DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/27/2024STRUCTURE RENDERED NON COMPLAINT. OBSERVED AT 2ND FLOOR APARTMENT WINDOWS AND DOORS OUT, CEILING AND WALLS DAMAGED, SMOKE AND WATER DAMAGE, SKYLIGHT DAMAGED DUE TO FIRE AND FIREFIGHTER OPERATION AT 416 AVENUE M. VACATE 2ND FLOOR APARTMENT.
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB07/16/2019FTM:1FLR JOIST SEVERE DETERIOR&SAGGING@REAR 20'&VARIOUS AREAS 1FLR EXP 3/4 QUADRANT APPROX 10'WX6'D HAD UNPERMITT NON-ENGINEERED WOOD JOIST REPLACED.WOOD STRINGER@EXP4 FDN HAD UNPERMITT SHOR.1FLR FRAMG@FRNT 6' WERE UNDERSIZE FOR 1FLR LOADS.OWNR ENGAGE NYS PE EVAL ENTIRE BLDG&PREP SHOR&REPR DWGS.REPR BLDG UNDER PERMIT STRT BY 8/5/19&CMPL BY 9/27/19
DOB07/16/2019EMERG WRK ORD:1FLR JOIST SEVERELY DETERIOR&SAGGING@REAR 20'& VARIOUS AREAS.1ST FLR EXP 3/4 QUADRANT APPROX.10'WX6'D HAD UNPERMITT NON-ENGIN WOOD JOIST REPLACED.WOOD STRINGER@EXP3 FDN HAD UNPERMITT SHORING.OWNR ENGAGE PE&CONTR IMMED INSTL 1ST FLR SHOR@CELLAR UNDER CONT/FULL TIME DIRECT SUPV OF PE&DAILY REPTS TO FEU. FILE JOB WITHIN 2 DAYS START WRK
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB07/25/1994V-DOB VIOLATION - ACTIVE
ECB06/26/2025FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000101843N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FONothing owed — awaiting certificate of correction
ECB06/27/2024FIRE SEPARATION IS REQUIRED BETWEEN ADJOINING PROPERTIES. ANY PENETRATION REQUIRED FIRE PROTECTION, FIRE RATED DOOR OR SPRINKLER AND/OR FUSIBLE LINK. OBSERVED AT 1ST FLOOR 2 OPENING BETWEEN 414 AND 416 BUILDINGNothing owed — awaiting certificate of correction
ECB03/23/2022FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407336X ISSUED ON 07/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUILNothing owed — awaiting certificate of correction
ECB11/18/2021FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407336X ISSUED ON 07/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF CNothing owed — awaiting certificate of correction
ECB09/09/2021FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407336X ISSUED7/16/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTE:JOB321629564 RELATEDNothing owed — awaiting certificate of correction
ECB05/06/2021FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407336X ISSUED ON 07/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNNothing owed — awaiting certificate of correction
ECB01/15/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407336X ISSUED ON 07/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PUSUANTNothing owed — awaiting certificate of correction
ECB02/13/2020FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407336X ISSUED ON 07-16-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. REMEDY: COMPNothing owed — awaiting certificate of correction
ECB11/14/2019FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407336X ISSUED ON 07-16-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER NOTED AT 1STNothing owed — awaiting certificate of correction
ECB09/30/2019FAILURE TO COMPLY WITH COMMISSIONER ORDER CONTAINED IN SUMMONS/VIOLAT ON#39000982P ISSUED ON 12-17-2018 AND TO FIEL A CERTIFICATE OF CORREC ION PURSUANT TO 28-201.1 AND 1RCNY 102-01(D)(2) AN ACCEPTIBLE CERTIFICNothing owed — awaiting certificate of correction
ECB09/19/2019FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407336X ISSUED ON 07-16-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT 1ST FLOORNothing owed — awaiting certificate of correction
ECB12/18/2018INADEQUATE FRESH AIR TO CELLAR FOR TWO BOILERS AND TWO HWH'S AND GAS METERS-BOILER PERMIT EXPIRED WITHOUT DOB SIGNOFF (BURNHAM-105,000BTU)Nothing owed — awaiting certificate of correction
ECB12/18/2018NEWYORKER BOILER 103,000BTU WITH 2015 DATE STAMP IS INSTALLED AND HEATING THE BUILDING NEXT DOOR 416 AVE M WITHOUT DOB PERMIT, OBTAIN PERMIT AND SIGNOFFNothing owed — awaiting certificate of correction
ECB12/18/2018NEWYORKER BOILER IS UNREGISTERED-THE BOILER SAFETY IS LEAKING-THE HWH FLUE IS CORRODED-THE HWH SAFETY VALVE DISCHARGE IS NOT COPPER-WIRES ARE EXPOSED ABOVE BOILER-THE REMOTE SWITCH IS MISSING, REGISTER THE BOILNothing owed — awaiting certificate of correction