ECB07/09/2025OBSERVED PARTIAL DEMOLITION, STRUCTURAL WORK AND GUT REHAB BEING PERFORMED ON BUILDING. ROOF PARTIALLY DEMOLISHED AT EXP#3 SETBACK, INTERIOR DEMOLITION, INCLUDING PLUMBING AND ELECTRICAL. POSSIBLE BUILDING ENLA$2K due
ECB07/08/2026AT THE TIME OF MY INSPECTION OBSERVED SITE MISSING .3307.7.3 SHALL BE BLOCKED WITH NON-FRANGIBLE ACRYLIC PANELING OR EQUIVALENT MATERIAL. SITE MUST MAINTAIN CONSTRUCTION FENCE AT ALL TIMES PER CHAPTER 33 BC 33Hearing held — result not yet published$1K proposed
ECB07/11/2025AT THE TIME OF MY INSPECTION I OBSERVED A PILE OF MIXED DEBRIS CONSISTING OF ROOFING MATERIALS, PAPER AND WOOD AT EXPOSURE #3 WHICH CREATES A HAZARDOUS FIRE CONDITION FOR PUBLIC AND PROPERTY., DEBRIS WERE OBSERHearing held — result not yet published
Two stories - detached, small or mid-size · 2,500 sf lot · 0.6 FAR built · Flood zone X