1867Year Built
4Stories
C1Building Class
R6BZoning
2,468 sfGross Floor Area
8Units
Rent Stabilized24 Open Violations 23 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: 33 VANDERBILT AVENUE, LLC · 1,500 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION CORP503/22/2026
33 VANDERBILT AVENUE, LLC103/22/2026
413 PACIFIC ST LLC403/22/2026
459 CHAUNCEY STREET503/21/2026
RED CANYON PROPERTIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC810/28/2024
TECHNEMOTION DESIGN209/14/2020
HAIDER ENGINEERING, P.E.101/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYDRAULICS MECHANICAL INCPlumbing807/08/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
JUAHOL CONSTRUCTION INCGeneral Contractor303/21/2026
MARIO CASTROElectrical303/21/2026
L&J PLG & HTG CO OF NY INPlumbing207/08/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
SHANE WALTERSGeneral Contractor107/08/2026
FAJARDO, JOSEElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422310/28/2024
Building Lifecycle
All (77)Filed (11)Permit Issued (6)Signed Off (3)Violation (31)Inspection (2)Objection (2)Special Inspection (22)
07/06/2026
Permit issued — General Construction
B01113776-I1-GC
05/05/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2025
Violation issued (HPD, open)
A
12/09/2024
Objection resolved — Addressed
10/30/2024
Objection raised — Other
10/28/2024
Filed — Alteration
B00836812-I1
10/28/2024
Filed — Alteration
APPLICATION FILED FOR RESTORE TO ORIGINAL CONDITIONS APARTMENTS 1A AND 1B ON FIRST FLOOR AS PER PLANS SUBMITTED. COMBINATION OF APARTMENTS WAS FILED AND SIGNED OFF UNDER #B00836792.
B01113776-I1
10/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
10/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
10/08/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
10/08/2024
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
10/08/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2024
Special inspection requirement — Final
SERDAR CEYLAN
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2023
Signed off — Alteration
COMBINING APARTMENTS #1A AND #1B AT FIRST FLOOR OF MULTI-FAMILY WALK-UP BUILDINGS AS PER TPPN #3/97. NEW APARTMENT NUMBER WILL BE NAMED AS 1BA . NO CHANGE IN BULK, USE OR EGRESS UNDER THIS APPLICATION
B00836792-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2023
Filed — Alteration
COMBINING APARTMENTS #1A AND #1B AT FIRST FLOOR OF MULTI-FAMILY WALK-UP BUILDINGS AS PER TPPN #3/97. NEW APARTMENT NUMBER WILL BE NAMED AS 1BA . NO CHANGE IN BULK, USE OR EGRESS UNDER THIS APPLICATION
B00836792-P1
06/13/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Lighting controls
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Final
SERDAR CEYLAN
06/13/2023
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
04/27/2023
Permit issued — General Construction
B00836792-I1-GC
04/26/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Violation issued (HPD, closed)
A
03/09/2023
Filed — Alteration
COMBINING APARTMENTS #1A AND #1B AT FIRST FLOOR OF MULTI-FAMILY WALK-UP BUILDINGS AS PER TPPN #3/97. NEW APARTMENT NUMBER WILL BE NAMED AS 1BA . NO CHANGE IN BULK, USE OR EGRESS UNDER THIS APPLICATION
B00836792-I1
03/01/2022
Violation issued (HPD, closed)
A
01/13/2022
Signed off — Alteration
THE JOB IS FILED FOR REPLACING ALL EXISTING WATER RISERS (1") AND THE EXISTING PLUMBING FIXTURES AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00475593-I1
01/11/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/20/2021
Filed — Alteration
THE JOB IS FILED FOR REPLACING ALL EXISTING WATER RISERS (1") AND THE EXISTING PLUMBING FIXTURES AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00475593-P3
11/22/2021
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
11/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
08/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2021
Permit issued — Plumbing
B00475593-I1-PL
07/15/2021
Filed — Alteration
THE JOB IS FILED FOR REPLACING ALL EXISTING WATER RISERS (1") AND THE EXISTING PLUMBING FIXTURES AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00475593-P2
07/15/2021
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
07/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
04/27/2021
Filed — Alteration
THE JOB IS FILED FOR REPLACING ALL EXISTING WATER RISERS (1") AND THE EXISTING PLUMBING FIXTURES AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00475593-P1
04/12/2021
Violation issued (HPD, closed)
A
04/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
04/11/2021
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
03/30/2021
Filed — Alteration
THE JOB IS FILED FOR REPLACING ALL EXISTING WATER RISERS (1") AND THE EXISTING PLUMBING FIXTURES AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00475593-I1
09/23/2020
Signed off — Alteration
Replace plumbing fixtures at kitchen sink and bathroom on existing roughing for apartment 1B
B00365700-I1
09/15/2020
Permit issued — Plumbing
B00365700-I1-PL
09/14/2020
Filed — Alteration
Replace plumbing fixtures at kitchen sink and bathroom on existing roughing for apartment 1B
B00365700-P1
07/22/2020
Permit issued — Plumbing
B00365700-I1-PL
07/07/2020
Filed — Alteration
Replace plumbing fixtures at kitchen sink and bathroom on existing roughing for apartment 1B
B00365700-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/28/2019
Permit issued — Supported Scaffold
B00122625-I1-SF
01/25/2019
Filed — Alteration
B00122625-I1
10/19/2018
Violation issued (HPD, closed)
I
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSHANE WALTERS07/06/2026
DOB NOWGeneral ConstructionSigned-offJUAHOL CONSTRUCTION INC04/27/2023
DOB NOWPlumbingSigned-offHYDRAULICS MECHANICAL INC07/23/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN09/15/2020
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN07/22/2020
DOB NOWSupported ScaffoldPermit IssuedHKS CONSTRUCTION CORP01/28/2019
BISOTISSUEDMDC CONTRACTING CORP07/07/2020
BISOTISSUEDSHANE WALTERS05/25/2018
BISOTISSUEDSHANE WALTERS02/12/2018
BISBLISSUEDS.J. FUEL CO., INC04/08/2008
BISFBISSUEDEMPIRE STATE FUEL OIL CO.01/14/1992
8 projects · most recent 07/29/2021
General Wiring
FiledStatusContractorScope
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/29/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/28/2024Tenant Protection Plan ComplianceSERDAR CEYLANspecial
10/28/2024Tenant Protection Plan Compliance—special
10/28/2024HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
10/08/2024Interior lighting powerSERDAR CEYLANenergy_progress
10/08/2024Insulation placement and R valuesSERDAR CEYLANenergy_progress
10/08/2024Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
10/08/2024Lighting controlsSERDAR CEYLANenergy_progress
09/18/2024FinalSERDAR CEYLANprogress
06/13/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
06/13/2023Interior lighting powerSERDAR CEYLANenergy_progress
06/13/2023Lighting controlsSERDAR CEYLANenergy_progress
06/13/2023Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
06/13/2023Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
06/13/2023FinalSERDAR CEYLANprogress
06/13/2023Insulation placement and R valuesSERDAR CEYLANenergy_progress
04/26/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/22/2021Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/22/2021HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
07/15/2021Energy Code Compliance InspectionsSERDAR CEYLANprogress
07/15/2021HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
04/11/2021HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
04/11/2021Energy Code Compliance InspectionsSERDAR CEYLANprogress
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00365700-I1Request digital key ↗
09/01/2026B00475593-P3Request digital key ↗
09/01/2026B00475593-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch4
08/27/2026B00836792-I1Request digital key ↗
08/27/2026B00836792-P1Request digital key ↗
08/23/2026B00836812-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00122625-I1Request digital key ↗
▸Applications & Permits20
▸DOB NOWLPC Approval/Permit10
09/01/2026B00475593-P2Open ↗
09/01/2026B00475593-P3Open ↗
09/01/2026B00475593-P1Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
07/07/2020340737224Open ↗
07/02/2020340737224Open ↗
05/29/2018321722971Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
06/19/2020340737224Open ↗
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B00836812-I1Open ↗
09/02/2026B00836812-I1Open ↗
09/01/2026B00836792-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00122625-I1Open ↗
09/01/2026B00475593-P3Open ↗
09/01/2026B00475593-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/19/2020340737224Open ↗
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/18/2019321722971Open ↗
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00836792-P1Open ↗
09/01/2026B01113776-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/19/2020340737224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/19/2020340737224Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/18/2008310101430Open ↗
03/10/2008310101430Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00475593-P2Open ↗
09/01/2026B00475593-P3Open ↗
09/01/2026B00475593-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/19/2020340737224Open ↗
05/17/2018321722971Open ↗
09/15/2017321646028Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/10/2008310101430Open ↗
▸Energy Compliance7
▸BISAS-BUILT ENERGY ANALYSIS2
10/19/2020340737224Open ↗
07/18/2019321722971Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/18/2019321722971Open ↗
05/17/2018321722971Open ↗
▸BISNYCECC ANALYSIS1
06/19/2020340737224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/19/2020340737224Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00475593-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/23/2020340737224Open ↗
10/23/2020340737224Open ↗
07/07/2020340737224Open ↗
Showing 3 of 4 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
03/10/2008310101430Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLANDMARKS APPROVAL4
06/19/2020340737224Open ↗
07/18/2019321722971Open ↗
05/17/2018321722971Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/23/2020340737224Open ↗
07/18/2019321722971Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/10/2008310101430Open ↗
▸BISLANDMARKS SIGNOFF1
10/23/2020340737224Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/19/2020340737224Open ↗
06/19/2020340737224Open ↗
07/18/2019321722971Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
05/17/2018321722971Open ↗
09/13/2017321646028Open ↗
▸BISBOROUGH INTAKE FORM1
07/18/2019321722971Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2020340737224Open ↗