← Back
Elevator cooperative
411 8 AVENUE
BROOKLYN · BIN 3025530
💬 Discuss this project
1922Year Built
6Stories
D4Building Class
R7BZoning
49,188 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized7 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 401 8TH AVENUE TENANTS CORP · 11,785 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
Structural
Floor 51p · 1 filing · 5 docs
Floor 4
Floor 31p · 1 filing · 3 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NARROWS MANAGEMENT OF BAY RIDGE INC903/22/2026
401 8TH AVENUE TENANTS4703/22/2026
CANTOR REAL ESTATE103/22/2026
DIVERSIFIED PROPERTY M103/22/2026
EXPERT ENTRPRISES INC503/21/2026
LIDO REALTY603/21/2026
401 8 AVENUYE TENENT203/21/2026
ALL-SAFE LLC203/21/2026
401_8TH AVENUE103/21/2026
LINDO REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERMAN ENGINEERING307/23/2024
JOSH MANES ARCHITECTURE, DPC206/13/2023
WAKE DESIGN ARCHITECTURE PLLC110/22/2021
ERIC WORCESTER ARCHITECT303/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC203/21/2026
BIG ORANGE EXPEDITING203/21/2026
DOMANI CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TMS PLBG & HEATING CORPPlumbing507/08/2026
J.A.J CONTRACTING CORPGeneral Contractor407/08/2026
THE LINE CONSTRUCTION INCGeneral Contractor303/21/2026
UNITED CONSTRUCTION AND DESIGNGeneral Contractor303/21/2026
EH PLUMBING & HEATING CORPlumbing207/08/2026
RAPPO, FRANKElectrical103/21/2026
CEESAY, BELALElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
WK RENOVATION CORPGeneral Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SERMAN ENGINEERING4685307/23/2024
GREGORY V. PEROTTO, P.E.947110/22/2021
ERIC WORCESTER ARCHITECT2396203/17/2021
Building Lifecycle
All (94)Filed (9)Permit Issued (14)Signed Off (8)Violation (57)Inspection (4)Special Inspection (2)
05/30/2025
Signed off — Alteration
B00190054-I1
04/07/2025
Permit issued — Plumbing
B00190054-I1-PL
08/13/2024
Signed off — Alteration
B01079438-I1
08/05/2024
Permit issued — Structural
B01079438-I1-ST
07/23/2024
Filed — Alteration
B01079438-I1
12/04/2023
Signed off — Alteration
REPAIR AND REINFORCEMENT OF THE EXISTING FLOOR FRAMING AT THE 5TH FLOOR IN APT 52 IN THE BATHROOM AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
B08041180-I1
06/13/2023
Filed — Alteration
B00190054-P1
05/03/2023
Violation issued (HPD, open)
C
05/03/2023
Violation issued (HPD, open)
C
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, open)
A
05/03/2023
Violation issued (HPD, open)
B
04/29/2023
Violation issued (HPD, closed)
B
04/29/2023
Violation issued (HPD, closed)
C
01/23/2023
Permit issued — Structural
B08041180-I1-ST
01/17/2023
Permit issued — Plumbing
B00190054-I1-PL
01/04/2023
Filed — Alteration
REPAIR AND REINFORCEMENT OF THE EXISTING FLOOR FRAMING AT THE 5TH FLOOR IN APT 52 IN THE BATHROOM AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
B08041180-I1
11/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHAD SERMAN
11/16/2022
Special inspection requirement — Final
CHAD SERMAN
06/29/2022
Signed off — Alteration
B00480798-I1
06/22/2022
Signed off — Alteration
B00484353-I1
06/16/2022
Permit issued — General Construction
B00484353-I1-GC
06/07/2022
Signed off — Alteration
B00609844-I1
05/26/2022
Signed off — Alteration
B00313665-I1
05/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2022
Permit issued — General Construction
B00609844-I1-GC
04/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/15/2022
Permit issued — Plumbing
B00190054-I1-PL
11/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/26/2021
Signed off — Alteration
B00586926-I1
10/25/2021
Permit issued — Plumbing
B00480798-I1-PL
10/22/2021
Filed — Alteration
B00609844-I1
09/29/2021
Permit issued — Structural
B00586926-I1-ST
09/14/2021
Filed — Alteration
B00586926-I1
07/15/2021
Violation issued (ECB, closed)
Elevators
05/13/2021
Permit issued — Plumbing
B00480798-I1-PL
04/29/2021
Permit issued — General Construction
B00484353-I1-GC
03/22/2021
Filed — Alteration
B00480798-I1
03/17/2021
Filed — Alteration
B00484353-I1
02/08/2021
Permit issued — Plumbing
B00190054-I1-PL
06/29/2020
Permit issued — Plumbing
B00313665-I1-PL
04/01/2020
Filed — Alteration
B00313665-I1
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
C
12/06/2019
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (HPD, closed)
A
12/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2019
Permit issued — Plumbing
B00190054-I1-PL
07/23/2019
Filed — Alteration
B00190054-I1
12/07/2017
Violation issued (HPD, closed)
B
12/07/2017
Violation issued (HPD, closed)
A
01/12/2017
Violation issued (HPD, closed)
C
01/12/2017
Violation issued (HPD, closed)
B
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP04/07/2025
DOB NOWStructuralSigned-offTHE LINE CONSTRUCTION INC08/05/2024
DOB NOWStructuralSigned-offUNITED CONSTRUCTION AND01/23/2023
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP01/17/2023
DOB NOWGeneral ConstructionSigned-offJ.A.J CONTRACTING CORP06/16/2022
DOB NOWGeneral ConstructionSigned-offWK RENOVATION CORP04/11/2022
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP02/15/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR10/25/2021
DOB NOWStructuralSigned-offJ.A.J CONTRACTING CORP09/29/2021
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR05/13/2021
DOB NOWGeneral ConstructionSigned-offJ.A.J CONTRACTING CORP04/29/2021
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP02/08/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN06/29/2020
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP09/04/2019
BISOTISSUEDNICHIBI ORGANIZATION INC09/28/2020
BISOTISSUEDNICHIBI ORGANIZATION INC06/13/2020
BISOTISSUEDKBRNY, INC04/03/2020
BISOTISSUEDKBRNY, INC08/17/2019
BISOTISSUEDDECO BUILDING GROUP CORP11/14/2018
BISOTISSUEDDECO BUILDING GROUP CORP11/13/2018
BISPLISSUEDRRP PLUMBING CORP08/31/2018
BISOTISSUEDDECO BUILDING GROUP CORP08/08/2018
BISPLISSUEDA.M.N. CORPORATION10/02/2017
BISOTISSUEDPOLER CONTRACTING INC09/13/2017
BISPLISSUEDORBIT PLBG & HTG INC07/21/2017
BISOTISSUEDHARPER DESIGN BUILD INC07/21/2017
BISOTISSUEDRISSAT CONSTRUCTION CORP01/31/2017
BISPLISSUEDORBIT PLBG & HTG INC08/03/2016
BISOTISSUEDHARPER DESIGN BUILD INC08/02/2016
BISMHISSUEDWAI KEE CONSTRUCTION INC10/09/2015
BISOTISSUEDWAI KEE CONSTRUCTION INC10/09/2015
BISOTISSUEDCOMMERCIAL BUILDING AND R05/21/2015
BISOTISSUEDCOMMERCIAL BUILDING AND R10/15/2014
BISOTISSUEDWAI KEE CONSTRUCTION INC07/31/2014
BISPLISSUEDFLYTIGER P & H LTD07/22/2014
BISOTISSUEDWAI KEE CONSTRUCTION INC07/11/2014
BISOTISSUEDBAKER DESIGN BUILD LLC12/30/2013
BISOTISSUEDHNS CONSTRUCTION CORP10/03/2013
BISOTISSUEDWING LEE CONTRACTOR INC08/05/2013
BISPLISSUEDDYCKMAN PLBG AND HTG INC07/26/2013
+ 24 more permits on file
7 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteVALENTIS ELECTRIC, INC.General Wiring
10/07/2025CompleteASCUATECH ELECTRICAL CORP—
05/05/2025Permit IssuedDENALI ELECTRIC CORP—
05/04/2022CompleteBELMONT ELECTRICAL, INCGeneral Wiring
07/07/2020CompleteR & T ELECTRICAL CORPGeneral Wiring
01/16/2020CompleteHI-RITE ELECTRIC CORPGeneral Wiring
09/06/2019CompleteGSA ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/16/2022Structural Stability – Alterations of existing buildingsCHAD SERMANspecial
11/16/2022FinalCHAD SERMANprogress
▾Documents — 397 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
09/01/2026B00484353-I1Request digital key ↗
09/01/2026B00480798-I1Request digital key ↗
09/01/2026B00586926-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00190054-I1Request digital key ↗
09/02/2026B00313665-I1Request digital key ↗
08/15/2026B00190054-P1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION36
01/04/2024301754340Open ↗
09/21/2023301754340Open ↗
09/12/2023301754340Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION33
09/28/2020340765639Open ↗
06/13/2020322028355Open ↗
04/06/2020340687901Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
11/20/2017321637065Open ↗
06/13/2017321304593Open ↗
01/27/2016321120032Open ↗
▸DOB NOWState DEC Permit2
08/13/2026B00190054-P1Open ↗
08/13/2026B00190054-I1Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
01/15/2020322028355Open ↗
08/09/2019320822213Open ↗
06/28/2019320822213Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00484353-I1Open ↗
09/01/2026B00480798-I1Open ↗
09/01/2026B00586926-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/15/2020340765639Open ↗
11/15/2018321074528Open ↗
08/24/2017321637065Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
11/15/2018321074528Open ↗
08/24/2017321637065Open ↗
01/11/2017321253291Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/08/2021340806701Open ↗
09/15/2020340765639Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/15/2020340765639Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/08/2021340806701Open ↗
07/25/2019340687901Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/11/2017321253291Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B08041180-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B08041180-I1Open ↗
▸Trade Schedules & Equipment24
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
08/02/2018321806774Open ↗
11/22/2017321637065Open ↗
08/24/2017321637065Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/09/2016321120032Open ↗
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes8
03/13/2020322028355Open ↗
07/25/2019340687901Open ↗
11/15/2018321074528Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026B00190054-P1Open ↗
08/13/2026B00313665-I1Open ↗
08/13/2026B00190054-I1Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/11/2017321253291Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
09/15/2020340765639Open ↗
06/13/2020322028355Open ↗
07/25/2019340687901Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026B00609844-I1Open ↗
08/24/2026B01079438-I1Open ↗
08/13/2026B00313665-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00484353-I1Open ↗
09/01/2026B00480798-I1Open ↗
09/01/2026B00586926-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
01/15/2020322028355Open ↗
06/28/2019320822213Open ↗
06/28/2019320822213Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
05/26/2022322028355Open ↗
02/01/2022322028355Open ↗
09/28/2021321074528Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/19/2024340687901Open ↗
06/07/2023340687901Open ↗
05/26/2022322028355Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
03/08/2021340806701Open ↗
09/15/2020340765639Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00484353-I1Open ↗
08/13/2026B00480798-I1Open ↗
08/13/2026B00609844-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/07/2023340687901Open ↗
▸BISLIGHTING IN DWELLING UNITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY13
01/19/2024340687901Open ↗
06/07/2023340687901Open ↗
05/26/2022322028355Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/04/2019321806774Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
06/03/2025340687901Open ↗
11/02/2022322028355Open ↗
10/14/2021321074528Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
08/24/2017321637065Open ↗
06/28/2016321304593Open ↗
Showing 2 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/03/2025340687901Open ↗
09/23/2022322028355Open ↗
05/31/2022322028355Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT34
05/26/2022322028355Open ↗
02/01/2022322028355Open ↗
09/28/2021321074528Open ↗
Showing 3 of 34 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/10/2023340687901Open ↗
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET16
01/15/2020322028355Open ↗
11/15/2018321074528Open ↗
08/02/2018321806774Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION13
09/02/2022322028355Open ↗
10/16/2020321806774Open ↗
08/07/2019340687901Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM8
04/02/2020321806774Open ↗
03/16/2020321806774Open ↗
09/14/2019320822213Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
03/08/2021340806701Open ↗
09/15/2020340765639Open ↗
07/25/2019340687901Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
09/28/2021321074528Open ↗
▸DOB NOWDHCR Document1
08/13/2026B00313665-I1Open ↗