← Back
Stand-alone food establishment
4126 HYLAN BOULEVARD
STATEN ISLAND · BIN 5068320
💬 Discuss this project
1968Year Built
1Stories
K5Building Class
R3-1Zoning
4,763 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Stand-alone food establishment · Owner of record: 4126 HYLAN BLVD LLC · 10,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction75p · 2 filings · 20 docs
CellarUnder Construction76p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HYLAN HOLDING LLC103/22/2026
SMITTYS SPORTS INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP1007/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAF GENERAL CONTRACTING CGeneral Contractor303/21/2026
SKEN SERVICES CORPGeneral Contractor309/12/2026
JOSEPH PALETTOElectrical103/21/2026
EMPIRE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957707/16/2026
Building Lifecycle
All (69)Filed (10)Permit Issued (5)Violation (10)Inspection (2)Objection (12)Special Inspection (30)
09/10/2026
Permit issued — Construction Fence
S01456167-I1-FN
07/30/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P7
07/29/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Permit issued — General Construction
S01259179-I1-GC-CX
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Smerina
07/20/2026
Special inspection requirement — Shutoff dampers
Joseph Smerina
07/20/2026
Special inspection requirement — Maintenance information
Joseph Smerina
07/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
Joseph Smerina
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Smerina
07/20/2026
Special inspection requirement — Final
Joseph Smerina
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
07/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Smerina
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Smerina
07/20/2026
Special inspection requirement — Mechanical Systems
Joseph Smerina
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Smerina
07/16/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P6
07/16/2026
Permit issued — General Construction
S01340471-I1-GC-CX
07/15/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Smerina
04/29/2026
Special inspection requirement — Shutoff dampers
Joseph Smerina
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
04/29/2026
Special inspection requirement — Mechanical Systems
Joseph Smerina
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
04/29/2026
Special inspection requirement — Final
Joseph Smerina
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Smerina
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Smerina
04/29/2026
Special inspection requirement — Maintenance information
Joseph Smerina
04/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
Joseph Smerina
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Smerina
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Smerina
04/20/2026
Objection resolved — Resolved
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/19/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P5
02/18/2026
Objection resolved — Resolved
02/18/2026
Objection resolved — Resolved
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/16/2026
Objection raised — Zoning
02/16/2026
Objection raised — Scope
02/16/2026
Objection raised — Structural
02/16/2026
Objection raised — Zoning
02/16/2026
Objection raised — Structural
02/16/2026
Objection raised — Cost
01/23/2026
Filed — Alteration CO
Application filed for alteration of existing one story and cellar building from retail store to restaurant. Work to include structural upgrades for HVAC support, as per plans filed herewith.
S01340471-I1
01/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
01/16/2026
Special inspection requirement — Lighting controls
Joseph Smerina
01/16/2026
Special inspection requirement — Fenestration air leakage
Joseph Smerina
01/16/2026
Special inspection requirement — Maintenance information
Joseph Smerina
01/16/2026
Special inspection requirement — Fenestration areas
Joseph Smerina
01/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Joseph Smerina
01/14/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P4
01/09/2026
Permit issued — Plumbing
S01259179-S1-PL
01/08/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P3
10/14/2025
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P2
10/14/2025
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-P1
08/11/2025
Permit issued — Mechanical Systems
S01259179-I1-GC-CX
07/31/2025
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-S1
07/31/2025
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES FROM TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL NEW PLUMBING FIXTURES AS PER PLAN SET ATTACHED.
S01259179-I1
08/23/2024
Violation issued (FDNY_NOV, closed)
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSKEN SERVICES CORP09/10/2026
DOB NOWGeneral ConstructionPermit IssuedSKEN SERVICES CORP07/21/2026
DOB NOWGeneral ConstructionPermit IssuedSKEN SERVICES CORP07/16/2026
DOB NOWPlumbingPermit IssuedEMPIRE PLUMBING INC01/09/2026
DOB NOWMechanical SystemsPermit IssuedRAF GENERAL CONTRACTING C08/11/2025
BIS—ISSUEDROGERS CALVANICO GROUP PLLC04/19/2023
BISFPISSUEDWILLIAM HIRD & CO., INC.12/28/2006
BISPLISSUEDELITE PLUMBING & HEATING INC12/08/2006
BISMHISSUEDA & B HEATING & AIR CONDI11/01/2006
BISFPISSUEDWILLIAM HIRD & CO., INC.12/08/2005
BISPLISSUEDJ.P. COURY, INC.03/14/2005
BISOTISSUEDCASEY CONST. & MAINTENANCE02/17/2005
BISOTISSUEDFRANK NOTO MASONRY CORP.07/31/1998
BISPLISSUEDSANTI LEMBO PLBG & HTG07/06/1993
BISFPISSUEDALFRED C COLLINS05/07/1993
BISOTISSUEDDAGOSTINO CONST. CO.04/30/1993
BISPLISSUEDSANTI LEMBO PLBG & HTG12/23/1992
BIS—ISSUEDNORTH SHORE NEON SIGN CO.11/05/1992
BISFPISSUEDIDEAL FIRE CONTROL INC.10/30/1992
BISMHISSUEDDAGOSTINO CONST. CO.10/30/1992
1 project · most recent 07/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedEMPIRE PLUMBING INCGas, Water/Sanitary
2 projects · most recent 12/22/2025
General Wiring
FiledStatusContractorScope
12/22/2025Permit IssuedRIVIERA ELECTRIC CORPGeneral Wiring
05/12/2021CompleteMANGI ELECTRICAL CORP1 meters, 1 new_meters
1 project · most recent 01/23/2026
FiledStatusContractorScope
01/23/2026Permit IssuedSKEN SERVICES CORP2 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/29/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
07/20/2026HVAC-R and service water heating system controlsJoseph Smerinaenergy_progress
07/20/2026Shutoff dampersJoseph Smerinaenergy_progress
07/20/2026Maintenance informationJoseph Smerinaenergy_progress
07/20/2026Duct leakage testing, insulation and designJoseph Smerinaenergy_progress
07/20/2026HVAC-R and service water piping design and insulationJoseph Smerinaenergy_progress
07/20/2026FinalJoseph Smerinaprogress
07/20/2026Energy Code Compliance InspectionsJoseph Smerinaprogress
07/20/2026Fire-Resistance Rated ConstructionJoseph Smerinaprogress
07/20/2026Concrete - Cast-In-PlaceJoseph Smerinaspecial
07/20/2026Mechanical SystemsJoseph Smerinaspecial
07/20/2026Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
07/20/2026HVAC-R and service water heating equipmentJoseph Smerinaenergy_progress
07/15/2026Concrete - Cast-In-PlaceJoseph Smerinaspecial
04/29/2026Shutoff dampersJoseph Smerinaenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
04/29/2026Mechanical SystemsJoseph Smerinaspecial
04/29/2026Energy Code Compliance InspectionsJoseph Smerinaprogress
04/29/2026FinalJoseph Smerinaprogress
04/29/2026Fire-Resistance Rated ConstructionJoseph Smerinaprogress
04/29/2026HVAC-R and service water heating system controlsJoseph Smerinaenergy_progress
04/29/2026Maintenance informationJoseph Smerinaenergy_progress
04/29/2026Duct leakage testing, insulation and designJoseph Smerinaenergy_progress
04/29/2026HVAC-R and service water piping design and insulationJoseph Smerinaenergy_progress
04/29/2026HVAC-R and service water heating equipmentJoseph Smerinaenergy_progress
01/19/2026Energy Code Compliance InspectionsJoseph Smerinaprogress
Latest 25 of 60.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/18/2026S01259179-P1Request digital key ↗
08/18/2026S01259179-S1Request digital key ↗
08/18/2026S01259179-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/12/2021520461492Open ↗
03/10/2021520461492Open ↗
▸BISWORK PERMIT APPLICATION1
04/19/2023520461492Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/15/2021520461492Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026S01259179-P1Open ↗
08/26/2026S01259179-I1Open ↗
08/26/2026S01259179-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026S01259179-P1Open ↗
08/18/2026S01259179-S1Open ↗
08/18/2026S01259179-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026S01259179-P1Open ↗
08/26/2026S01259179-I1Open ↗
08/26/2026S01259179-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/12/2021520461492Open ↗
03/11/2021520461492Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/11/2021520461492Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01340471-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/18/2026S01259179-P1Open ↗
08/18/2026S01259179-S1Open ↗
08/18/2026S01259179-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/17/2021520461492Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
03/10/2021520461492Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/11/2021520461492Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
03/17/2021520461492Open ↗
03/15/2021520461492Open ↗
▸BISEFILING COVER SHEET1
03/10/2021520461492Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026S01340471-I1Open ↗