← Back
BuildNYC
Primarily 2 family with 1 store or office
4119 13TH AVENUE
BROOKLYN · Borough Park · BIN 3135716
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
16 Active Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Kosher Mehadrin Operations USA · 1,600 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofKosher Operations2p · 1 filing · 20 docs
Floor 3Kosher Operations57p · 1 filing · 20 docs
Floor 2Kosher Operations64p · 2 filings · 20 docs
Floor 1Kosher Operations76p · 4 filings · 20 docs
CellarKosher Operations80p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services3803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Seamless BuildersGeneral Contractor1007/08/2026
Seamless BuildersScaffold507/08/2026
Verrazano Plumbing ContPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519107/07/2026
City-Wide Testing4161801/27/2026
Building Lifecycle
All (118)Filed (24)Permit Issued (10)Signed Off (9)Violation (25)Inspection (4)Objection (16)Special Inspection (30)
10/19/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION AT CELLARAND FIRST FLOOR, WITH REPLACEMENT FACADE, EXISTING WINDOWS OF EXISTING,MULTIPLE USE, RESIDENTIAL & STORE BUILDING (3) THREE STORY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01402343-S2
10/19/2026
Special inspection requirement — Final
10/19/2026
Special inspection requirement — Mechanical Systems
08/18/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION AT CELLARAND FIRST FLOOR, WITH REPLACEMENT FACADE, EXISTING WINDOWS OF EXISTING,MULTIPLE USE, RESIDENTIAL & STORE BUILDING (3) THREE STORY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01402343-P2
08/18/2026
Special inspection requirement — Permanent certificate
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/18/2026
Special inspection requirement — Maintenance information
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/14/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION AT CELLARAND FIRST FLOOR, WITH REPLACEMENT FACADE, EXISTING WINDOWS OF EXISTING,MULTIPLE USE, RESIDENTIAL & STORE BUILDING (3) THREE STORY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01402343-S1
08/14/2026
Special inspection requirement — Maintenance information
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/14/2026
Special inspection requirement — Permanent certificate
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/07/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION AT CELLARAND FIRST FLOOR, WITH REPLACEMENT FACADE, EXISTING WINDOWS OF EXISTING,MULTIPLE USE, RESIDENTIAL & STORE BUILDING (3) THREE STORY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01402343-I1
02/05/2026
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-I1
01/27/2026
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-A2
01/26/2026
Special inspection requirement — Metering
ELIAS RASABI
01/26/2026
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
01/26/2026
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
01/26/2026
Special inspection requirement — Fenestration areas
ELIAS RASABI
01/26/2026
Special inspection requirement — Lighting controls
ELIAS RASABI
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
01/26/2026
Special inspection requirement — Protection of exposed foundation insulation
ELIAS RASABI
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ELIAS RASABI
01/26/2026
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
01/26/2026
Special inspection requirement — Interior lighting power
ELIAS RASABI
01/26/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
12/17/2025
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-S8
12/02/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-A1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P9
08/11/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P8
07/14/2025
Signed off — Alteration
B01016236-I1
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P7
06/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2025
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-S6
06/17/2025
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-S7
06/17/2025
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-S3
06/05/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P6
06/05/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P5
05/16/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P4
05/02/2025
Filed — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-P3
04/30/2025
Signed off — Alteration
NON-STRUCTURAL DEMOLITION TO REMOVE INTERIOR PARTITION. no change to use, egress nor occupancy
B01010630-I1
04/30/2025
Signed off — Alteration CO
Alteration application full gut renovation and change of use, egress, and occupancy. Horizontal enlargement in cellar.
B01061650-S1
04/30/2025
Signed off — Alteration
B01006192-I1
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2025
Permit issued — Plumbing
B01061650-S8-PL
04/09/2025
Permit issued — Construction Fence
B01016236-I1-FN
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVerrazano Plumbing Cont04/22/2025
DOB NOWConstruction FenceSigned-offSeamless Builders04/09/2025
DOB NOWGeneral ConstructionPermit IssuedSeamless Builders02/25/2025
DOB NOWEarth WorkPermit IssuedSeamless Builders02/11/2025
DOB NOWSupport of ExcavationSigned-offSeamless Builders02/10/2025
DOB NOWFoundationSigned-offSeamless Builders02/10/2025
DOB NOWStructuralPermit IssuedSeamless Builders02/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offSeamless Builders04/22/2024
DOB NOWConstruction FenceSigned-offSeamless Builders04/19/2024
DOB NOWGeneral ConstructionSigned-offSeamless Builders04/19/2024
BISBLISSUEDTavella Plumbing & Heating01/05/2017
BISPLISSUEDTavella Plumbing & Heating01/05/2017
BISPLISSUEDOrion Plumbing & Heating04/09/2009
BISPLISSUEDOrion Plumbing & Heating04/04/2008
BISOTISSUEDWing Sing Cont03/20/2008
1 project · most recent 10/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric Mitsubishi Electric 18,000 BTU ×6
2 projects · most recent 10/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/19/2026——Water/Sanitary
01/27/2026Signed-offVerrazano Plumbing ContGas, Water/Sanitary
1 project · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteS&R Electrical & MechanicalGeneral Wiring
1 project · most recent 01/27/2026
Steel Concrete
FiledStatusContractorScope
01/27/2026Signed-offVerrazano Plumbing ContSteel, Concrete
1 project · most recent 01/27/2026
Earthwork
FiledStatusContractorScope
01/27/2026Signed-offVerrazano Plumbing ContEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
10/19/2026Mechanical Systems—special
10/19/2026Final—progress
08/18/2026Permanent certificate—energy_progress
08/18/2026Maintenance information—energy_progress
08/18/2026HVAC-R and service water heating system controls—energy_progress
08/18/2026HVAC-R and service water piping design and insulation—energy_progress
08/18/2026Energy Code Compliance Inspections—progress
08/18/2026HVAC-R and service water heating equipment—energy_progress
08/18/2026Fire-Resistant Penetrations and Joints—special
08/14/2026HVAC-R and service water heating system controls—energy_progress
08/14/2026Maintenance information—energy_progress
08/14/2026HVAC-R and service water piping design and insulation—energy_progress
08/14/2026HVAC-R and service water heating equipment—energy_progress
08/14/2026Permanent certificate—energy_progress
08/13/2026Energy Code Compliance Inspections—progress
08/13/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Maintenance informationELIAS RASABIenergy_progress
01/26/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
01/26/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
01/26/2026Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
01/26/2026Energy Code Compliance InspectionsELIAS RASABIprogress
01/26/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
01/26/2026Lighting controlsELIAS RASABIenergy_progress
01/26/2026Fenestration areasELIAS RASABIenergy_progress
01/26/2026Air barrier - visual inspectionELIAS RASABIenergy_progress
Latest 25 of 113.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Kosher OperationsOtherCellar, Floors 1–3
Project B01061650 Alteration CO · LOC Issued · 06/18/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/25/2026B01010630-I1Request digital key ↗
08/25/2026B01006192-I1Request digital key ↗
08/25/2026B01016236-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
01/06/2017321505108Open ↗
01/06/2017321505108Open ↗
04/09/2009310091290Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/24/2017321505108Open ↗
01/06/2017321505108Open ↗
02/19/2009310091290Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records27
▸DOB NOWRestrictive Declaration/Easement 117
08/13/2026B01061650-A2Open ↗
08/13/2026B01061650-S3Open ↗
08/13/2026B01061650-P6Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B01061650-I1Open ↗
08/13/2026B01061650-P9Open ↗
08/13/2026B01061650-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/13/2026B01061650-A2Open ↗
08/13/2026B01061650-P9Open ↗
08/13/2026B01061650-P3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026B01061650-S8Open ↗
09/22/2026B01006192-I1Open ↗
09/02/2026B01061650-P9Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
10/20/2026B01402343-S2Open ↗
08/25/2026B01006192-I1Open ↗
08/25/2026B01016236-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B01061650-P9Open ↗
09/02/2026B01061650-P9Open ↗
09/01/2026B01061650-A2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/18/2017321505108Open ↗
01/06/2017321505108Open ↗
12/12/2008310091290Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/06/2017321505108Open ↗
12/31/2008310091290Open ↗
02/13/2008310091290Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/06/2017321505108Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/13/2008310091290Open ↗
▸BISPC FULL REPORT1
02/13/2008310091290Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/06/2017321505108Open ↗
▸BISEQUIPMENT USE PERMITS1
07/07/2009310091290Open ↗
▸BISSCHEDULE B - PLUMBING1
02/19/2009310091290Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/06/2017321505108Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
07/07/2009310091290Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/13/2026B01061650-A2Open ↗
08/13/2026B01061650-P9Open ↗
08/13/2026B01061650-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
01/06/2017321505108Open ↗
▸BISTenant Protection Plan and Notes1
01/06/2017321505108Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
10/20/2026B01402343-S2Open ↗
08/23/2026B01061650-I1Open ↗
08/20/2026B01061650-P4Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/06/2017321505108Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/13/2008310091290Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/18/2017321505108Open ↗
01/06/2017321505108Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/18/2017321505108Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT9
08/13/2026B01061650-P2Open ↗
08/13/2026B01061650-S1Open ↗
08/13/2026B01061650-S7Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026B01061650-S1Open ↗
08/13/2026B01061650-S6Open ↗
08/13/2026B01061650-S7Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
09/18/2017321505108Open ↗
01/16/2009310091290Open ↗
12/12/2008310091290Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/13/2008310091290Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/18/2017321505108Open ↗
01/06/2017321505108Open ↗
12/12/2008310091290Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/18/2017321505108Open ↗
▸BISEFILING COVER SHEET1
01/06/2017321505108Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification5
08/23/2026B01061650-I1Open ↗
08/20/2026B01061650-A2Open ↗
08/20/2026B01061650-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01061650-S6Open ↗
08/13/2026B01061650-S1Open ↗