HPD04/29/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB09/06/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/06/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD03/19/2013§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM
ECB06/13/2017404 PIPING AND /OR EQUIPMENT INSTALLED IMPROPERLY.DURING MY INSPECTIONAT THE ABOVE ADDRESS ON THE ABOVE DATE I OBSERVED IN TJE CELLAR AN IL LEGAL GAS BYPASS.GAS WAS BEING BYPASSED FROM 1ST FLOOR METER TO SUPPLYNothing owed — awaiting certificate of correction
ECB06/13/2017FAILURE TO MAINTIAN BUILDING IN CODE COMPLIANT MANNER.DURING MY INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE I OBSERVED IN THE CELLAR AN ILLEGAL GAS FLEX HOSE BYPASS TO UMP THE METER.UTILTIY HAD ALREADYNothing owed — awaiting certificate of correction
Three families · 2,500 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.