← Back
BuildNYC
Elevator apt, fireproof without stores
Msgr. John O'brien Apts
4112 FORT HAMILTON PARKWAY · BIN 3135596
💬 Discuss this project
1988Year Built
9Stories
D3Building Class
R6Zoning
77,652 sfGross Floor Area
113Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Msgr. John P. O'Brien Senior Housing de Velopment · 28,548 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLivonia C3 HDFC4p · 5 filings · 20 docs
CellarLivonia C3 HDFC3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Caring Communities Associates1003/21/2026
MSGR, John P. O'Brien, HDFC803/21/2026
Msgr. John O'Brien Apartments703/21/2026
Livonia C3 HDFC504/09/2026
Msgr. John P. O'Brien Senior Housing de Velopment103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Synergic Design Architects212/01/2025
Elevated Engineering305/18/2023
Scherer Design Group108/28/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group303/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Overland ContractingGeneral Contractor1107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Accord PowerGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Synergic Design8561212/01/2025
Elevated Engineering3692305/18/2023
Building Lifecycle
All (96)Filed (6)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (52)Objection (6)Special Inspection (10)
02/09/2026
Signed off — Alteration
Installation of 38.07 kw solar energy system on roof. No change of occupancy, use or egress
B01189915-I1
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
12/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
12/21/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
12/21/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
12/11/2025
Cycle 10 facade report signed — SAFE
12/01/2025
Filed — Alteration
Installation of 38.07 kw solar energy system on roof. No change of occupancy, use or egress
B01189915-P1
11/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
11/25/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
11/25/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
11/22/2025
Cycle 10 facade inspection completed
09/11/2025
Cycle 10 facade report submitted
05/01/2025
Violation issued (ECB, open)
Local Law
04/02/2025
Permit issued — Solar
B01189915-I1-SL
03/26/2025
Filed — Alteration
Installation of 38.07 kw solar energy system on roof. No change of occupancy, use or egress
B01189915-I1
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Signed off — Alteration
AT&T - Replace antennas and RRHs on roof. Relocate sector with new RRH and removed RRH on roof. Retrofit of cabinet and remove RRHs in equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00677730-I1
05/18/2023
Filed — Alteration
AT&T - Replace antennas and RRHs on roof. Relocate sector with new RRH and removed RRH on roof. Retrofit of cabinet and remove RRHs in equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00677730-P1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2022
Permit issued — Antenna
B00677730-I1-AN
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/2022
Objection resolved — Addressed
08/16/2022
Objection resolved — Addressed
08/16/2022
Objection resolved — Addressed
08/04/2022
Violation issued (ECB, closed)
Elevators
06/10/2022
Objection raised — Scope
06/10/2022
Objection raised — Inspections
06/10/2022
Objection raised — Zoning
06/08/2022
Filed — Alteration
AT&T - Replace antennas and RRHs on roof. Relocate sector with new RRH and removed RRH on roof. Retrofit of cabinet and remove RRHs in equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00677730-I1
08/02/2021
Permit issued — Antenna
B00258213-I1-AN
06/03/2021
Signed off — Alteration
B00336710-I1
05/07/2021
Violation issued (HPD, closed)
B
04/08/2021
Violation issued (HPD, closed)
A
06/17/2020
Permit issued — Antenna
B00336710-I1-AN
05/27/2020
Filed — Alteration
B00336710-I1
04/09/2020
Permit issued — Antenna
B00258213-I1-AN
11/07/2019
Signed off — Alteration
B00047496-I1
05/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2019
Cycle 8 facade report signed — SAFE
01/11/2019
Permit issued — Antenna
B00047496-I1-AN
01/10/2019
Cycle 8 facade report submitted
12/10/2018
Cycle 8 facade inspection completed
10/15/2018
Violation issued (HPD, closed)
A
08/28/2018
Filed — Alteration
B00047496-I1
03/09/2017
Violation issued (HPD, closed)
A
01/10/2017
Violation issued (HPD, closed)
C
07/05/2016
Violation issued (HPD, closed)
B
09/10/2015
Violation issued (HPD, closed)
A
04/11/2015
Violation issued (HPD, closed)
B
09/19/2014
Violation issued (ECB, closed)
Elevators
04/30/2014
Violation issued (ECB, closed)
Unknown
04/30/2014
Violation issued (ECB, closed)
Elevators
04/30/2014
Violation issued (ECB, closed)
Elevators
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAccord Power04/02/2025
DOB NOWAntennaSigned-offOverland Contracting08/29/2022
DOB NOWAntennaPermit IssuedOverland Contracting08/02/2021
DOB NOWAntennaSigned-offOverland Contracting06/17/2020
DOB NOWAntennaPermit IssuedOverland Contracting04/09/2020
DOB NOWAntennaSigned-offOverland Contracting01/11/2019
BISOTISSUEDBechtel Infrastructure An03/31/2017
BISOTISSUEDBechtel Infrastructure An08/24/2016
BISBLISSUEDMaxwell Plumbing Mechanical12/15/2015
BISOTISSUEDMaxwell Plumbing Mechanical07/17/2015
BISPLISSUEDMaxwell Plumbing Mechanical07/17/2015
BISEQISSUEDEverest Scaffolding10/10/2014
BISOTISSUEDCrosslink Wireless08/29/2011
BISPLISSUEDForte Express P & H07/01/2011
BISOTISSUEDCrosslink Wireless06/16/2011
BISPLISSUEDForte Express P & H07/13/2010
BISPLISSUEDForte Express P & H08/17/2009
BISPLISSUEDForte Express P & H02/02/2009
BISEQISSUEDEverest Scaffolding01/09/2007
BISMHISSUEDMonsen Engineering01/09/2007
BISPLISSUEDForte Express P & H01/09/2007
BISPLISSUEDForte Express P & H01/09/2007
BISOTISSUEDBig Z Builders Inc Dba Artisan Restoration01/02/2007
BISOTISSUEDBig Z Builders Inc Dba Artisan Restoration09/20/2006
BISOTISSUEDMonsen Engineering Company09/14/2006
BISPLISSUEDHydro Mechanical11/21/2003
BISOTISSUEDBig Z Builders Aristan Restoration01/31/2003
BISOTISSUEDBig C Builders Aristan Restoration11/08/2002
BISOTISSUEDTyree Organization11/20/2001
BISMHISSUEDCellular Telephone Co08/02/2000
2 projects · most recent 03/10/2025
FiledStatusContractorScope
03/10/2025CompleteAccord Power Electric—
08/06/2020Permit IssuedNewbridge Electl Contng—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/21/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
12/21/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
12/21/2025FinalMalathi Ananthakrishnanprogress
12/21/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
12/21/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
11/25/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
11/25/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
11/25/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
11/25/2025FinalMalathi Ananthakrishnanprogress
11/25/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026B00047496-I1Request digital key ↗
08/29/2026B00677730-P1Request digital key ↗
08/22/2026B01189915-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00336710-I1Request digital key ↗
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION8
04/07/2017321438093Open ↗
08/25/2016321438093Open ↗
07/22/2015321168222Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/21/2017321438093Open ↗
08/17/2016321438093Open ↗
07/22/2015321168222Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/03/2017321438093Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/12/2017321438093Open ↗
07/12/2017321438093Open ↗
08/17/2016321438093Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026B01189915-I1Open ↗
09/30/2026B01189915-I1Open ↗
09/30/2026B01189915-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B00047496-I1Open ↗
08/29/2026B00677730-P1Open ↗
08/29/2026B00677730-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026B01189915-I1Open ↗
09/30/2026B01189915-I1Open ↗
09/01/2026B01189915-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/22/2015321168222Open ↗
10/07/2014340194701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2014340194701Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/07/2014340194701Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/22/2015321168222Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/22/2015321168222Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/22/2015321168222Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
08/17/2016321438093Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00336710-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026B00047496-I1Open ↗
08/29/2026B00677730-P1Open ↗
08/15/2026B00677730-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/17/2016321438093Open ↗
07/22/2015321168222Open ↗
07/22/2015321168222Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/31/2011320310695Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/17/2016321438093Open ↗
04/21/2016321168222Open ↗
07/22/2015321168222Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/12/2017321438093Open ↗
04/21/2016321168222Open ↗
▸BISTECHNICAL REPORT: ENERGY2
03/16/2012320310695Open ↗
03/16/2012320310695Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2014340194701Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/12/2017321438093Open ↗
04/21/2016321168222Open ↗
03/16/2012320310695Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/12/2017321438093Open ↗
04/21/2016321168222Open ↗
07/08/2015340194701Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/22/2015321168222Open ↗
05/31/2011320310695Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01189915-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
07/12/2017321438093Open ↗
08/17/2016321438093Open ↗
04/21/2016321168222Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
03/21/2017321438093Open ↗
09/25/2015321168222Open ↗
▸BISEFILING COVER SHEET2
08/17/2016321438093Open ↗
07/22/2015321168222Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2014340194701Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/07/2014340194701Open ↗