HPD, open)
A
04/01/2021
Violation issued (HPD, open)
I
04/01/2021
Violation issued (HPD, open)
A
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2019
Violation issued (HPD, open)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2017
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDOSANJH CONSTRUCTION CORP09/18/2026
DOB NOWSidewalk ShedPermit IssuedALPHA GROUP NY1 CORP07/09/2026
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS02/25/2025
DOB NOWSignSigned-offMAD SIGNS INC01/14/2025
DOB NOWMechanical SystemsPermit IssuedBEYER CONSTRUCTION12/16/2024
BISOTISSUEDLEMAZIA CONSTRUCTION INC10/27/2017
BISFPISSUEDCITYWIDE FIRE SYS PLBG EN05/13/2016
BISPLISSUEDKATAN P & H INC07/17/2012
BISOTISSUEDC.G.& M MGMT AND DEMO COR07/11/2012
BISEQISSUEDC.G.& M MGMT AND DEMO COR07/10/2012
BISOTISSUEDVERDE & SON BRICK CORP01/20/2012
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM IN04/20/1993
BISOTISSUEDW.C.L. CONSTRUCTION INC.04/19/1993
1 project · most recent 01/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/23/2026Permit IssuedBEYER CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Gree 4LIV18HP230V1AH 19,100 BTU · Ahu ×4
MULTI36HP230V1EO 36,000 BTU · Condensing Unit ×2
1 project · most recent 01/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/23/2026Permit IssuedDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
3 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedRICHARD NEU—
03/06/2025Permit IssuedLIMITLESS ELECT RESOURCESGeneral Wiring
01/08/2025CompleteALL PRO ELEC. OF N.Y. INC—
1 project · most recent 07/09/2026
Sidewalk Shed
FiledStatusContractorScope
07/09/2026Permit IssuedALPHA GROUP NY1 CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/23/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/23/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/23/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/23/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/20/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
01/20/2026Mechanical Systemsanthony santorospecial
01/20/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/20/2026Finalanthony santoroprogress
01/20/2026Fire-Resistance Rated Constructionanthony santoroprogress
01/20/2026Interior lighting poweranthony santoroenergy_progress
01/20/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/20/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/20/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/20/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/20/2026Energy Code Compliance Inspectionsanthony santoroprogress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026M01155098-I1Request digital key ↗
08/25/2026M01449976-I1Request digital key ↗
08/19/2026M01135727-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION7
10/27/2017123066332Open ↗
05/25/2016122766710Open ↗
05/25/2016122766710Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/07/2017123066332Open ↗
04/22/2016122766710Open ↗
06/05/2012121096429Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026M01155098-I1Open ↗
08/19/2026M01135605-I1Open ↗
08/19/2026M01135605-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M01135727-P1Open ↗
08/30/2026M01135727-I1Open ↗
08/30/2026M01135727-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/07/2017123066332Open ↗
05/25/2016122766710Open ↗
06/04/2012121096429Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/07/2017123066332Open ↗
04/22/2016122766710Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/07/2017123066332Open ↗
04/22/2016122766710Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026M01135605-P1Open ↗
08/26/2026M01135605-P1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/04/2012121096429Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist6
08/16/2026M01428100-I1Open ↗
08/13/2026M01155098-I1Open ↗
08/13/2026M01135605-P1Open ↗
Showing 3 of 6 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
10/27/2017123066332Open ↗
06/10/2016122766710Open ↗
▸BISTenant Protection Plan and Notes1
10/27/2017123066332Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
07/03/2012121096429Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026M01135605-P1Open ↗
08/19/2026M01135605-I1Open ↗
08/13/2026M01135727-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/27/2017123066332Open ↗
04/22/2016122766710Open ↗
06/04/2012121096429Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/21/2011120865812Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/07/2017123066332Open ↗
06/10/2016122766710Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/21/2011120865812Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/04/2012121096429Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/07/2017123066332Open ↗
04/22/2016122766710Open ↗
06/04/2012121096429Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
08/07/2017123066332Open ↗
04/20/2016122766710Open ↗
06/04/2012121096429Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/25/2026M01449976-I1Open ↗
▸DOB NOWCalculations1
08/25/2026M01449976-I1Open ↗