← Back
Walk-up cooperative
4113 7 AVENUE
BROOKLYN · BIN 3018163
💬 Discuss this project
1921Year Built
4Stories
C6Building Class
R7AZoning
13,188 sfGross Floor Area
16Units
Rent Stabilized32 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: BALTIC HOMES INC · 4,500 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC202/23/2023
LINGINEERING CONSULTING108/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC103/21/2026
QUICK FILING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
RALLY RESTORATION CORPGeneral Contractor203/21/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LINGINEERING CONSULTING E5666108/15/2022
Building Lifecycle
All (74)Filed (3)Permit Issued (3)Signed Off (3)Violation (60)Special Inspection (5)
06/05/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
09/05/2024
Signed off — Alteration
Facade-Brick Replacement, Brick Repointing, Replacement/Refurbishment of Lintels, Replacement of Windowsills, Repair of Fire Escapes scrape, prime, paint. Basement-structural work as per plans submitted.
B00775190-I1
04/03/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
10/25/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00829480-I1
10/25/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00829482-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2023
Violation issued (HPD, closed)
A
02/24/2023
Permit issued — Sidewalk Shed
B00829480-I1-SH
02/24/2023
Permit issued — Supported Scaffold
B00829482-I1-SF
02/23/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00829480-I1
02/23/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00829482-I1
01/11/2023
Permit issued — General Construction
B00775190-I1-GC-CX
11/14/2022
Violation issued (HPD, closed)
I
08/15/2022
Filed — Alteration
Facade-Brick Replacement, Brick Repointing, Replacement/Refurbishment of Lintels, Replacement of Windowsills, Repair of Fire Escapes scrape, prime, paint. Basement-structural work as per plans submitted.
B00775190-I1
07/14/2022
Special inspection requirement — Masonry
Chingyuan Lin
07/14/2022
Special inspection requirement — Post-installed Anchors
Chingyuan Lin
07/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
07/14/2022
Special inspection requirement — Structural Steel - Details
Chingyuan Lin
07/14/2022
Special inspection requirement — Final
Chingyuan Lin
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, open)
B
04/08/2021
Violation issued (HPD, open)
B
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
B
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
B
04/05/2021
Violation issued (HPD, closed)
A
06/07/2020
Violation issued (HPD, open)
A
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
C
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
A
06/07/2020
Violation issued (HPD, closed)
B
06/07/2020
Violation issued (HPD, closed)
A
04/02/2020
Violation issued (HPD, open)
A
04/02/2020
Violation issued (HPD, open)
A
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/25/2016
Violation issued (HPD, open)
A
10/25/2016
Violation issued (HPD, open)
A
10/25/2016
Violation issued (HPD, open)
A
10/25/2016
Violation issued (HPD, open)
C
10/25/2016
Violation issued (HPD, open)
A
06/27/2016
Violation issued (HPD, open)
B
06/27/2016
Violation issued (HPD, closed)
B
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/24/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC02/24/2023
DOB NOWGeneral ConstructionSigned-offRALLY RESTORATION CORP01/11/2023
BISOTISSUEDBROOKLYN SOLARWORKS LLC09/06/2024
BISOTISSUEDBROOKLYN SOLARWORKS LLC09/19/2023
BISPLISSUEDWILLIAM G IAFE INC03/18/2015
BISBLISSUEDWILLIAM G IAFE INC03/18/2015
BISPLISSUEDWILLIAM G IAFE INC12/20/2013
BISBLISSUEDWILLIAM G IAFE INC12/20/2013
2 projects · most recent 10/21/2024
FiledStatusContractorScope
10/21/2024CompleteBROOKYLN SOLARWORKS, LLC1 meters, 1 new_meters
03/01/2023CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/14/2022MasonryChingyuan Linspecial
07/14/2022Post-installed AnchorsChingyuan Linspecial
07/14/2022Structural Stability – Alterations of existing buildingsChingyuan Linspecial
07/14/2022Structural Steel - DetailsChingyuan Linspecial
07/14/2022FinalChingyuan Linprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00775190-I1Request digital key ↗
08/27/2026B00829480-I1Request digital key ↗
08/27/2026B00829482-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
09/19/2023340899950Open ↗
12/28/2013320868717Open ↗
12/28/2013320868717Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
12/11/2024340899950Open ↗
09/19/2023340899950Open ↗
12/28/2013320868717Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00775190-I1Open ↗
08/13/2026B00829482-I1Open ↗
08/13/2026B00829480-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/28/2013320868717Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2023340899950Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/28/2013320868717Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2023340899950Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/28/2013320868717Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B00775190-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00775190-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
05/11/2015320868717Open ↗
▸BISSCHEDULE B - PLUMBING1
12/28/2013320868717Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/14/2016320868717Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/19/2023340899950Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/19/2023340899950Open ↗
12/28/2013320868717Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026B00775190-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/11/2025340899950Open ↗
02/11/2025340899950Open ↗
09/19/2023340899950Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/11/2025340899950Open ↗
06/11/2025340899950Open ↗
02/11/2025340899950Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION2
06/11/2025340899950Open ↗
01/28/2025340899950Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/19/2023340899950Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/28/2013320868717Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/19/2023340899950Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/11/2025340899950Open ↗
02/11/2025340899950Open ↗
09/19/2023340899950Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/11/2025340899950Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/11/2025340899950Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/11/2025340899950Open ↗
06/11/2025340899950Open ↗
02/11/2025340899950Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
12/28/2013320868717Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2023340899950Open ↗
▸BISADDITIONAL INFORMATION1
01/28/2025340899950Open ↗