← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
413 GREENWICH STREET
MANHATTAN · BIN 1002800
💬 Discuss this project
1889Year Built
5Stories
D0Building Class
C6-2AZoning
6,330 sfGross Floor Area
5Units
Rent Stabilized0 Active Violations 7 likely answered ▸FDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: 413 Greenwich · 1,325 sf lot · 4.78 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof413 Greenwich Street CORP11p · 2 filings · 20 docs
Floor 1413 Greenwich Street CORP34p · 3 filings · 20 docs
Cellar413 Greenwich Street CORP5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
413 Greenwich3506/28/2026
Lapp Realty303/21/2026
Tribecca Realty203/22/2026
73 Cranberry St203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF Engineering511/24/2025
Andrew Reyniak Architect211/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Olive's703/21/2026
Olives703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fabrizzio ConstructionGeneral Contractor304/09/2026
Metro Fire ProtectionFire Protection103/21/2026
B S RestorationGeneral Contractor103/21/2026
Preininger ConstructionGeneral Contractor103/21/2026
Rise ConstructionGeneral Contractor103/21/2026
Superior Air Systems MechanicalGeneral Contractor103/21/2026
Northeast Plumbing & HeatingPlumbing103/21/2026
Pace PlumbingPlumbing103/21/2026
Wagner Ziv Plumbing & HeatingPlumbing103/21/2026
Fabrizzio Constructionspecialty_contractor104/10/2026
L & N PlumbingPlumbing106/28/2026
Dim ContractingGeneral Contractor108/07/2001
DJM Contracting ServicesGeneral Contractor108/27/2001
Do Rite MechanicalPlumbing110/22/2014
Ideal Fire ControlFire Protection107/16/1999
Kevin BellGeneral Contractor109/24/2014
Monaco ConstructionGeneral Contractor106/21/2000
Plumbing ServicePlumbing110/12/2000
Triangle Plumbing & HeatingPlumbing112/08/1993
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSF Engineering1274211/24/2025
Andrew Reyniak Architect4712511/20/2025
Building Lifecycle
09/22/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/24/2026
Signed off — Alteration
Mechanical work for Olives restaurant including commercial kitchen rangehood ventilation system and replacement of rooftop termination below the parapet. No change of use, occupancy or egress.
M01185780-I1
04/08/2026
Permit issued — Mechanical Systems
M01185780-I1-MS
04/03/2026
Signed off — Alteration
Renovation of an existing restaurant. No change to use, occupancy or egress
M01102009-I1
03/04/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
M01181156-I1-PL
99 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFabrizzio Construction04/08/2026
DOB NOWGeneral ConstructionSigned-offFabrizzio Construction04/15/2025
DOB NOWPlumbingPermit IssuedL & N Plumbing03/04/2025
DOB NOWGeneral ConstructionSigned-offFabrizzio Construction01/14/2025
BISPLISSUEDPace Plumbing05/30/2023
BISPLISSUEDPace Plumbing01/10/2022
BISSPISSUEDPace Plumbing11/17/2020
BISPLISSUEDPace Plumbing11/17/2020
BISPLISSUEDDo Rite Mechanical10/22/2014
BISOTISSUEDKevin Bell09/24/2014
BISSPISSUEDMetro Fire Protection04/01/2014
BISPLISSUEDNortheast Plumbing & Heating03/20/2014
BISMHISSUEDSuperior Air Systems Mechanical03/18/2014
BISOTISSUEDPreininger Construction03/18/2014
BISEQISSUEDB & S Restoration03/06/2009
BISPLISSUEDWagner Ziv Plumbing and Heating03/20/2007
BISOTISSUEDRise Construction of NY03/09/2007
BISOTISSUEDDJM Contracting Services08/27/2001
BISOTISSUEDDim Contracting08/07/2001
BISPLISSUEDBranch Plumbing10/12/2000
BISMHISSUEDMonaco Construction06/21/2000
BISFPISSUEDIdeal Fire Control07/16/1999
BISOTISSUEDQuality Mechanical Contractors I12/08/1993
BISPLISSUEDRooter Plus12/08/1993
1 project · most recent 11/24/2025
Ventilation Systems
FiledStatusContractorScope
11/24/2025Signed-offFabrizzio ConstructionVentilation Systems
1 project · most recent 07/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2025Permit IssuedL & N PlumbingGas, Water/Sanitary
3 projects · most recent 01/30/2025
General Wiring
FiledStatusContractorScope
01/30/2025CompleteLaredo ElectricGeneral Wiring
06/04/2018CompleteMaximum ElectricGeneral Wiring
05/07/2018Permit IssuedMaximum ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/21/2025FinalAndrew Reyniakprogress
11/21/2025Fire-Resistant Penetrations and JointsAndrew Reyniakspecial
11/20/2025Mechanical SystemsNicholas Tuccispecial
11/20/2025FinalNicholas Tucciprogress
07/10/2025Fire-Resistant Penetrations and JointsAndrew Reyniakspecial
02/19/2025FinalAndrew Reyniakprogress
02/19/2025Fire-Resistant Penetrations and JointsAndrew Reyniakspecial
109 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account