← Back
Primarily 4 family with 1 store or office
414 JERSEY STREET
STATEN ISLAND · St. George-New Brighton · BIN 5001084
💬 Discuss this project
1900Year Built
3Stories
S4Building Class
R5Zoning
6,900 sfGross Floor Area
5Units
Rent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: LUCKY CAI 519 INC. · 3,600 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 7 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAJEAS ROSE GARDEN NAIL SPA507/08/2026
LUCKY CAI 519 INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.208/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EL CHOUM CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST RESPONSE CLEANING CGeneral Contractor303/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781208/18/2021
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (2)Objection (4)Special Inspection (4)
11/26/2025
Violation issued (HPD, closed)
I
06/01/2022
Signed off — Alteration
INTERIOR RENOVATION AT FIRST-FLOOR NAIL SALON. INSTALL PLUMBING AND MECHANICAL SYSTEM. REPLACE EXISTING HUNG CEILING SUPPORT SYSTEM WITH BLACK IRON AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY DONE UNDER THIS APPLICATION.
S00567120-I1
06/01/2022
Signed off — Alteration
INTERIOR RENOVATION AT FIRST-FLOOR NAIL SALON. INSTALL PLUMBING AND MECHANICAL SYSTEM. REPLACE EXISTING HUNG CEILING SUPPORT SYSTEM WITH BLACK IRON AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY DONE UNDER THIS APPLICATION.
S00567090-I1
04/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2021
Permit issued — Plumbing
S00567120-I1-PL
09/21/2021
Permit issued — General Construction
S00567090-I1-GC
08/31/2021
Objection raised — Scope
08/31/2021
Objection resolved — Addressed
08/26/2021
Objection raised — Scope
08/26/2021
Objection resolved — Addressed
08/18/2021
Filed — Alteration
INTERIOR RENOVATION AT FIRST-FLOOR NAIL SALON. INSTALL PLUMBING AND MECHANICAL SYSTEM. REPLACE EXISTING HUNG CEILING SUPPORT SYSTEM WITH BLACK IRON AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY DONE UNDER THIS APPLICATION.
S00567120-I1
08/18/2021
Filed — Alteration
INTERIOR RENOVATION AT FIRST-FLOOR NAIL SALON. INSTALL PLUMBING AND MECHANICAL SYSTEM. REPLACE EXISTING HUNG CEILING SUPPORT SYSTEM WITH BLACK IRON AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY DONE UNDER THIS APPLICATION.
S00567090-I1
08/18/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
08/18/2021
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC11/15/2021
DOB NOWGeneral ConstructionSigned-offFIRST RESPONSE CLEANING C09/21/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/18/2021FinalCHRISTIAN LOZADAprogress
08/18/2021Lighting controlsCHRISTIAN LOZADAenergy_progress
07/29/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/29/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026S00567090-I1Request digital key ↗
08/15/2026S00567120-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026S00567090-I1Open ↗
08/13/2026S00567120-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S00567090-I1Open ↗
09/01/2026S00567090-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00567090-I1Open ↗
08/31/2026S00567120-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026S00567090-I1Open ↗
08/13/2026S00567120-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00567090-I1Open ↗