Two family converted from one family · 1,800 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Interior Renovation of Existing Two Family Dwelling, Propose8p · 2 filings · 20 docs
Floor 1Interior Renovation of Existing Two Family Dwelling, Propose8p · 2 filings · 20 docs
CellarInterior Renovation of Existing Two Family Dwelling, Propose13p · 2 filings · 20 docs
Sub-BasementInterior Renovation of Existing Two Family Dwelling, Propose8p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2023$2.1M—THROOP ITANU LLC → Private party$913/sf building
03/09/2022$1.1M—Private party → THROOP ITANU LLC$485/sf building
01/24/2017$925K—Private party → Private party$408/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose L. Pena, P.E.601/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
East Enders NYCspecialty_contractor303/21/2026
Morell BuildersGeneral Contractor107/08/2026
Plumbing P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781601/18/2023
Building Lifecycle
01/31/2023
Signed off — Alteration
NEW FURNACE , NEW HWH, PROPOSE LAUNDRY AT BASEMENT AND SECOND FLOOR. REPLACE/RELOCATE KITCHEN AND BATHROOM FIXTURES.
B00680211-I1
01/31/2023
Signed off — Alteration
B00680128-I1
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/18/2023
Filed — Alteration
NEW FURNACE , NEW HWH, PROPOSE LAUNDRY AT BASEMENT AND SECOND FLOOR. REPLACE/RELOCATE KITCHEN AND BATHROOM FIXTURES.
B00680211-P3
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMorell Builders09/22/2022
DOB NOWPlumbingSigned-offPlumbing P & H07/15/2022
DOB NOWMechanical SystemsSigned-offEast Enders NYC03/03/2022
1 project · most recent 01/12/2023
General Wiring
FiledStatusContractorScope
01/12/2023CompleteAccurate ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/19/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/18/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/12/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/12/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/12/2023FinalCHRISTIAN LOZADAprogress
01/12/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/12/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/12/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/12/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
01/12/2023Mechanical SystemsCHRISTIAN LOZADAspecial
01/12/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/09/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/13/2022FinalCHRISTIAN LOZADAprogress
12/13/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
12/13/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/13/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/13/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
12/13/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
12/13/2022Mechanical SystemsCHRISTIAN LOZADAspecial
12/13/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/13/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial