← Back
Primarily 2 family with 1 store or office
412 86 STREET
BROOKLYN · BIN 3153524
💬 Discuss this project
1921Year Built
3Stories
S2Building Class
C4-2AZoning
2,848 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: HL 888 BUILDING LLC · 1,300 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 10 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2022$1.3M—590 UTICA AVENUE REALTY CORP. → HL 888 BUILDING LLC$456/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC603/27/2025
ASR ENGINEERING PC110/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAQ CONSTRUCTION INCGeneral Contractor307/08/2026
HP SERVICES INCPlumbing207/08/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330603/27/2025
Building Lifecycle
All (45)Filed (7)Permit Issued (5)Signed Off (5)Violation (2)Inspection (6)Special Inspection (20)
04/14/2025
Signed off — Alteration
Mechanical work for existing commercial and residential building. No change in use, egress and occupancy.
B01023929-I1
04/07/2025
Signed off — Alteration
Mechanical work for existing commercial and residential building. No change in use, egress and occupancy.
B01023929-S2
04/01/2025
Signed off — Alteration
Plumbing work for existing commercial and residential building. No change in use, egress and occupancy.
B01023977-I1
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
03/31/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
03/31/2025
Special inspection requirement — Lighting controls
Jinfar Liu
03/31/2025
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
03/31/2025
Special inspection requirement — Final
Jinfar Liu
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/28/2025
Signed off — Alteration
INSTALL NEW (3) GAS HOT WATER HEATER, (2) GAS BOILER, AND (1) GAS FURNACE @ CELLAR.
B01023991-I1
03/28/2025
Permit issued — Mechanical Systems
B01023929-S2-MS
03/27/2025
Filed — Alteration
Mechanical work for existing commercial and residential building. No change in use, egress and occupancy.
B01023929-S2
03/27/2025
Filed — Alteration
Mechanical work for existing commercial and residential building. No change in use, egress and occupancy.
B01023929-P1
03/27/2025
Special inspection requirement — Heating Systems
Jinfar Liu
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
03/27/2025
Special inspection requirement — Final
Jinfar Liu
03/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
03/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
03/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
03/27/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
03/24/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/18/2025
Permit issued — Boiler Equipment
B01023991-I1-BE
03/15/2025
Filed — Alteration
INSTALL NEW (3) GAS HOT WATER HEATER, (2) GAS BOILER, AND (1) GAS FURNACE @ CELLAR.
B01023991-I1
03/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01124189-I1
12/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2024
Filed — Alteration
Plumbing work for existing commercial and residential building. No change in use, egress and occupancy.
B01023977-P2
12/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
12/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
12/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
12/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
12/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
12/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/10/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01124189-I1
10/10/2024
Permit issued — Sidewalk Shed
B01124189-I1-SH
08/26/2024
Permit issued — Plumbing
B01023977-I1-PL
08/26/2024
Permit issued — General Construction
B01023929-I1-GC
03/23/2024
Filed — Alteration
Mechanical work for existing commercial and residential building. No change in use, egress and occupancy.
B01023929-I1
03/23/2024
Filed — Alteration
Plumbing work for existing commercial and residential building. No change in use, egress and occupancy.
B01023977-I1
08/18/2012
Violation issued (HPD, closed)
B
04/29/2003
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offZAQ CONSTRUCTION INC03/28/2025
DOB NOWBoiler EquipmentSigned-offHP SERVICES INC03/18/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC10/10/2024
DOB NOWPlumbingSigned-offHP SERVICES INC08/26/2024
DOB NOWGeneral ConstructionSigned-offZAQ CONSTRUCTION INC08/26/2024
BISPLISSUEDLAFATA CORALLO PLUMBING AND HEAT07/20/1992
2 projects · most recent 04/19/2025
General Wiring
FiledStatusContractorScope
04/19/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
10/10/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/31/2025Energy Code Compliance InspectionsJinfar Liuprogress
03/31/2025Interior lighting powerJinfar Liuenergy_progress
03/31/2025Lighting controlsJinfar Liuenergy_progress
03/31/2025Lighting in dwelling unitsJinfar Liuenergy_progress
03/31/2025FinalJinfar Liuprogress
03/31/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
03/27/2025Heating SystemsJinfar Liuspecial
03/27/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
03/27/2025Energy Code Compliance InspectionsJinfar Liuprogress
03/27/2025FinalJinfar Liuprogress
03/27/2025HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
03/27/2025HVAC-R and service water heating system controlsJinfar Liuenergy_progress
03/27/2025HVAC-R and service water heating equipmentJinfar Liuenergy_progress
03/27/2025Mechanical SystemsJinfar Liuspecial
03/15/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
12/12/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
12/12/2024HVAC-R and service water heating system controlsJinfar Liuenergy_progress
12/12/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
12/12/2024Energy Code Compliance InspectionsJinfar Liuprogress
12/12/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B01023977-P2Request digital key ↗
08/25/2026B01023977-I1Request digital key ↗
08/23/2026B01124189-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B01023977-P2Open ↗
08/29/2026B01023977-P2Open ↗
08/29/2026B01023977-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026B01023977-I1Open ↗
08/25/2026B01023977-P2Open ↗
08/22/2026B01023991-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01023991-I1Open ↗
08/29/2026B01023977-P2Open ↗
08/26/2026B01023929-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B01023977-P2Open ↗
08/25/2026B01023977-I1Open ↗
08/22/2026B01023991-I1Open ↗
Showing 3 of 6 on file for this type