← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
412 8 AVENUE
BROOKLYN · BIN 3025523
💬 Discuss this project
1920Year Built
4Stories
RMBuilding Class
R7BZoning
29,171 sfGross Floor Area
38Units
Rent Stabilized92 Open Violations 90 unresolved · 2 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 11,787 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 36p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RISSAT CONSTRUCTION1107/08/2026
OWNER OF 412 8TH AVE103/22/2026
DAL 412 8TH AVE403/21/2026
412 420 8TH AVE CONDOMINIUM303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SSA+D304/08/2026
CHAD SERMAN112/17/2024
AK CONSULTING SERVICES, INC203/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
TOP OUT CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC DESIGN & RENO LLCGeneral Contractor407/08/2026
RISSAT CONSTRUCTION CORPGeneral Contractor407/08/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAHARAT SURATTANONT ARCHI1779304/08/2026
SERMAN ENGINEERING4685112/17/2024
AK CONSULTING SERVICES, I6198203/24/2023
Building Lifecycle
All (55)Filed (6)Permit Issued (7)Signed Off (4)Violation (4)Inspection (4)Objection (20)Special Inspection (10)
04/24/2026
Signed off — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-I1
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAHARAT SURATTANONT
04/08/2026
Filed — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-P1
02/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/24/2025
Permit issued — General Construction
B01155449-I1-GC
09/15/2025
Signed off — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-S2
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2025
Permit issued — General Construction
B01155449-I1-GC
04/02/2025
Permit issued — Plumbing
B01155449-S1-PL
01/09/2025
Permit issued — General Construction
B01155449-I1-GC
01/09/2025
Permit issued — Structural
B01155449-S2-ST
01/07/2025
Objection raised — Cost
01/07/2025
Objection resolved — Addressed
12/31/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/27/2024
Objection resolved — Addressed
12/27/2024
Objection resolved — Addressed
12/27/2024
Objection resolved — Addressed
12/27/2024
Objection resolved — Addressed
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Other
12/23/2024
Objection raised — Other
12/23/2024
Objection raised — Inspections
12/20/2024
Objection raised — Scope
12/20/2024
Objection raised — Other
12/20/2024
Objection raised — Scope
12/20/2024
Objection raised — Scope
12/20/2024
Objection raised — Cost
12/17/2024
Filed — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-S2
12/16/2024
Filed — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-I1
12/16/2024
Filed — Alteration
HEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01155449-S1
12/16/2024
Special inspection requirement — Lighting in dwelling units
SAHARAT SURATTANONT
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAHARAT SURATTANONT
12/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHAD SERMAN
12/14/2024
Special inspection requirement — Structural Cold-Formed Steel
CHAD SERMAN
12/14/2024
Special inspection requirement — Structural Steel - Details
CHAD SERMAN
12/14/2024
Special inspection requirement — Final
CHAD SERMAN
12/13/2024
Special inspection requirement — Final
SAHARAT SURATTANONT
07/19/2023
Signed off — Alteration
B00846902-I1
04/04/2023
Permit issued — General Construction
B00846902-I1-GC
03/24/2023
Filed — Alteration
B00846902-I1
03/20/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
09/03/2021
Signed off — Alteration
INTERIOR EXISTING BATHROOM RENOVATION AT APARTMENT # C4 (THIRD FLOOR) INCLUDES TOILET FLOOR AND WALL TILES TO BE REPLACED AND COSMETIC PAINT WORKS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00503165-I1
04/22/2021
Permit issued — General Construction
B00503165-I1-GC
04/14/2021
Filed — Alteration
INTERIOR EXISTING BATHROOM RENOVATION AT APARTMENT # C4 (THIRD FLOOR) INCLUDES TOILET FLOOR AND WALL TILES TO BE REPLACED AND COSMETIC PAINT WORKS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00503165-I1
04/13/2021
Special inspection requirement — Final
MAHFUZAR RAHMAN
04/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
11/05/1999
Violation issued (ECB, closed)
Boilers
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNYC DESIGN & RENO LLC09/24/2025
DOB NOWGeneral ConstructionSigned-offNYC DESIGN & RENO LLC05/12/2025
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP04/02/2025
DOB NOWGeneral ConstructionSigned-offNYC DESIGN & RENO LLC01/09/2025
DOB NOWStructuralSigned-offNYC DESIGN & RENO LLC01/09/2025
DOB NOWGeneral ConstructionSigned-offRISSAT CONSTRUCTION CORP04/04/2023
DOB NOWGeneral ConstructionSigned-offRISSAT CONSTRUCTION CORP04/22/2021
BISBLISSUEDPLUMBING NYC INC04/13/2017
BISPLISSUEDPLUMBING NYC INC04/13/2017
BISPLISSUEDZ.W. PLBG & HTG CORP03/17/2014
BISPLISSUEDERAX PLUMBING, INC01/07/2011
BISOTISSUEDABR MOULDING LLC12/22/2010
BISPLISSUEDGAS APPROVED SERV CORP02/08/2000
BISBLISSUEDGAS APPROVED SERV CORP02/08/2000
1 project · most recent 04/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/08/2026Signed-offAUTHENTIC PLBG CORPGas, Water/Sanitary
3 projects · most recent 04/09/2026
General Wiring
FiledStatusContractorScope
04/09/2026CompleteNELSON & TOM MAINT INC DBGeneral Wiring
03/02/2021CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
12/01/2019CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/09/2026Fire-Resistant Penetrations and JointsSAHARAT SURATTANONTspecial
12/16/2024Lighting in dwelling unitsSAHARAT SURATTANONTenergy_progress
12/16/2024Fire-Resistant Penetrations and JointsSAHARAT SURATTANONTspecial
12/14/2024Structural Stability – Alterations of existing buildingsCHAD SERMANspecial
12/14/2024Structural Cold-Formed SteelCHAD SERMANspecial
12/14/2024Structural Steel - DetailsCHAD SERMANspecial
12/14/2024FinalCHAD SERMANprogress
12/13/2024FinalSAHARAT SURATTANONTprogress
04/13/2021FinalMAHFUZAR RAHMANprogress
04/13/2021Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00503165-I1Request digital key ↗
08/27/2026B00846902-I1Request digital key ↗
08/23/2026B01155449-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
08/15/2019340692995Open ↗
11/21/2017321517658Open ↗
11/02/2017321517658Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
08/22/2019340692995Open ↗
03/10/2017340481259Open ↗
03/10/2017340481259Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/08/2019340692995Open ↗
11/08/2019340692995Open ↗
10/11/2017340481259Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00503165-I1Open ↗
08/27/2026B00846902-I1Open ↗
08/23/2026B01155449-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B01155449-S2Open ↗
08/28/2026B01155449-S2Open ↗
08/28/2026B01155449-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B01155449-S2Open ↗
08/27/2026B00503165-I1Open ↗
08/25/2026B01155449-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/05/2010320221498Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/05/2010320221498Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
07/16/2014320232253Open ↗
07/15/2014320232253Open ↗
06/30/2014320232253Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
03/10/2017340481259Open ↗
10/27/2010320232253Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/22/2017321517658Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/10/2017340481259Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
02/22/2017321517658Open ↗
▸BISSTREET TREE CHECKLIST2
02/22/2017321517658Open ↗
10/27/2010320232253Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00503165-I1Open ↗
08/27/2026B00846902-I1Open ↗
08/23/2026B01155449-S2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
02/22/2017321517658Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/05/2010320221498Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
11/22/2010320232253Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/08/2019340692995Open ↗
11/08/2019340692995Open ↗
10/11/2017340481259Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/08/2019340692995Open ↗
10/11/2017340481259Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISNYCECC ANALYSIS1
08/15/2019340692995Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/10/2017340481259Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/15/2019340692995Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/08/2019340692995Open ↗
10/11/2017340481259Open ↗
07/21/2014320232253Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/27/2010320232253Open ↗
10/05/2010320221498Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/11/2017340481259Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
11/08/2019340692995Open ↗
11/08/2019340692995Open ↗
10/11/2017340481259Open ↗
Showing 3 of 7 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
04/04/2017340481259Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM5
11/08/2019340692995Open ↗
11/21/2017321517658Open ↗
11/02/2017321517658Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/15/2019340692995Open ↗
03/10/2017340481259Open ↗
▸BISEFILING COVER SHEET2
02/22/2017321517658Open ↗
10/27/2010320232253Open ↗